THE MARGINAL - UC Berkeley College of Environmental...
Transcript of THE MARGINAL - UC Berkeley College of Environmental...
THE MARGINAL
KASEY ELLIOTT2015-2016
ADVISORS:ANDREW ATWOODANDREW SHANKEN
THE MARGIN & THE MARGINAL
MARGIN: the edge, the border, the line that distinguishes the center from the periphery.
The margin is at the edge. It structures space, activities, and the people who participate. In design, the site, the materials, and the program are all im-portant elements of architecture, but where does architecture end? Does it end at the margin? Who and what decide where the margin lies? What about the spaces between the margins? Who is held responsible for the remnants?
MARGINAL: situated at the edge, the periphery.
This thesis explores the beauty of marginal space in the urban environment. Mar-ginal space is on the edge of architecture, between program, without certain-ty, indifferent to the preoccupied urban mind. Without us realizing, our expe-rience is shaped by it. It can be both hidden and revealed, and often wavers in between. It ’s constantly on the verge of change, overlapping narratives, and pre-senting moments of ambiguous function and questionable beauty. This state of obscurity provokes shifting narratives of spatial appropriation and incites curi-osity of ownership and authorship as it questions the limitations of institutions.
3
3
THE MARGINAL & APPROPRIATION
The marginal space that accounts for what I call breathing room, accounts for pub-lic and private land that sits in between properties where the sense of ownership is lost, and in some cases causes the space to be under-utilized all together. However, in urban environments these spaces may take on different uses depending on need. The beauty lies in its ability to constantly transform and take on the most appropri-ate shape for the situation. In looking at spatial appropriation as it occured in public and private spaces, some cases allow for appropriation that caters to adjacent pro-grams, as an extension of the margin, while others were programmatically distant.
In my experience walking through my neighborhood, the marginal space I chose as my site exposed itself in the form of an open and visible space near the Ash-by Avenue and Sacramento Street intersection in South Berkeley, loosely for-malized by the boundaries of the public sidewalk and abandoned architecture.
The site is not just a marginal space. It onced serviced cars for the liquor store that occu-pied the building over 50 years ago, it ’s been fenced on all sides, which served as an in-vitation for illegal dumping, and it’s currently the home of an unknown memorial, and by default been subject to neglect. The multi-threaded narratives embedded in the space are ones of abandonment, impudence and disregard, to reclamation and remembrance.
GHOSTS
2’
SITE PLAN
9
7
THE MARGINAL SPACE
I viewed this as a site to experiment with improvisation and appropria-tion to bring the marginal space to life. To do this, I was driven by the site’s lay-ered pasts to design an installation that overlaps these narratives by defining the space with objects disregarded from the surrounding neighborhood. By painting and tethering the objects, they are established, and establish the space in a new light with this ambiguous narrative that may read art, or it may read yard sale.
13
THE MARGINAL MOVEMENT
Regardless of the interpretation, the project engages in a collaboration with urban partici-pants that never reaches a state of completion. As the installation itself changes as people regard and disregard it, move, and remove elements of the margin that define the space.
As people moved and removed objects, the string tethering them to the building en-couraged a range of motion and provided a trace of the objects original position.
The objects were painted red to play on two things: the history of the site, which was a part of a community that was subject to redlining, restricting the mobility of blacks to other neighborhoods. And as a graphic color of change in architectural representation.
15
17
19
1’RANGE OF MOTION
1’RANGE OF MOTION
1’RANGE OF MOTION
1’RANGE OF MOTION
21
THE MARGINAL OBJECTS
Each of the objects used for the installation were found on or around the mar-ginal space. Throughout the duration of the project, I documented the location of each found object, including the day and time, and well as drew and measured them. These drawings attempt to tell the story of the objects in relation to the proj-ect regarding their orgin, their role in the project, and the eventual disposal. The condition of the objects ranged from useful to completely unrecognizable. During the installation, the objects remained in whatever state I intially found them in.
