When industry and labor work together, we can save lives. OSHAS NEW STEEL ERECTION STANDARD.
The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a...
Transcript of The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a...
![Page 1: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/1.jpg)
The Quest
Learning LEAN in Botswana
![Page 2: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/2.jpg)
Journey with me as we travel to a Toyota
dealership in Northern Botswana, nestled between the vast
Kalahari Desert and the meandering Okavango Delta
![Page 3: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/3.jpg)
We are here!
![Page 4: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/4.jpg)
While we are looking at maps
we need to understand some differences, let’s
compare.
![Page 5: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/5.jpg)
![Page 6: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/6.jpg)
If you lived in Botswana instead of the United Kingdom
you would…
![Page 7: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/7.jpg)
•Be 115 times more likely to have HIV/Aids. •Die 26 years sooner. •Make 56 percent less money. •Be part of a population of only 2.2 million people.
![Page 8: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/8.jpg)
Global Competitiveness Report 2013-2014 has
for the sixth year running described Botswana’s poor work ethic as the
most problematic factor for doing business in the
country.
![Page 9: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/9.jpg)
Tsabong
Kasane We service a vast rural area North West and Ghanzi districts.
At times we even supply parts and service to Tsabong in the south of the country.
We are Here!
![Page 10: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/10.jpg)
![Page 11: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/11.jpg)
Lots of the time we do this in 40
degree heat.
![Page 12: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/12.jpg)
As you know all great quests start with a
crisis!!!!
![Page 13: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/13.jpg)
![Page 14: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/14.jpg)
In 2013 we were sold to the Halfway Group after
being owned and managed by the same
shareholders for over 25 years. It was a time of
fear and insecurity.
![Page 15: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/15.jpg)
Sadly, Ngami Toyota was affectionately called “The Salt
Mine” by the previous owners.
![Page 16: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/16.jpg)
I personally have always likened her more to a dragon, a real live fire
breathing dragon..
![Page 17: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/17.jpg)
She generated much gold. But did not release it
willingly. Often owners, staff and management came out of
the fray singed and wounded.
![Page 18: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/18.jpg)
![Page 19: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/19.jpg)
With time she grew. The bigger she got the more
out of control she became. The only way the
managers and owners knew how to control her was with heavy chains made of the word NO.
![Page 20: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/20.jpg)
![Page 21: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/21.jpg)
But in August 2013 two brave knights of LEAN
came into our lives.
![Page 22: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/22.jpg)
![Page 23: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/23.jpg)
So the old owners of the dragon now exhausted and
scarred retired from the fight and left us behind with
new owners and new ways.
It was a scary time for all the
staff especially those who had worked for the
company for many years.
They bought with them a gift that I call
“Doragon no sasayaki” (dragon whisperer).
AKA - LEAN
![Page 24: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/24.jpg)
This is really a story of how we learned to use LEAN to
bring a dragon of a business under harness.
![Page 25: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/25.jpg)
![Page 26: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/26.jpg)
This in turn made a big difference to our
productivity and cash flow.
![Page 27: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/27.jpg)
Actual Numbers 2013 2015 Monthly Average Turnover BWP10.6M BWP16.7M Profit BWP1.8M BWP3.8M Free Cash BWP13M BWP34M
If we index this and say year 2013 is 100
Turnover 100 157 Profit 100 211 Free cash 100 261
![Page 28: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/28.jpg)
We started our journey by
understanding that time is value to the
customer.
![Page 29: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/29.jpg)
Time is value During our first days of training Dave Brunt started to count seconds when we were looking at “the work”. At that moment Africa time got a violent jolt, there might even have been a small earth tremor!
![Page 30: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/30.jpg)
So I looked for ways to teach Africa about
time.
![Page 31: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/31.jpg)
Lesson 1 Time has a beginning and an end. Each nut =10 minutes Red nut = hour Total 12 and ½ hours
![Page 32: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/32.jpg)
½ hour time slots
Start of day
3.30 in the afternoon
![Page 33: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/33.jpg)
Start of day
Progress of the Vehicle Control
Board
Movement of Vehicle End of day
![Page 34: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/34.jpg)
Waiting for parts using tally chips. Lesson- don’t get lost in time!
![Page 35: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/35.jpg)
We then learnt about Standard Work to build in quality as a value to
the customer.
![Page 36: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/36.jpg)
Standard Work Wash Bay
![Page 37: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/37.jpg)
We used toys to design and communicate movement.
![Page 38: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/38.jpg)
Not that we do not also use other more conventional ways to
communicate.
![Page 39: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/39.jpg)
We learnt about Kaizen
And began to understand that Kaizen can only be done after watching and understanding the work.
![Page 40: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/40.jpg)
A wheel bearing being packed by hand.
