The numbers of pessengers which are beneficiary to the services of public transport by Malatya Municipalities is increase about135.000 from 70.000. The vehicle fleet is getting strong day afterday, therefore the numbers of pessenger on the increase to. The firstmission is make to transpotation for the pessengers more economic, fast, safety and confortable.
For this purpose if we look the viewpoint of speed, safety, comfort and reliability wecould see how much important to making plan to urban roadways like a project of public transportation priority.
DEMAND OF PUBLİC TRANSPORT İN MALATYA
By our municipality, the tecnic team be tasked in order to examine to the transportation models all overthe World on 2012 year.
13.06.2012 –Kayseri
• İn İstanbul and Kayseri meetings we gotinformations about current public transport systems in the fields of properities andcapacities.
21.06.2012 –İstanbul
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA
Examined hihg capacityvehicles with lower fuil cost.PT: Public Transport
More Vehicles,
More Traffic,
Slower PT
İrregular urbanization,
More highway
Decrease in supply toPT,
More less charm cities,
Mobilization of activitiesin another cities
Shoddier PT,
More less PT customer,
Lower PT İncome
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA: EXAMİNED MODES
• High setup cost, long and hard constraction time, customer
capacity( for LRT; per hour 10.000-15.000,for metro 25000 and much)
need andUnbecome road network, all that
reasons,that choices is determined very risky and
early
LRT(Light railytransport)
METRO
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA: EXAMİNED MODES
• İf metrobusses works on preference roadits quality and pessenger capacity gonnabe almost the same with raily systems.
• But they are more efficently fromarticulated bus with respect of high fuilcost, vehicle life, high maintenence costsand above that all the emission..
METROBUS
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA: EXAMİNED MODES
BATTERY BUSSES
• İn this last years so many researches in TURKEYabout battery busses, reason is energyeconomy and air pollution stimulated bymunicipalities
• İts not preferabled becouse it’s still process in RAD (Research and development). There is weight and power problems on the vehiclesotherwise high vehicle cost and be of no useactively.
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA: EXAMİNED MODES
CNGBUSSES • A lot of city bought to that vehicles by reason of fuel
economy and environmental conscience in TURKEY• But this fuel economy decrease by reason of spare
part costs and maintenence costs. Otherwise, theCNG busses incerases to the greenhouse gas. Nearlythem spreads CO2 like dizel busses. Them spreadsmetan gas to. The metan gas has CO2 more thangreenhouse gas almost 21 times.
• All that reason the CNG busses not be preferred
TROLEYBÜS
• To be detected trolleybus systems of Solingen in Germany, Lyon in France,
Zurich, Cenevre and Lozan in Switzerland.
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA: EXAMİNED MODES
TROLLEYBUS İN THE WORLD
System Vehicle
Eastern Europe 64 4.482
Western Europe 48 1.893
Eurasia 189 26.666
North America 9 1.926
South America 13 828
Africa 0 0
Australia 1 60
Asia 39 4.810
Total 363 40.665
TROLLEYBUS İN EUROPE
System Vehicle
Australia 4 131
Belgia 1 20
France 6 199
Germany 3 104
Greece 2 350
İtaly 14 388
Netherland 1 48
Norway 1 15
Portugal 1 20
Switzerland 15 618
Total 48 1.893
THE PROCESS OF PUBLİC TRANSPORT IN MALATYA: EXAMINED MODESMETROBUS TROLLEYBUS LRT
Pessenger capacity
Pessenger capacity/Hour (Malatyapessenger/Hour):6500
6.000-10.000 (can
increase to the number of
vehicles)
6.000-10.000 (can increase
to the number of vehicles)10.000-24.000
Fuel costs 2.25(TL/Km) 0.78(TL/Km) 0.81(TL/Km)
Environmental cleaning(Emission)
25.05(hc) 0 0
Suitability to the physical conditions Well (Especially can put it on
two sides on the belt highway)
Well (Especially can put it on
two sides on the belt highway)İt ain’t fittin
System transposability Portable Portable Unportable
Comfort High High Ultrahigh
Time of construction Short Middle Long
Vehicle lifeBetween the years of
15-20Between the years of
26-34Between the years of
30-40
Maintenence costs High Low Low
Failure frequency High Low Low
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
LOW İNVESTMENT COST
FAST COURSE OF
CONSTRUCTİONLOW FUEL COST
TROLLEYBUS
After that all research it was decidedto the trolleybus system in Malatya
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
We can answer to this question to the 3 major topic
These;
1. Cost,
2. Pessenger,
3. Operator
1. Cost;• Lower infrastructure cost• Lower operate cost by force of
more pessenger.