23
1’RANGE OF MOTION
MARGINAL SPACE
MARGINAL OBJECTS
UC BERKELEY
1000’
BERKELEY TRANSFER STATION
25
REAR ELEVATION SIDE ELEVATION SIDE ELEVATION TOP ELEVATION
05
TOP ELEVATION
SIDE ELEVATION
BADMINTON RACKET
Found: 02/06/2016 1:30PM1010 Arlington Avenue Oakland, California
26.75”
01
SIDE ELEVATION FRONT ELEVATION
SIDE TABLE
Found: 01/30/2016 2:15PM923 Arlington Avenue Oakland, California
14.87”
15.5”
15.5”
1” = 0’-6”
1” = 0’-6” 1” = 0’-6”
1” = 0’-6”
02
TOP ELEVATION
SIDE ELEVATION
FRYING PAN
Found: 01/31/2016 5:25PM5315 L owell Street Oakland, California
8”
13.75”
06
TOP ELEVATIONFRONT ELEVATION
SPEAKER
Found: 02/06/2016 2:45PM1006 53rd Street Oakland, California
13.75”
13.75”
07
SIDE ELEVATIONFRONT ELEVATION
FILE CABINET
Found: 02/06/2016 2:45PM1006 53rd Street Oakland, California
08
TOP ELEVATION
FRONT ELEVATION
STORAGE DRUM
Found: 02/08/2016 7:05PM2410 Carleton Street Berkeley, California
21.5”
14”
12”
1” = 0’-6” 1” = 0’-6”
1” = 0’-6”1” = 0’-6”
27
REAR ELEVATION SIDE ELEVATION SIDE ELEVATION TOP ELEVATION
05
TOP ELEVATION
SIDE ELEVATION
BADMINTON RACKET
Found: 02/06/2016 1:30PM1010 Arlington Avenue Oakland, California
26.75”
01
SIDE ELEVATION FRONT ELEVATION
SIDE TABLE
Found: 01/30/2016 2:15PM923 Arlington Avenue Oakland, California
14.87”
15.5”
15.5”
1” = 0’-6”
1” = 0’-6” 1” = 0’-6”
1” = 0’-6”
REAR ELEVATION SIDE ELEVATION SIDE ELEVATION TOP ELEVATION
05
TOP ELEVATION
SIDE ELEVATION
BADMINTON RACKET
Found: 02/06/2016 1:30PM1010 Arlington Avenue Oakland, California
26.75”
01
SIDE ELEVATION FRONT ELEVATION
SIDE TABLE
Found: 01/30/2016 2:15PM923 Arlington Avenue Oakland, California
14.87”
15.5”
15.5”
1” = 0’-6”
1” = 0’-6” 1” = 0’-6”
1” = 0’-6”
29
REAR ELEVATION SIDE ELEVATION SIDE ELEVATION TOP ELEVATION
05
TOP ELEVATION
SIDE ELEVATION
BADMINTON RACKET
Found: 02/06/2016 1:30PM1010 Arlington Avenue Oakland, California
26.75”
01
SIDE ELEVATION FRONT ELEVATION
SIDE TABLE
Found: 01/30/2016 2:15PM923 Arlington Avenue Oakland, California
14.87”
15.5”
15.5”
1” = 0’-6”
1” = 0’-6” 1” = 0’-6”
1” = 0’-6”
31
02
TOP ELEVATION
SIDE ELEVATION
FRYING PAN
Found: 01/31/2016 5:25PM5315 L owell Street Oakland, California
8”
13.75”
06
TOP ELEVATIONFRONT ELEVATION
SPEAKER
Found: 02/06/2016 2:45PM1006 53rd Street Oakland, California
13.75”
13.75”
07
SIDE ELEVATIONFRONT ELEVATION
FILE CABINET
Found: 02/06/2016 2:45PM1006 53rd Street Oakland, California
08
TOP ELEVATION
FRONT ELEVATION
STORAGE DRUM
Found: 02/08/2016 7:05PM2410 Carleton Street Berkeley, California
21.5”
14”
12”
1” = 0’-6” 1” = 0’-6”
1” = 0’-6”1” = 0’-6”
33
02
TOP ELEVATION
SIDE ELEVATION
FRYING PAN
