Taylor Construction Group Pty Ltd ABN 25 067 428 344
Level 13, 157 Walker St, North Sydney NSW 2060 T 02 8736 9000 F 02 8736 9090 taylorau.com.au
12 March 2021 The Principal’s Authorised Person Mace Australia Pty Ltd Suite 1703, Level 17, 44 Market Street Sydney, NSW 2000 Attention: Mr Carl Alderson Project: Picton High School Redevelopment – 480 Argyle Street, Picton, NSW 2571 Re: Statement relating to SSDA conditions C18, C19 and C20 Taylor has been engaged to complete the redevelopment of Picton High School Project which has been approved under SSD 8640 dated 20th December 2018. This correspondence has been prepared to support a request for modification (SSD 8640 MOD 2), specifically in relation to pre and post construction dilapidation reporting in the vicinity of adjoining residential properties. The following Conditions of consent relate to vibration criteria: Vibration Criteria C18. Vibration caused by construction at any residence or structure outside the site must be limited to:
(a) for structural damage, the latest version of DIN 4150-3 (1992-02) Structural vibration - Effects of vibration on structures (German Institute for Standardisation, 1999); and
(b) for human exposure, the acceptable vibration values set out in the Environmental Noise Management Assessing Vibration: a technical guideline (DEC, 2006) (as may be updated or replaced from time to time).
C19. Vibratory compactors must not be used closer than 30 metres from residential buildings unless vibration monitoring confirms compliance with the vibration criteria specified in condition C18. C20. The limits in conditions C18 and C19 apply unless otherwise outlined in a Construction Noise and Vibration Management Plan, approved as part of the CEMP required by condition B18 of this consent GHD prepared an acoustic report (Report #2127011 dated April 2018) for the Picton High School project which was approved as part of the original SSD and addressed both noise and vibration impacts of the development and construction works. In relation to the findings of the GHD assessment and the Conditions of consent, Taylor notes the following:
• Based on Table 3-6 of GHD report, Construction Damage may only occur if Peak Particle velocity is 15mm/s (higher magnitude may also be acceptable at higher frequencies)
• Based on Table 4-4 Vibration generated by several equipment listed ranges between 2.5 to 7 at 8m~10m distance
• According to table 4-5 of the GHD assessment, these values reduce significantly once distance exceeds 30m
• Project Surroundings: o Western Boundary along Argyle Street – no residential buildings within 30m from major
works o Southern Boundary – Shared with Temporary school and no residential buildings within
30m from works
o Eastern Boundary – Shared with Temporary school and no residential buildings within 30m from works
o Northern Boundary – Residential buildings and structures along boundary which vary in distance between 4m and approximately 20m
Having regard to the above, Taylor hereby confirms the following:
• Taylor has have not used (and does not intend to use) any vibrating compactors within the 30m distance stated in condition C19.
• Prior to commencement of works (limited to civil works, construction of at-grade car park and access) along the northern boundary, Taylor intend to obtain pre-construction dilapidation reports to capture existing condition of all residential buildings and structures
o 468 Argyle Street o 27 Coachwood Crescent o 29 Coachwood Crescent o 31 Coachwood Crescent o 33 Coachwood Crescent o 35 Coachwood Crescent o 37 Coachwood Crescent o 39 Coachwood Crescent
• During the abovementioned works, Taylor propose to install vibration monitors to closest residential buildings and structures which includes 468 Argyle Street and 27 Coachwood Crescent The Monitors will establish benchmark records for vibration impact on these buildings and is intended to confirm the values presented in GHD report.