2. Pessenger;• More invironmental and
silent• More powerfull and
unshakable breaking• Fast, comfortable and
reliable
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
3. Operate Lower fuel cost More less kinematical pieces Longer vehicle life High pessenger pleasure
More less fuel cost by comparison diesel buses 4 times
They have no external dependence cousethem electrical. For this reason there is stability of fuel cost in the long run.
Although available cost instability of fossilfuel, as well in the long run electric costsbecomes more suitable.
0,1
29
75
0,1
27
80
0,1
27
80
0,1
27
80
0,1
27
80
0,1
24
05
0,1
48
30
0,1
79
44
0,1
98
03
0,2
37
34
0,2
83
86
0,2
83
86
0,3
10
48
1,2
50
00
1,3
50
00 1
,80
00
0
2,0
00
00
2,3
00
00
2,5
50
00
2,4
50
00
2,7
00
00 3
,15
00
0
3,8
50
00
4,1
00
00 4
,50
00
0
4,3
00
00
0,00000
0,50000
1,00000
1,50000
2,00000
2,50000
3,00000
3,50000
4,00000
4,50000
5,00000
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Elektrik (kwH/TL) Dizel (Lt/TL)
(*)EPDK resmi verileri
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
• İnfrastructure cost is more less than raily systems.
• İnfrastructure cost of raily systems is almost 2.5 million Euro. But to the trolleybus systemsalmost 800.000 Euro.
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
• Trolleybusses is environmental vehicles. They have no pollution byforce of zero emission.
• They have less noise pollution more then all the other publictransport systems.
dbA
Hearing loss 90+
Diesel bus 80-90
CNG bus +75
Trolleybus 60-70
Silent streets 60
Statement Diesel Hybrit CNG Trolleybus
Per year CO2 oscillation
(Tone)140,852 117,377 113,397 54,487
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
40.000.000 €
5.000.000 €
1.500.000 €
0 € 10.000.000 € 20.000.000 € 30.000.000 € 40.000.000 € 50.000.000 €
Metro
Tramvay
Tram-Bus
Total Cost(km/€)
THE PROCESS OF PUBLİC TRANSPORT İN MALATYA : WHY TROLLEYBUS
Maintenence of Trolleybus Buying new diesel bus
Buying new Trolleybusİncreasingenergy cost
İNDİCATOR % EXPENCES OF YEAR BY YEAR
İt was hard to passing to the İnönü Street couse of process of infrastructure and density.
This stage to be determinated stand over becouse thisStreet has traffic flow most large of all other streets androute acquired as Bus Terminal-Belt highway-University.
WORKS OF ROAD LOCATİON
WORKS OF ROAD LOCATİONSAME DİRECTİON WİTH TRAFFİCCENTER OF BELT HİGHWAY
At first step, the road designed centre of belt highway, but byreason of extantion of time and increasing of constructioncosts, Then it was decided to be at the sides.
WORKS OF ROAD LOCATİON
The line to be extended almost 5.5 km becouse there have no field enough for the atelier on firt line.
The tender of Emeksiz-Üniversite line was made on 2013 may. The BOZANKAYA A.S was in tender as only participant. They’ve win with 20 million Euro to the tender as an only company.
BELT HİGHWAY
TROLLEYBUS LİNE OF MALATYA
Başlangıç Tarihi (Date of starting): 21.06.2013
Bitiş Tarihi (Date of ending): 11.03.2015
TECNİCAL FEATURES OF TROLLEYBUS
•Trambus leigth 24.700 mm
•Totaly public transport capacity is 267
48 (sit), 219 (stand)
•%100 Low base
•Maximum speed 70 km/Saat
•Electrical and pneumatic brake
•Acceralation is 1,1 – 1,4 m/s2
•Maximum rake is %18
•The smallest turn diametr is 23,2 meter
• Line Voltage 750 V DC
• Power of engine 2x160 kW 320 kW
• 5 electrical door
• Air conditioner system, electrical heatingand colding
PROCESS OF CONSTRUCTİON : CATENARY
• 1576 Catenary pole
• 80.200 Meter catenary cable
There is totaly 6 type catenary pole
depending as capacity
4 Skissorpoint
MAŞTİ EmeksizMişmiş
ParkAraştırma Hastanesi
Kummler + Matter
PROCESS OF CONSTRUCTİON : STATİONS
39 piece35
Meter
2 piece30
Meter
13 piece25
meter
Totaly54
Station
PROCESS OF CONSTRUCTİON : STATİONS
There is a monitor systems for every stations and
controlling 24 hour of day.
