The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for...
Transcript of The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for...
![Page 1: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/1.jpg)
1hT1hT
August 3, 2000
The One The One HectareTelescopeHectareTelescope
Progress Report forProgress Report for
SKA Workshop atSKA Workshop at
JodrellJodrell Bank BankJohn DreherProject ScientistActing Project Manager
![Page 2: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/2.jpg)
1hT1hT
August 3, 2000
The One The One HectareTelescopeHectareTelescope
Progress Report forProgress Report for
SKA Workshop atSKA Workshop at
JodrellJodrell Bank BankJohn DreherProject ScientistActing Project Manager
The Allen Telescope ArrayThe Allen Telescope Array
![Page 3: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/3.jpg)
The Allen Telescope Array (ATA)The Allen Telescope Array (ATA)
![Page 4: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/4.jpg)
The Allen Telescope Array (ATA)The Allen Telescope Array (ATA)
• Large, massively parallel array of “TV” dishes– 500 elements each 5 m in diameter
– total collecting area larger than 100 m dish
– 0.5 - 11 GHz simultaneously
– multiple beams
![Page 5: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/5.jpg)
The Allen Telescope Array (ATA)The Allen Telescope Array (ATA)
• Large, massively parallel array of “TV” dishes– 500 elements each 5 m in diameter
– total collecting area larger than 100 m dish
– 0.5 - 11 GHz simultaneously
– multiple beams
• Must be much cheaper than existing arrays
![Page 6: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/6.jpg)
The Allen Telescope Array (ATA)The Allen Telescope Array (ATA)
• Large, massively parallel array of “TV” dishes– 500 elements each 5 m in diameter
– total collecting area larger than 100 m dish
– 0.5 - 11 GHz simultaneously
– multiple beams
• Must be much cheaper than existing arrays
• Joint project of SETI Institute and UC Berkeley
![Page 7: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/7.jpg)
The Allen Telescope Array (ATA)The Allen Telescope Array (ATA)
• Large, massively parallel array of “TV” dishes– 500 elements each 5 m in diameter
– total collecting area larger than 100 m dish
– 0.5 - 11 GHz simultaneously
– multiple beams
• Must be much cheaper than existing arrays
• Joint project of SETI Institute and UC Berkeley
• 26+ M$ from Allen, Myhrvold, others
![Page 8: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/8.jpg)
The ATA at Hat CreekThe ATA at Hat Creek
![Page 9: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/9.jpg)
MountsMounts
3.6 m Orbitron
4.2 m AndersenXY drive
worm gear az-el
5 m Prototype
Dual Linear Actuators
belt drive az-el
![Page 10: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/10.jpg)
MountsMounts
3.6 m Orbitron
4.2 m AndersenXY drive
worm gear az-el
5 m Prototype
Dual Linear Actuators
belt drive az-el
undergoing torque tests
![Page 11: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/11.jpg)
UltrawidebandUltrawideband Log Periodic Feed Log Periodic Feed
15cm
45 cm
Dual polarization
Cryogenicfront endinside shieldFed at and radiates toward tip
![Page 12: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/12.jpg)
Prototype Feed for TestsPrototype Feed for Tests
![Page 13: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/13.jpg)
Preliminary Feed TestsPreliminary Feed Tests
•Excellent (20 dB) match
•Agrees with EM calcs on
Impedance
Gain
Internal Loss
•More tests ongoing
![Page 14: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/14.jpg)
Optical Design in progressOptical Design in progress• Prime focus with spillover control skirt
• 6 m symmetric shaped Cassegrain
• 5 m offset Gregorian
![Page 15: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/15.jpg)
![Page 16: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/16.jpg)
![Page 17: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/17.jpg)