Found: 01/31/2016 5:25PM5315 L owell Street Oakland, California
8”
13.75”
06
TOP ELEVATIONFRONT ELEVATION
SPEAKER
Found: 02/06/2016 2:45PM1006 53rd Street Oakland, California
13.75”
13.75”
07
SIDE ELEVATIONFRONT ELEVATION
FILE CABINET
Found: 02/06/2016 2:45PM1006 53rd Street Oakland, California
08
TOP ELEVATION
FRONT ELEVATION
STORAGE DRUM
Found: 02/08/2016 7:05PM2410 Carleton Street Berkeley, California
21.5”
14”
12”
1” = 0’-6” 1” = 0’-6”
1” = 0’-6”1” = 0’-6”
35
02
TOP ELEVATION
SIDE ELEVATION
FRYING PAN
Found: 01/31/2016 5:25PM5315 L owell Street Oakland, California
8”
13.75”
06
TOP ELEVATIONFRONT ELEVATION
SPEAKER
Found: 02/06/2016 2:45PM1006 53rd Street Oakland, California
13.75”
13.75”
07
SIDE ELEVATIONFRONT ELEVATION
FILE CABINET
Found: 02/06/2016 2:45PM1006 53rd Street Oakland, California
08
TOP ELEVATION
FRONT ELEVATION
STORAGE DRUM
Found: 02/08/2016 7:05PM2410 Carleton Street Berkeley, California
21.5”
14”
12”
1” = 0’-6” 1” = 0’-6”
1” = 0’-6”1” = 0’-6”
37
09
SIDE ELEVATION FRONT ELEVATION
DOOR KNOB
Found: 02/08/2016 7:30PM3019 Shattuck Avenue Berkeley, California
2”
2.55”
10
TOP ELEVATION
FRONT ELEVATION
DRAWER
Found: 02/11/2016 10:30PM2141 Oregon Street Berkeley, California
1” = 0’-6”
2.5”
15”
18.47”0.75”
11
TOP ELEVATION
FRONT ELEVATION
ALARM CLOCK
Found: 02/11/2016 10:30AM2141 Oregon Street Berkeley, California
FM
AM
AM
PM
8.8”
9.5”
12
SIDE ELEVATIONFRONT ELEVATION
SINK SPRAYER
Found: 02/11/2016 11:00AM3026 Dohr Street Berkeley, California
0.3”
1” = 0’-6”
1” = 0’-6”
1” = 0’-6”
09
SIDE ELEVATION FRONT ELEVATION
DOOR KNOB
Found: 02/08/2016 7:30PM3019 Shattuck Avenue Berkeley, California
2”
2.55”
10
TOP ELEVATION
FRONT ELEVATION
DRAWER
Found: 02/11/2016 10:30PM2141 Oregon Street Berkeley, California
1” = 0’-6”
2.5”
15”
18.47”0.75”
11
TOP ELEVATION
FRONT ELEVATION
ALARM CLOCK
Found: 02/11/2016 10:30AM2141 Oregon Street Berkeley, California
FM
AM
AM
PM
8.8”
9.5”
12
SIDE ELEVATIONFRONT ELEVATION
SINK SPRAYER
Found: 02/11/2016 11:00AM3026 Dohr Street Berkeley, California
0.3”
1” = 0’-6”
1” = 0’-6”
1” = 0’-6”
39
09
SIDE ELEVATION FRONT ELEVATION
DOOR KNOB
Found: 02/08/2016 7:30PM3019 Shattuck Avenue Berkeley, California
2”
2.55”
10
TOP ELEVATION
FRONT ELEVATION
DRAWER
Found: 02/11/2016 10:30PM2141 Oregon Street Berkeley, California
1” = 0’-6”
2.5”
15”
18.47”0.75”
11
TOP ELEVATION
FRONT ELEVATION
ALARM CLOCK
Found: 02/11/2016 10:30AM2141 Oregon Street Berkeley, California
FM
AM
AM
PM
8.8”
9.5”
12
SIDE ELEVATIONFRONT ELEVATION
SINK SPRAYER
Found: 02/11/2016 11:00AM3026 Dohr Street Berkeley, California
0.3”
1” = 0’-6”
1” = 0’-6”
1” = 0’-6”
09
SIDE ELEVATION FRONT ELEVATION
DOOR KNOB