![Page 41: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/41.jpg)
A wheel bearing being packed by our own tool design with a time saving of 20 minutes.
![Page 42: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/42.jpg)
Our Electric Bay Stand
![Page 43: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/43.jpg)
Using plastic gutters for oil filter drainage.
Which one was here first?
![Page 44: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/44.jpg)
We built our own engine stand to hold a Cruiser 4.2 engine as we found that the off the shelf stands were to weak and the wheels to small for the weight.
Simple drive through wet and
soap saves 5 minutes per vehicle
![Page 45: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/45.jpg)
We built our own engine stand to hold a Cruiser 4.2 engine as we found that the off the shelf stands were to weak and the wheels to small for the weight.
Additionally, we found that it also helped to
stimulate problem
solving and creativity.
We saw that using toys to explain purpose, movement and dimensions helped people who
are not able to visualize or read a diagram.
![Page 46: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/46.jpg)
We started to learn about Flow……
![Page 47: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/47.jpg)
Parking Zone
![Page 48: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/48.jpg)
Batch Production
Vehicles were coming out randomly
at 31minutes average per wash with poor quality.
Wash & Valet Clean
Vehicles were coming out at a steady flow
average of 1 every 16 minutes with good
quality.
Single Lane Flow
![Page 49: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/49.jpg)
Automation Let us go back and be reminded how simple and inexpensive automation can improve flow taking additional time off the wash and valet.
![Page 50: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/50.jpg)
Two Stage Service
One stage service average flat rate of 33.7 minutes being done in 26.5 minutes this is 122% efficiency. Two stage service average flat rate of 58.1minutes being done in 20.9 minutes this is 280% efficiency.
Stage 1 Express service Stage 2 Express service
![Page 51: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/51.jpg)
Orange Bay – Pre Diagnostic Bay The Orange Bay (Pre-Diagnostic Bay) was
put in place to make unpredictable work into predictable work without disrupting
flow.
We hope to send a vehicle off to the Pre-Diagnostic Bay with a go ahead and parts
so that the technician receiving the vehicle could start and finish the job
without interruption.
![Page 52: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/52.jpg)
2014 Before Orange Bay
2015 After Orange Bay
![Page 53: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/53.jpg)
A local Tin Smith made us post boxes using the traditional American
design. We then made collection times. This is part of what we know as our milk round AKA Ngami Post!
![Page 54: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/54.jpg)
Teaching the dragon to dance.
![Page 55: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/55.jpg)
As we improved flow we struggled to get past 30
vehicles a day without a “all fall down”
The problem being that administration could not keep up with the flow of
vehicles.
![Page 56: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/56.jpg)
“Department of Hero’s and Fire fighter’s”
Guaranteed to provide erratic service and get
things done in ½ measures.
Ngami Toyota Service
Administration
![Page 57: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/57.jpg)
I took the step of putting the complete administration of
service and repair into a single lane flow from start to end.
I was very afraid! I started the process by
mapping skill levels we had and the ones we needed using
colour coding.
![Page 58: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/58.jpg)
![Page 59: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/59.jpg)
I then mapped the work using the time it took for each small task for one vehicle and who would be doing them – Just small portion of
the map.
![Page 60: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/60.jpg)
Putting admin into a single lane flow, smiley face for customer contact and working squares so we could see how to handle out of flow items.
![Page 61: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/61.jpg)
Then we started the big experiment!
![Page 62: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/62.jpg)
![Page 63: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/63.jpg)
84%86%88%90%92%94%96%98%
Apr-16 May-16 Jun-16 Jul-16
Four months into the experiment.
![Page 64: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/64.jpg)
We no longer need fire fighters or super hero’s !
We are now able to process 50 vehicles a day.
![Page 65: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/65.jpg)
None of this could have been
accomplished without 5S.
![Page 66: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/66.jpg)
2013
![Page 67: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/67.jpg)
2016
![Page 68: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/68.jpg)
Engine and Gearbox Room 2013
![Page 69: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/69.jpg)
Engine and Gearbox Room 2016
![Page 70: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/70.jpg)
Sometimes our Ngami dragon still slips the harness and goes on
the rampage. But there are more and more days
she sings and dances with joy to Song of Pull and all is right in our
world. Have you ever heard a dragon
sing?
![Page 71: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/71.jpg)
![Page 72: The Quest - Lean Enterprise Academy...We then learnt about Standard Work to build in quality as a value to the customer. Standard Work Wash Bay . We used toys to design and communicate](https://reader036.fdocuments.net/reader036/viewer/2022070720/5ee0e936ad6a402d666bfac7/html5/thumbnails/72.jpg)
What I learnt was that LEAN, like Arthurs sword “Excalibur”
honour’s those with the right hearts motivation.
Not that the tools do not work for everyone, but if you want to be a
“Real Dragon Whisperer” you must search your heart daily.