PROCESS OF CONSTRUCTİON : TRANSFORMERS
Totally 9 transformer and 3 transformers has energy enter . TRM2 ve TRM6 Keban Dam supplied, TRM9 Kahramanmaraş suppliedtransformer. This transformers has compensation. Each transformers has ownsection .
TEST DRİVE OF TROLLEYBUS
• Vehicle’sacceralation
• Vehicle’slifting andstopping
• Traction
• Tests wascomplete of energy line.
Before thetest with
pessengerthe
trolleybussesbe on trial
withsandbags ;
TEST DRİVE OF TROLLEYBUS
• After the all tests;• Vehicles uses up coal often,• Fault of door system,• Be excluded of retarder,• Noise of engine.
• After the tests, started to the services on 30.03.2015
LİNE OF TROLLEYBUS OF MALATYA
Başlangıç Tarihi (Date of starting): 21.06.2013
Bitiş Tarihi (Date of ending): 11.03.2015
WORKİNG SYSTEM
Number of employee:
51
Workinghours:
06.00 23.00
Headway:
15 dk.
Track time:
90 dk.
Roundnumber:
80
Averagekm per
day:
2.900
Number of pessengerper day:
12.000
Number of pessenger
per km:
4,09
Energyconsumption :
2,9 kwh/km
Km başına Enerji
Maliyeti :
0,28 €
FUEL AND KM PER MONTH
Months Km Fuel cost(TL)
July 79.595,00 117.706,53
August 80.469,00 90.826,25
Total 160.064,00 208.532,78
• Cost of per km 1,3 TL in july and august• The lightings is included in this costs of
atelier and stations. Per km fuelconsumption cost’s is 0,95 TL(0,28 Euro) for vehicles.
NİSAN MAYIS HAZİRAN TEMMUZ AĞUSTOS AYLIK ORTALAMA
KM 78.373,70 90.800,90 85.489,00 79.595,00 80.469,00 82.945,52
YAKIT TÜKETİMİ(KWH) 226.983,80 242.735,20 265.941,00 225.477,00 236.362,00 239.499,807
8.3
73
,70
90
.80
0,9
0
85
.48
9,0
0
79
.59
5,0
0
80
.46
9,0
0
82
.94
5,5
2
22
6.9
83
,80
24
2.7
35
,20
26
5.9
41
,00
22
5.4
77
,00
23
6.3
62
,00
23
9.4
99
,80
0,00
50.000,00
100.000,00
150.000,00
200.000,00
250.000,00
300.000,00
Km Fuel consumption
Toplam 414.727 1.197.499
FUEL
2,55
2,6
2,65
2,7
2,75
2,8
2,85
2,9
2,95
Nisan Mayıs Haziran Temmuz Ağustos ORTALAMA
2,89
2,7
2,89
2,84
2,942,9
Fuel Consumption Of Per Km (Kwh)
2,9 × 0,3276 𝑇𝐿 = 0,95 𝑇𝐿 𝐹𝑢𝑒𝑙 𝑐𝑜𝑛𝑠𝑢𝑚𝑝𝑡𝑖𝑜𝑛 𝑜𝑓 𝑝𝑒𝑟 𝑘𝑚
𝐶𝑜𝑠𝑡 𝑜𝑓 𝑒𝑛𝑒𝑟𝑔𝑦 𝑐𝑜𝑛𝑠𝑢𝑚𝑝𝑡𝑖𝑜𝑛
NUMBER OF PESSENGER AS TO KİNDS
TOTALLY 1.741.028 Pessenger
Full18%
Reduced1%
Student65%
Unengaged9%
Ticket7%
Average pessenger per month438.302
NUMBER OF PESSENGER PER HOUR ON WEEKEND
05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 00:00
Hafta İçi Yüzde 0,32% 2,35% 6,67% 7,91% 7,40% 7,39% 7,24% 7,18% 7,50% 8,25% 8,07% 7,05% 5,73% 5,04% 4,02% 2,80% 2,57% 1,98% 0,49% 0,03%
0,00%
1,00%
2,00%
3,00%
4,00%
5,00%
6,00%
7,00%
8,00%
9,00%