Found: 02/08/2016 7:30PM3019 Shattuck Avenue Berkeley, California
2”
2.55”
10
TOP ELEVATION
FRONT ELEVATION
DRAWER
Found: 02/11/2016 10:30PM2141 Oregon Street Berkeley, California
1” = 0’-6”
2.5”
15”
18.47”0.75”
11
TOP ELEVATION
FRONT ELEVATION
ALARM CLOCK
Found: 02/11/2016 10:30AM2141 Oregon Street Berkeley, California
FM
AM
AM
PM
8.8”
9.5”
12
SIDE ELEVATIONFRONT ELEVATION
SINK SPRAYER
Found: 02/11/2016 11:00AM3026 Dohr Street Berkeley, California
0.3”
1” = 0’-6”
1” = 0’-6”
1” = 0’-6”
13
TOP ELEVATION SIDE ELEVATION
STORAGE SHELF
Found: 02/13/2016 1:40PM3220 Baker Street Berkeley, California
12.3”
8.7”
12.3”
14
TOP ELEVATION
FRONT ELEVATION
WOOD BLINDS
Found: 02/13/2016 2:30PM1101 62nd Street Oakland, California
30.5”
15
FRONT ELEVATION
TELEVISION SET
Found: 02/18/2016 3:40PM1650 Tyler Street Berkeley, California
37.5”
26.5”
18.1”
16
TOP ELEVATION
SIDE ELEVATION
TABLE FRAME
Found: 02/19/2016 7:30PM2343 California Street Berkeley, California
41.25”
1.5”
35.4”
1” = 0’-6”
1” = 0’-6” 1” = 0’-6”
1” = 1’-0”
13
TOP ELEVATION SIDE ELEVATION
STORAGE SHELF
Found: 02/13/2016 1:40PM3220 Baker Street Berkeley, California
12.3”
8.7”
12.3”
14
TOP ELEVATION
FRONT ELEVATION
WOOD BLINDS
Found: 02/13/2016 2:30PM1101 62nd Street Oakland, California
30.5”
15
FRONT ELEVATION
TELEVISION SET
Found: 02/18/2016 3:40PM1650 Tyler Street Berkeley, California
37.5”
26.5”
18.1”
16
TOP ELEVATION
SIDE ELEVATION
TABLE FRAME
Found: 02/19/2016 7:30PM2343 California Street Berkeley, California
41.25”
1.5”
35.4”
1” = 0’-6”
1” = 0’-6” 1” = 0’-6”
1” = 1’-0”
43
13
TOP ELEVATION SIDE ELEVATION
STORAGE SHELF
Found: 02/13/2016 1:40PM3220 Baker Street Berkeley, California
12.3”
8.7”
12.3”
14
TOP ELEVATION
FRONT ELEVATION
WOOD BLINDS
Found: 02/13/2016 2:30PM1101 62nd Street Oakland, California
30.5”
15
FRONT ELEVATION
TELEVISION SET
Found: 02/18/2016 3:40PM1650 Tyler Street Berkeley, California
37.5”
26.5”
18.1”
16
TOP ELEVATION
SIDE ELEVATION
TABLE FRAME
Found: 02/19/2016 7:30PM2343 California Street Berkeley, California
41.25”
1.5”
35.4”
1” = 0’-6”
1” = 0’-6” 1” = 0’-6”
1” = 1’-0”
13
TOP ELEVATION SIDE ELEVATION
STORAGE SHELF
Found: 02/13/2016 1:40PM3220 Baker Street Berkeley, California
12.3”
8.7”
12.3”
14
TOP ELEVATION
FRONT ELEVATION
WOOD BLINDS
Found: 02/13/2016 2:30PM1101 62nd Street Oakland, California
30.5”
15
FRONT ELEVATION
TELEVISION SET
Found: 02/18/2016 3:40PM1650 Tyler Street Berkeley, California
37.5”
26.5”
18.1”
16
TOP ELEVATION
SIDE ELEVATION
TABLE FRAME
Found: 02/19/2016 7:30PM2343 California Street Berkeley, California
41.25”
1.5”
35.4”
1” = 0’-6”
1” = 0’-6” 1” = 0’-6”
1” = 1’-0”
45
41
17