PrototypePrototype InP InP MMIC LNA MMIC LNAMMIC
In-P PHEMT0.18 microns
Weinrebmodel Tsys ~ 10 K
![Page 18: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/18.jpg)
PrototypePrototype InP InP MMIC LNA MMIC LNAMMIC
In-P PHEMT0.18 microns
WeinrebModel Tin ~ 10 KFirst try
works fineTin ~ 20 K
![Page 19: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/19.jpg)
PrototypePrototype InP InP MMIC LNA MMIC LNAMMIC
In-P PHEMT0.18 microns
WeinrebModel Tsys ~ 10 KFirst try
works fineTsys ~ 20 K
Bias: 1.46V, 0V, 14mA @ 15K; 1.46V, 0.6V, 25mA @ 82KInput tuned for 6 GHz. DSN lab data Nov 30, 1999 corrected
0
5
10
15
20
25
30
1 2 3 4 5 6 7 8 9 10 11 12
Frequency, GHz
AT 82K
AT 15K
AT 20K
![Page 20: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/20.jpg)
PrototypePrototype InP InP MMIC LNA MMIC LNAMMIC
In-P PHEMT0.18 microns
WeinrebModel Tsys ~ 10 KFirst try
works fineTsys ~ 20 K
Bias: 1.46V, 0V, 14mA @ 15K; 1.46V, 0.6V, 25mA @ 82KInput tuned for 6 GHz. DSN lab data Nov 30, 1999 corrected
0
5
10
15
20
25
30
1 2 3 4 5 6 7 8 9 10 11 12
Frequency, GHz
AT 82K
AT 15K
AT 20K
Third revision (with active balun) in fabrication
![Page 21: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/21.jpg)
80 K Cryogenics80 K Cryogenics• Must be
– Small (to fit inside shield)
– Reliable (> 10 yr MTBF)
– Cheap (< few K$)
• In-house solution– “vacuum tube” style dewar with getter
– Pulse tube cooler (no moving parts)
– Clearance seal compressor with voice coil motor
• Commercial solution also possible
![Page 22: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/22.jpg)
0.5-11 0.5-11 GHzGHz Analog F/O Links Analog F/O Links• Off the shelf units too expensive now
• Reduced component costs soon due torecent massive investments by industry
• Laser progress “Real Soon Now”– Cheaper DFB, e.g. Ortel “Daytona”
– 1300 nm VCSEL (Gore, Novalux, Cielo,Agilent, Infineon)
– Cheaper solid-state lasers?
• External modulators with common laser?
![Page 23: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/23.jpg)
Signal ProcessingSignal Processing• Up/down converter
– PsHEMT GaAs MMIC(s)
– Development at NFRA
– 1st mixer block in fab
• DSP architecture TBD– Beamfomers (>3 beams)
– Digital delay and IF
• Cross correlator with BW set by cost
• RFI mitigation and removal designed in
![Page 24: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/24.jpg)
Rapid Prototyping ArrayRapid Prototyping Array
![Page 25: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/25.jpg)
RPA pictureRPA picture
![Page 26: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/26.jpg)
Timeline for ATATimeline for ATA
• R&D Phase
• Rapid Prototype Array of 7 antennas built– calibration, beam forming, RFI excision, telescope control
• Selected site, began approval processes
• PDRs : most done by year’s end
• Design staffing nearly complete
1999-20001999-2000
![Page 27: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/27.jpg)
Timeline for ATATimeline for ATA
• R&D Phase
• Rapid Prototype Array of 7 antennas built– calibration, beam forming, RFI excision, telescope control
• Selected site, began approval processes
• PDRs : most done by year’s end
• Design staffing nearly complete
1999-20001999-2000
Wanted: DSP Wizard!
![Page 28: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/28.jpg)
Timeline for ATATimeline for ATA
• CDR
• Build Production Test Array
• Operational tests begin
• Develop tools
2001-20022001-2002
![Page 29: The One HectareTelescope - Jodrell Bank Observatory · The One HectareTelescope Progress Report for SKA Workshop at Jodrell Bank John Dreher Project Scientist ... • Prime focus](https://reader034.fdocuments.net/reader034/viewer/2022042206/5ea7fa48b629294b20179613/html5/thumbnails/29.jpg)
Timeline for ATATimeline for ATA
• Begin construction
• First use of partial array
• Array complete - extensions begin
• Feed into SKA technology decision point
2003-20042003-2004
20052005