The main rationale behind developing the warranty clause template is to make the prospective contractors implement a maintenance philosophy which would provide improvement in the overall condition of each of the asset items they maintain during the contract term rather than just maintaining them to meet the performance targets specified in the contract. This would make it possible for those asset items to possess better long term performances. Although the scope of this research is limited to VDOT-issued contracts, some of the principles and approaches used during the development of the warranty clause template can also be referred to by the other state DOTs. Following issues need to be considered before proceeding with the implementation of warranties: 1. Type of projects appropriate for warranty implementation 2. Length of the warranty period 3. Criteria to be used in evaluating warranty compliance 4. Evaluation of proposals and award of the contract 5. Evaluating warranty compliance and implementation of remedies 6. Bonding issues 7. Cost issues 8. Quality issues 9. Disputes and litigation 10. Quality assurance/quality control 11. Data collection and inspection by the state DOT 88% 100% 0 Z X Time O verall C ondition R ating 90% % A 88% 100% 0 W Time O verall C ondition R ating 90% % B 88.0% 89.0% 90.0% 91.0% 92.0% 93.0% 94.0% 95.0% 96.0% 97.0% 98.0% 0 1 2 3 4 5 Years O verallC o n d itio n R It can be concluded that the warranty concept in highway maintenance contracting is a rather new concept which still needs a substantial amount of evaluation and which deserves much attention from interested parties. July 1995: Public-Private Transportation Act of Virginia was passed October 1995: An unsolicited proposal was submitted to VDOT December 1996: VDOT has initiated the first performance-based asset management project to in Virginia Development of Performance Warranties for Performance-Based Road Maintenance Contracts by Mehmet Egemen Ozbek ([email protected]) and Jesús M. de la Garza ([email protected]), Virginia Tech Sponsored By: Virginia Department of Transportation (VDOT) 1) Background Fence to fence maintenance Incident management Snow removal “…acquire, construct, improve, maintain, and/or operate one or more transportation facilities…” (PPTA 1995) “A performance-based highway maintenance contract is a contract under which the contractor undertakes to plan, program, design, and implement maintenance activities in order to achieve specified short and long term road condition standards…” (Frost and Lithgow 1998, p. 2) Asset management is a systematic process of maintaining, upgrading, and operating physical assets.” (Falls et al. 2001, p. 2) 2) Problem Increased control of the contractor Possible innovative construction techniques implemented by the contractor Greater assumption of liability by the contractor WARRANTY Figure 1: Possible outcome of a performance-based road maintenance contract without warranties 3) Benefits THE WARRANTY CONCEPT Improvement of the overall condition of assets Long term performance of assets Figure 2: Performance-based road maintenance contract with warranties 4) Warranty Criterion Table 1: Performance Criteria and Performance Target for the “Paved Ditches” asset item Defect for each Asset Item Warranty Criterion for each Asset Item 5) Warranty Length Alternative 1&2 Alternative 3 Figure 3: Establishing the length of the warranty using Alternative 1 or 2 Figure 4: Establishing the length of the warranty period using Alternative 3 6) Conclusions 88.0% 88.5% 89.0% 89.5% 90.0% 90.5% 91.0% 91.5% 92.0% 1 2 3 4 5 Years O verall C o n d itio n Ra Performance Target: 90% Contract Completion Fix the Overall Condition Rating wanted at the end of the Contract Term as “A” or “100%” Calculate the length of the warranty period as “Z” or “X”, using the Normal Deterioration Curve Contract Completion and beginning of the Warranty Period Performance Target: 90% A ssetItem Perform ance C riteria Perform ance Target Paved D itches < 1’’settlem ent no underm ining orundercutrequiring action < 25% spalled no obstruction to flow ofw aterthatrequiresaction 90% Defect for the “Paved Ditches” asset item can be stated as: Meeting the performance criteria for less than 90% of the total amount of paved ditches present in the interstate system maintained by the contractor”. Warranty criterion for the “Paved Ditches” asset item can be stated as: Meeting the performance criteria for at least equal to or more than 90% of the total amount of paved ditches present in the interstate system maintained by the contractor”. Fix the Length of the Warranty Period, “W” 2 Calculate the Overall Condition Rating required at the end of the contract term, “B” 1 1 2 1 2 3 4 5 6

Transcript of The main rationale behind developing the warranty clause template is to make the prospective...

Page 1: The main rationale behind developing the warranty clause template is to make the prospective contractors implement a maintenance philosophy which would.