After completion of the works, Taylor will conduct a Post Construction dilapidation in accordance with condition D5 of the Development Consent Kind regards Hazem Gergis Project Manager
218.0
8
DP
YPL
TEMPORARY SCHOOL SITE
COVERED WALKWAY
COVERED WALKWAY
AR
GY
LE
ST
RE
ET
ROAD / CARPARK
BUS DROP OFF
STAFF CARPARK
BUILDING B
BUILDING D
COURT
WO
NG
A R
OA
D
AGRICULTURE ZONE
SOUTHERN COURTYARD
BUILDING C
STORMWATER DETENTION
COURT
DEMOUNTABLES TO BE RELOCATED DURING EARLY WORKS
REFER TO EARLY WORKS PACKAGE
TEMPORARY SCHOOL HOARDING
BUILDING F
BUILDING H
BUILDING I BUILDING J
SITE BOUNDARY 283.77
68° 41'
SIT
E B
OU
ND
AR
Y
82
.16
32
2° 4
8' 3
5"
SITE BOUNDARY265.14
248° 41' 15"
SIT
E B
OU
ND
AR
Y20
1.1
715
8° 4
1' 15
"SIT
E B
OU
ND
AR
Y
70.6
43
33
° 2
7'
SIT
E B
OU
ND
AR
Y
46
.89
333
° 2
7'
14.415 63° 27'
3.7
75
34
0° 4
3'
EXISTING TREES
EXISTING MAIN BUILDINGS
LEGEND
EXISTING WALKWAYS
N
CLIENT
PROJECT
DESCRIPTION
Project No
Drawing No
Scale Date
Billard Leece Partnership Pty Ltd
Architects & Urban Planners
www.blp.com.au
0
1:500
5 10 15 20 25
Revision
Drawn By Checked By
Level 6, 72-80 Cooper StreetSurry Hills 2010NSW AustraliaT +61 2 8096 4066
1 : 500@A1
25/0
3/2
019 5
:17:5
5 P
M
1
SITE PLAN - EXISTING
17003
PICTON HIGHSCHOOL
DEPARTMENT OFEDUCATION
18/03/19
AA01-0001
KT JL
REV
1 ISSUE FORCONSTRUCTION
25/03/19
ZONE OF INFLUENCE BASED ON 30M FROM EXISTINGSTRUCTURES
VM
VM
VMVIBRATIONMONITORING
30M ZONE OFINFLUENCE
DN
DN
UP
UP
UP
UP
UP
UP
UP
UP
UP
UPUP
UP
UP
UP
UP
UP
UP
UP UP
UP
FN-102
GZ-0002
FN-101
GZ-0001
FN-102
GZ-0005FN-201
GZ-0004
FN-101
GZ-0018
FN-102
GZ-0019
FN-101
GZ-0020
FN-101
GZ-0014
FN-101
GZ-0003
FN-103
GZ-0006 FN-103
GZ-0008 FN-101
GZ-0036
FN-101
GZ-0027
FN-101
GZ-0028
FN-103
GZ-0029
FN-103
GZ-0043
FN-101
GZ-0047
FN-104
GZ-0007
FN-102
GZ-0056
FN-102
GZ-0049
FN-102
GZ-0057
FN-102
GZ-0046
T1 T2 T3
TA
TC
TB
T5T7
T4T6
TD
TE
EXISTING COVERED WALKWAY
NEW COVERED W
ALKWAY
HYDRANT/PUMP ROOM
NEW COVERED WALKWAY
AR
GY
LE
ST
RE
ET
VISITOR PARKING
BUS DROP OFF
ZONE
STAFF CARPARK
BUILDING B
BUILDING ABUILDING E
BUILDING F
MULTI-PURPOSE HALL
EXISTING PLAYING COURT
EXISTING COURT
BUILDING IBUILDING J
WO
NG
A R
OA
D
AGRICULTURE ZONE
SOUTHERN COURTYARD
BUILDING G
NORTHERN COURTYARD
ASSEMBLY AREA
PUBLIC FORECOURT
DELIVERY
LECTURE
NA
TU
RE
WA
LK
BOOSTER
PLANT
STAFF CARPARK
NEW COVERED WALKWAY
ENTRY ONLY
EXIT ONLY
ENTRY ONLY
INFORMAL PARKING
NEW SUBSTATIONEASEMENT
BUILDING H
BUILDING D
BUILDING
C
FN-101 METAL PALISADE FENCE/GATES
FN-102 METAL SAFETY BARRIER FENCE
FN-103 ALUMINIUM SLATTED FRAME FENCE/GATES
FN-104 CORROMESH METAL MESH FENCE
FN-105 PADDOCK FENCE/GATES
FN-201 METAL MESH AUTO SLIDING GATES
EXISTING FENCE, FENCE TYPE VARIES
LOCATION OF TEMPORARY SCHOOL
HOARDING
NOTE: ALL GATES TO BE FITTED WITH CLOSERS.
