The Process of Building Envelope Restoration
Wad
e E
ngi
ne
eri
ng
Ltd
.
A case study by Wade Engineering,
Oct 2015
The Process Flow • Reserve Fund Study (may or may not start the process)
• Service Proposal
• Initial site review of building concerns and history.
• Investigation approach and tasks to be performed, report format.
• Specification & tender.
• Inspection of work in progress, invoicing.
• Investigation (Technical Audit) and Report
• Site investigation to determine the type and extent of deterioration.
• Collect a statistically significant sample of likely areas of deterioration.
• Report supporting recommendations and estimated project cost.
• Specification, Tender, and Field Review
• Specification development based on report and Board direction.
• Tender to approved contractors
• Board and selected contractor sign CCDC 2 contract
• Wade Engineering reviews work in progress & approves invoices
Wad
e E
ngi
nee
rin
g Lt
d.
The Investigation
Wad
e E
ngi
nee
rin
g Lt
d.
Heritage Sherwood Park West, Built 1998, 61 units. Overview the Building, Identify Problem Areas, Allocate Data Collection
The Investigation
Wad
e E
ngi
nee
rin
g Lt
d.
The Usual Suspects
Checklists Help Investigators Collect The Necessary Data
The Investigation
Wad
e E
ngi
nee
rin
g Lt
d.
Good location for EMC (Equilibrium Moisture Content )
The Investigation
Wad
e E
ngi
nee
rin
g Lt
d.
The Investigation
Wad
e E
ngi
nee
rin
g Lt
d.
Invasive Tests Provide A Look
Behind The Surfaces
The Investigation
Wad
e E
ngi
nee
rin
g Lt
d.
The Investigation
Wad
e E
ngi
nee
rin
g Lt
d.
Loose Vent Ducts
Vapour Barrier What’s Hiding in the Attic?
The Report
Wad
e E
ngi
nee
rin
g Lt
d.
Report includes data, photos, observations, summary and recommendations: Recommendations and Opinion of Cost The following scope of work outlines the recommended repairs to the entire building envelope. In the event that the restoration work needs to be phased over time, ……………………….. Scope of Work: • Remove stucco and deck railings and membranes. • Remove and re-install windows with proper weather barrier. • Re-install deck membranes with proper detailing, slope, and blocking for
railings • Before stucco replacement apply wood preservative to a height of 12” to the
base of ground level columns. • Re-install stucco with window band details to allow future replacement of
windows. • Re-install railings with proper length bolts Opinion of Costs………………………………….. $1,750,000.00 to $2,000,000.00
Then comes the five stages of Grief: Denial, Anger, Bargaining, Depression, Acceptance
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Facing Reality: Board - Manage Expectations of Unit Owners Contractor - Manage Schedule & Cost Wade - Review work, Mediate the Differences
DEMOLITION
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Careful Stucco Demolition Avoids Saw Cut Damage to Sheathing……
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Balcony Structural Damage
Building Envelope Restoration • So How Did the Investigation Results Compare to Actual?
• As expected the West and North elevations had a large percentage of the deterioration.
• Investigation points were plotted on the Contractor’s drawing of where materials were used. (An excellent record!)
• Of 26 moisture readings over 14% on the West and North elevations:
• 6 had no significant deterioration in the surrounding area.
• 20 had anywhere from deteriorated OSB up to complete failure of the OSB and framing behind.
• Our investigation assessment of overall damage used for cost estimating was good overall, this time…………………..
Wad
e E
ngi
nee
rin
g Lt
d.
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Balcony Slope Verification
Restoration
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Balcony Rebuild
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Window Flashing Mock-up
EFIS Installation
Scaffolding Progressive Assembly
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Siding Follows the Other
Trades Around the Building.
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Finally Railings and A/C Units Return – and Then The Trouble Starts…..
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Final Inspection and Resolution of Deficiencies Before The Scaffolding Comes Down South and West Side……
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
While Work Continues on the East Side.
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
The Finished Product.
Building Envelope Restoration
Wad
e E
ngi
nee
rin
g Lt
d.
Questions?
Final Cost $1.6M < Estimated $1.7-2.0M 44,580 sq. ft. of siding
Completed 5 weeks ahead of schedule Some residents are still complaining about AC units….