The main rationale behind developing the warranty clause template is to make the prospective contractors implement a maintenance philosophy which would provide improvement in the overall condition of each of the asset items they maintain during the contract term rather than just maintaining them to meet the performance targets specified in the contract. This would make it possible for those asset items to possess better long term performances.

Although the scope of this research is limited to VDOT-issued contracts, some of the principles and approaches used during the development of the warranty clause template can also be referred to by the other state DOTs.

Following issues need to be considered before proceeding with the implementation of warranties:

1. Type of projects appropriate for warranty implementation2. Length of the warranty period3. Criteria to be used in evaluating warranty compliance4. Evaluation of proposals and award of the contract5. Evaluating warranty compliance and implementation of remedies6. Bonding issues7. Cost issues8. Quality issues9. Disputes and litigation10. Quality assurance/quality control11. Data collection and inspection by the state DOT

88%

100%

0 Z X

Time

Ov

era

ll C

on

dit

ion

Ra

tin

g

90%%

A

88%

100%

0 W

Time

Ov

era

ll C

on

dit

ion

Ra

tin

g

90%%

B

88.0%

89.0%

90.0%

91.0%

92.0%

93.0%

94.0%

95.0%

96.0%

97.0%

98.0%

0 1 2 3 4 5

Years

Ov

era

ll C

on

dit

ion

Ra

tin

g

It can be concluded that the warranty concept in highway maintenance contracting is a rather new concept which still needs a substantial amount of evaluation and which deserves much attention from interested parties.

July 1995: Public-Private Transportation Act of Virginia was passed

October 1995: An unsolicited proposal was submitted to VDOT

December 1996: VDOT has initiated the first performance-based asset management project to in Virginia

Development of Performance Warranties for Performance-Based Road Maintenance Contracts by Mehmet Egemen Ozbek ([email protected]) and Jesús M. de la Garza ([email protected]), Virginia Tech

Sponsored By: Virginia Department of Transportation (VDOT)

1) Background

Fence to fence maintenance Incident managementSnow removal

“…acquire, construct, improve, maintain, and/or operate one or more transportation facilities…” (PPTA 1995)

“A performance-based highway maintenance contract is a contract under which the contractor undertakes to plan, program, design, and implement maintenance activities in order to achieve specified short and long term road condition standards…” (Frost and Lithgow 1998, p. 2)

“Asset management is a systematic process of maintaining, upgrading, and operating physical assets.” (Falls et al. 2001, p. 2)

2) ProblemIncreased control of the contractor Possible innovative construction techniques implemented by the contractor

Greater assumption of liability by the contractor

WARRANTY

Figure 1: Possible outcome of a performance-based road maintenance contract without warranties

3) Benefits

THE WARRANTY CONCEPT

Improvement of the overall condition of assets

Long term performance of assets

Figure 2: Performance-based road maintenance contract with warranties

4) Warranty Criterion

Table 1: Performance Criteria and Performance Target for the “Paved Ditches” asset item

Defect for each Asset Item Warranty Criterion for each Asset Item

5) Warranty LengthAlternative 1&2

Alternative 3

Figure 3: Establishing the length of the warranty using Alternative 1 or 2 Figure 4: Establishing the length of the warranty period using Alternative 3

6) Conclusions

88.0%

88.5%

89.0%

89.5%

90.0%

90.5%

91.0%

91.5%

92.0%

1 2 3 4 5

Years

Ov

era

ll C

on

dit

ion

Ra

tin

g

Performance Target: 90% Contract Completion

Fix the Overall Condition Rating wanted at the end of the Contract Term as “A” or “100%”

Calculate the length of the warranty period as “Z” or “X”, using the Normal Deterioration Curve

Contract Completion and beginning of the Warranty Period

Performance Target: 90%

Asset Item Performance Criteria Performance Target

Paved Ditches

< 1’’ settlement no undermining or undercut requiring action < 25% spalled no obstruction to flow of water that requires action

90%

Defect for the “Paved Ditches” asset item can be stated as: “Meeting the performance criteria for less than 90% of the total amount of paved ditches present in the interstate system maintained by the contractor”.

Warranty criterion for the “Paved Ditches” asset item can be stated as: “Meeting the performance criteria for at least equal to or more than 90% of the total amount of paved ditches present in the interstate system maintained by the contractor”.

Fix the Length of the Warranty Period, “W”

2

Calculate the Overall Condition Rating required at the end of the contract term, “B”

112

1

2

3

4

5