REFER TO ELECTRICAL DRAWINGS FOR THE
EXTENT OF ELECTRIC SECURITY GATES.
REFER TO LANDSCAPE AND CIVIL DRAWINGS
FOR THE EXTENT OF THE EXTERNAL WORKS.
NOT PART OF THE SCOPE OF MILESTONE 2
FENCES LEGEND:
FN-201
SGN-115ALOCATION OF SIGNAGE
TANKS
FN-101
EXIT
ACC. ACC.
EX SUB STATION
NEW COVERED WALKWAY
FN-107 ON LG AND GR LEVELS. GATES ON LG.
SITE BOUNDARY
SIT
E B
OU
ND
AR
Y
SITE BOUNDARY
SIT
E B
OU
ND
AR
Y
FN-104 - ON LOWER GROUND FLOOR
FN-104
FN-108
GZ-0025
TEMPORARY SCHOOL SITE
NOT PART OF
THE SCOPE OF
MILESTONE 2
NOT PART OF THE
SCOPE OF MILESTONE 2
PLA
NT
PORTION OF TEMPORARY SCHOOL HOARDING TO BE REALIGNED TO ENABLE SERVICES WORKS TO ACTIVATE MILESTONE 2
PORTION OF TEMPORARY SCHOOL HOARDING TO BE REALIGNED TO ENABLE SERVICES WORKS TO ACTIVATE MILESTONE 2
ACC.
ACC.
FN-108
GZ-0026
FN-108
GZ-0025
EXISTING COVERED WALKWAY
NEW COVERED W
ALKWAY
HYDRANT/PUMP ROOM
NEW COVERED WALKWAY
VISITOR PARKING
BUS DROP OFF
ZONE
STAFF CARPARK
MULTI-PURPOSE HALL
EXISTING COURT
AGRICULTURE ZONE
SOUTHERN COURTYARD
NORTHERN COURTYARD
ASSEMBLY AREA
PUBLIC FORECOURT
DELIVERY
LECTURE
NA
TU
RE
WA
LK
STORMWATER DETENTION
STAFF CARPARK
NEW BOUNDARY RE-ALIGNMENT
ENTRY ONLY
INFORMAL PARKING
FN-201
FN
-10
1
SGN-115A
TANKS
BINSENCLOSURE
EX SUB STATION
NEW COVERED WALKWAY
SITE BOUNDARY
SIT
E B
OU
ND
AR
Y
SITE BOUNDARY
SIT
E B
OU
ND
AR
Y
FN-104
100 m
10
0m
SE
TB
AC
K F
RO
M B
OU
ND
AR
Y L
INE
THE CONSTRUCTION OF BUILDING E AND K SHALL
COMPLY WITH AS3959 INCLUDING ALL SERVICES
LOCATED WITHIN THIS BAL12.5 COMPLIANT ZONE
3 X MOTORBIKE PARKING
FN-104
FN-107
GZ-0045
FN-107
GZ-0044
PLANT
PLANTPLA
NT
FN-102
GZ-0060
FN-102
GZ-0061
N
CLIENT
PROJECT
DESCRIPTION
Project No
Drawing No
Scale Date
Billard Leece Partnership Pty Ltd
Architects & Urban Planners
www.blp.com.au
0
1:500
5 10 15 20 25
Revision
Drawn By Checked By
Level 6, 72-80 Cooper StreetSurry Hills 2010NSW AustraliaT +61 2 8096 4066
1 : 500@A1
21/0
9/2
020 9
:32:4
1 A
M
5
SITE PLAN -PROPOSEDMILESTONE 2
17003
PICTON HIGHSCHOOL
DEPARTMENT OFEDUCATION
02/07/2020
AA03-0001
Construction
AD, PR JL
REV
AA For Coordination 10/09/18
AB For Coordination 27/02/19
1 Issued For Construction 25/03/19
2 Issued For Construction 08/05/19
3 For Construction 31/01/20
4 For Construction 16/04/20
5 For Construction 21/09/20
ZONE OF INFLUENCE BASED ON 30M FROM EXISTINGSTRUCTURES
(OVERLAID ON SITE PLAN)
VMVIBRATIONMONITORING
30M ZONE OFINFLUENCE