The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array...

14
AADC - LFAA 9 May 2016 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij de Vaate

Transcript of The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array...

Page 1: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 1

ApertureArrayDesign&ConstructionConsortium

TheLowFrequencyApertureArrayJanGeraltBijdeVaate

Page 2: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 2• Installed April 2013Credit: MWA Project, Curtin University

Page 3: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 3

SKA1-LOW

Station x

DigitalFibre

Station 2

Station 1

Core DigitalFibre

LogPeriodicantenna

DataoutPower

Cooling

… … ClockPower

Distance

ClockPowerRPF 1

ClockPowerRPF 2

CPFCentralProcessingFacility

• 131,072 antennas• 512 stations• xx% in ‘Central Area’

– 95% to 55%?

• Large centralprocessing

RPF x

RFoFFibre

TM

Page 4: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 4

AAVS1

• 400 antennas, one full station plus three small stations

1

2

3

4

TPMs

….

1

3

25

Data SwitchData Switch

MCCSServers

MCCSServers

“TM”Controller

MWAControlSystem

InternetI/F

BeamstoMWACorrelator

SignaldataRecorder(server)

Signaldatarecorder(server)

InternetI/F

Fibresplicing

ClocksfromMWA/Maser

ClockDist

….

Power

Power

MROMainBuilding

Stationbox

Fibrecables576-core

Patchcables

SpliceBox

Power

Page 5: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 5

Consortium Organisation

Page 6: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 6

Where are we (1)

• Preliminary Design Review, PDR, Jan 2015, successful• All stage 1 milestones completed• AAVS1 Detailed Design Review, DDR, completed Oct 2015• Scheduled Stage 2 milestones completed

– Draft RAM report– Preliminary installation plan– ICDs

and more..

Page 7: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 7

Where are we (2)

• Close to cost target• Power on budget• Schedule fine for most milestones

Page 8: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 8

Where are we (3)

• Risks:– Calibration → good results– Tile Processor module → working prototypes– RFoF links → within spec → potential to go up to 50km?

All Hunky-dory?

Page 9: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 9

Where are we (3)

• Schedule under pressure– AAVS1 construction is delayed– Full CDR in April 2017 not possible– 80% ready by April 2017– AAVS1 evaluation completed Q4 2017

• Antenna modification needed

• Known impact on CDR preparation:– L1 requirements updates– ECPs– System PDR

Page 10: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 10

Upcoming

• New configuration, “for costing only”– Request for cost update, due 3rd June

• L1 version 7

• Invitation for an Expression of Interest on SKA1 construction– To the SKAO members– Responses by 3rd June

• Invite to submit SODP plans:– LOW, PAFs, WBSFP, MFAA– Responses by mid June

Page 11: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 11

This week

• SKA1-Low• Progress work packages

• Low frequency pathfinders and precursors:– MWA, LOFAR, NenuFar, MAD/SAD, EDA

• Telescope Team, TT-LOW meeting on Thursday+Friday• Break outs

Page 12: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 12

TT-LOW

Page 13: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 13

Achievements

→ €7M

→ €4.5M

€11.5M

Page 14: The Low Frequency Aperture Array - INAF · 2016. 5. 9. · 9 May 2016 AADC - LFAA 1 Aperture Array Design & Construction Consortium The Low Frequency Aperture Array Jan Geralt Bij

AADC - LFAA9 May 2016 14

• We could pay our shareholder…Or build a beautiful Telescope