COLLIERS INTERNATIONAL P. 1 THE PROPERTY Stacking Plan Ecolab University Office Building 386 Wabasha Street North | St. Paul

Transcript of THE PROPERTY Stacking Plan - LoopNet · 2016. 5. 24. · installation of Schindler Miconic 10...

Page 1: THE PROPERTY Stacking Plan - LoopNet · 2016. 5. 24. · installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS Two enclosed stairwells

COLLIERS INTERNATIONAL P. 1

THE PROPERTY

Stacking PlanEcolab UniversityOffice Building386 Wabasha Street North | St. Paul

Page 2: THE PROPERTY Stacking Plan - LoopNet · 2016. 5. 24. · installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS Two enclosed stairwells

COLLIERS INTERNATIONAL P. 2

THE PROPERTY

Property Information

> BUILDING ADDRESS386 Wabasha Street NorthSt. Paul, MN

> BUILDING SIZE 154,604 SF

> CURRENT OCCUPANCY 100%

> YEAR BUILT 1971, renovated in 1997

> LOCATION The Property is located at the corner of 6th Street and Wabasha Street in St. Paul, MN.

> LAND SIZE 0.43 acres (18,731 square feet)

> NUMBER OF STORIES 16 stories with two lower levels used for mechanicals and storage. The 16th floor is also used for mechanical.

> PARKING No parking on site; however, it is directly adjacent and connected via skyway to expansive parking ramps adjoining the property.

> HVACHeating and cooling is provided by District Energy, St. Paul.

> EMSThe buildings HVAC systems are controlled and monitored by Trane Trace energy management control system, installed in 2001 and updated in 2011.

> WINDOWSThe building has an aluminum framed curtain wall system above the second floor (skyway) level, with 1” insulating vision glass and glossy finish opaque panes backed with 2” insulation.

> ROOFReinforced 60-mil EPDM roof replaced in 2001.

> ELEVATORSFour elevators serving lower level floors through floor 15. All elevators were updated in 2003 to include the installation of Schindler Miconic 10 elevator controls as well as updated cab finishes

> STAIRWELLSTwo enclosed stairwells in the core of the building and one open air stairwell between the first lower level and the plaza area.

> FIRE PROTECTION100% wet sprinklered

> SECURITYOn-site security guard in place6:30 a.m. - 8:00 p.m. Monday thru Friday8:00 a.m. - 1:00 p.m. Saturday

> ADJACENT USESWorld headquarters building for Ecolab and Alliance Bank Building, both connected with inside common access points.

> SKYWAYEcolab University is connected via skyway to Alliance Bank Building and is connected to the new Green Line transit station.

> ZONINGCentral Business District, per the City of St. Paul

> PARKINGThe skyway connected Alliance Bank Building’s parking structure features parking for 1,055 vehicles.

Page 3: THE PROPERTY Stacking Plan - LoopNet · 2016. 5. 24. · installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS Two enclosed stairwells

COLLIERS INTERNATIONAL P. 3

THE PROPERTY

Miss

issip

pi R

iver Sh

epar

d Rd

.

Kellogg Square Apartments

US Bank

BremerTower

Pointe of St. Paul

UBS Plaza

Kellogg Boulevard

Wells Fargo PlazaTravelers

I-94

Minneapolis CBD

Xcel Energy Center

Ecolab World

Headquarters1st National

Bank Building

Cray Plaza

4th Street 5th StreetCrown Plaza

LawsonSoftware

AllianceBank

Pioneer Endicott

St. Paul’s Cathedral

Securian400

Building

375 Jackson

Property Aerial

NORTH

386 Wabasha Ave

Page 4: THE PROPERTY Stacking Plan - LoopNet · 2016. 5. 24. · installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS Two enclosed stairwells

COLLIERS INTERNATIONAL P. 4

THE PROPERTY

NORTH

Property Aerial

Kellogg BoulevardScience Museum

Raspberry Island

Shepard Road

Wabasha Bridge

Rivercenter

Xcel Energy Center

State Capitol

St. Paul CathedralWellsFargoPlace

EcolabHeadquarters

USBank

UBSTower

Bremer Tower

CrownePlaza

386 Wabasha Ave

94 35E

Mississippi River

CrayPlaza

1st

NationalBank

Building

Page 5: THE PROPERTY Stacking Plan - LoopNet · 2016. 5. 24. · installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS Two enclosed stairwells

COLLIERS INTERNATIONAL P. 5

THE PROPERTY

Twin Cities Map

386 WABASHA AVENUE

Page 6: THE PROPERTY Stacking Plan - LoopNet · 2016. 5. 24. · installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS Two enclosed stairwells

COLLIERS INTERNATIONAL P. 6

THE PROPERTY

Area Map

386 WABASHAAVENUE

Page 7: THE PROPERTY Stacking Plan - LoopNet · 2016. 5. 24. · installation of Schindler Miconic 10 elevator controls as well as updated cab finishes > STAIRWELLS Two enclosed stairwells

COLLIERS INTERNATIONAL P. 7

THE PROPERTY

Site Plan

INDOOR WALKWAY

386 Wabasha

Avenue