Between 07:00 and 16:00 increasing to the intensity
NUMBER OF PESSENGERS
0
1
2
3
4
5
6
Nisan Mayıs Haziran Temmuz Ağustos ORTALAMA
5,244,81
3,513,15
3,744,09
Pesenger number per km
RATE OF BEİNG SERVİCES
Nisan Mayıs Haziran Temmuz Ağustos
Planlanan Sefer Sayısı 1.916 2.286 2.280 2.125 2.108
Gerçekleşen Sefer Sayısı 1.913 2.280 2.279 2.124 2.108
İptal Edilen Sefer Sayısı 3 6 1 1 0
1.9
16
2.2
86
2.2
80
2.1
25
2.1
08
1.9
13
2.2
80
2.2
79
2.1
24
2.1
08
3
6
1 1
0
1
2
3
4
5
6
7
1.700
1.800
1.900
2.000
2.100
2.200
2.300
2.400
%99,84
%99,73
%99,9
%99,9 %100
BEFORE THE SYSTEM AND AFTER
Hat No Hat Adı Araç SayısıPersonel Sayısı
Sefer Sayısı
Hat Uzunluğu
Günlük Km
Günlük Yakıt Tüketimi (LT)
Günlük Yakıt Tüketimi TL
Aylık Yakıt Tüketimi TL
AylıkPersonel Maliyeti
AYLIK TOPLAM MALİYET
YILLIK TOPLAM MALİYET
2B Şoför Okulu - Üniversite 6
48
44 44,68 1.966 924 3.604 TL 108.106 TL
101.913 TL 457.244 TL 5.486.922 TL
17A Şire Pazarı-Üniversite 12 124 23,72 2.941 1529 5.965 TL 178.947 TL
16A Şire Pazarı-Araştırma Hastanesi 2 27 22,43 606 315 1.228 TL 36.845 TL
16C Şire Pazarı-Araştırma Hastanesi-Cankoç 1 13 25,2 328 154 600 TL 18.015 TL
Toplam 21 208 116 5.840 3.037 11.844 TL 355.331 TL
Hat No Hat AdıAraç
SayısıPersonel Sayısı
Sefer Sayısı
Hat Uzunluğu
Günlük Km
Yakıt Tüketimi
(LT)
Günlük Yakıt
Tüketimi (Kw)
Yakıt Tüketimi
(TL)
Aylık Yakıt Tüketimi (TL)
Aylık Personel Maliyeti
AYLIK TOPLAM MALİYET
YILLIK TOPLAM MALİYET
T1 Trambus Hattı 9
41
80 37,5 3.000 8.700 2.784 TL 83.520 TL
87.354 TL 220.262 TL2.643.138
TL
16B Şire Pazarı-Araştırma Hastanesi-Üniversite 8 29 25,7 745 388 1.511 TL 45.344 TL
16C Cankoç - Araştırma Hastanesi 1 24 4,8 115 35 135 TL 4.043 TL
Toplam 18 133 68 3.861 422 8.700 4.430 TL 132.908 TL
Before trolleybus
With trolleybus
Trambüs Sisteminin devreye alınması ile birlikte 2 hat kaldırılmış, 2 hatta revize edilmiştir. Yapılan bu değişiklik yıllık 2.843.784 TL tasarruf sağlandığı görülmektedir.
PROBLEMS ENCOUNTERED
Parking on the road
Track distortion
Being low of operation speed
There is no turnstile in university
System faults
PROBLEMS ENCOUNTERED
The wires breaked along 2 km becouse an overloading truck crashed to the consoles.
FAİLURES
Drive system failures30%
Air conditioner system failures
22%Air system
6%
Door system failures29%
Blower system4%
Silecek Arızaları2%
Breaking system2%
Mechanical isolation3%
Mirrors2%
FAİLURE RATES
• Since the service starts, to be detected totally 1589 failures. İn these failures %27 procent is stoppingto the services.