Project The PERNG MHA MGAN BOX Group 5 in 1

Transcript of The perng mha ngan box (2)

Project The PERNG MHA MGAN BOXGroup 5 in 1

The PERNG MHA NGAN Box Model

Table and Recording

Time spent for manufacturing processes.

Planing 5 Minutes Cutting 20 Minutes Drilling 5 Minutes Polishing 20 Minutes Joining 10 Minutes

Total 60 Minutes