SIDE ELEVATION FRONT ELEVATION
CHAIR
Found: 02/20/2016 7:30PM2343 California Street Berkeley, California
1.5” 16”
18”
18
SIDE ELEVATIONS
FRONT ELEVATION
GLASS WINDOW AND WOOD FRAME
Found: 02/23/2016 2:05PM2405 Acton Street Berkeley, California
30”
9”26”
30”
15.36”
19
TOP ELEVATION
SIDE ELEVATION
IRONING BOARD
Found: 02/25/2016 12:35PM1623 Alcatraz Avenue Berkeley, California
1½” = 2’ -0”
54”58.6”
34.5”
20
SIDE ELEVATION FRONT ELEVATION
CHAIR
Found: 02/25/2016 12:35PM1623 Alcatraz Avenue Berkeley, California
11.26”
17.5”
12.36”
20.65”
1” = 1’-0” 1” = 1’-0”
1” = 1’-0”
17
SIDE ELEVATION FRONT ELEVATION
CHAIR
Found: 02/20/2016 7:30PM2343 California Street Berkeley, California
1.5” 16”
18”
18
SIDE ELEVATIONS
FRONT ELEVATION
GLASS WINDOW AND WOOD FRAME
Found: 02/23/2016 2:05PM2405 Acton Street Berkeley, California
30”
9”26”
30”
15.36”
19
TOP ELEVATION
SIDE ELEVATION
IRONING BOARD
Found: 02/25/2016 12:35PM1623 Alcatraz Avenue Berkeley, California
1½” = 2’ -0”
54”58.6”
34.5”
20
SIDE ELEVATION FRONT ELEVATION
CHAIR
Found: 02/25/2016 12:35PM1623 Alcatraz Avenue Berkeley, California
11.26”
17.5”
12.36”
20.65”
1” = 1’-0” 1” = 1’-0”
1” = 1’-0”
47
17
SIDE ELEVATION FRONT ELEVATION
CHAIR
Found: 02/20/2016 7:30PM2343 California Street Berkeley, California
1.5” 16”
18”
18
SIDE ELEVATIONS
FRONT ELEVATION
GLASS WINDOW AND WOOD FRAME
Found: 02/23/2016 2:05PM2405 Acton Street Berkeley, California
30”
9”26”
30”
15.36”
19
TOP ELEVATION
SIDE ELEVATION
IRONING BOARD
Found: 02/25/2016 12:35PM1623 Alcatraz Avenue Berkeley, California
1½” = 2’ -0”
54”58.6”
34.5”
20
SIDE ELEVATION FRONT ELEVATION
CHAIR
Found: 02/25/2016 12:35PM1623 Alcatraz Avenue Berkeley, California
11.26”
17.5”
12.36”
20.65”
1” = 1’-0” 1” = 1’-0”
1” = 1’-0”
49
17
SIDE ELEVATION FRONT ELEVATION
CHAIR
Found: 02/20/2016 7:30PM2343 California Street Berkeley, California
1.5” 16”
18”
18
SIDE ELEVATIONS
FRONT ELEVATION
GLASS WINDOW AND WOOD FRAME
Found: 02/23/2016 2:05PM2405 Acton Street Berkeley, California
30”
9”26”
30”
15.36”
19
TOP ELEVATION
SIDE ELEVATION
IRONING BOARD
Found: 02/25/2016 12:35PM1623 Alcatraz Avenue Berkeley, California
1½” = 2’ -0”
54”58.6”
34.5”
20
SIDE ELEVATION FRONT ELEVATION
CHAIR
Found: 02/25/2016 12:35PM1623 Alcatraz Avenue Berkeley, California
11.26”
17.5”
12.36”
20.65”
1” = 1’-0” 1” = 1’-0”
1” = 1’-0”
THE MARGINAL INSTALLATION
Images and documentation of the installation process, duration, and de-installation.
53
57
59
THANKS
A speacial thank you to my thesis advisors, Andrew Atwood and Andy Shanken, local community member Zach Franklin, property owner DIma Tsenter, and my assistant and friend Gregory Camargo.
61