The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri Morris Planning Department – Neath Port Talbot CBC Date: 2.00pm Wednesday 11 th May 2011. Venue: Port Talbot Civic Centre.

Transcript of The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder...

Page 1: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The Local Development Plan (LDP):‘Pre-Deposit’ – Stakeholder Engagement

Presentation:PORT TALBOT SPATIAL AREA

Officers: Carl Comerford & Ceri MorrisPlanning Department – Neath Port Talbot CBC

Date: 2.00pm Wednesday 11th May 2011.Venue: Port Talbot Civic Centre.

Page 2: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Content:• Part 1 – Introduction:

What is a Local Development Plan (LDP)?What is the purpose of the meeting?Neath Port Talbot – the major issues;Key tasks in setting the LDP Strategy.

• Part 2 – Considering the Overall Strategy:The LDP Vision (2011-2026);The Overall Level of Growth;The Overall Spatial Strategy.

• Part 3 – Considering the Strategy for Port Talbot:Local / Neighbourhood Strategy;Strategy for Port Talbot;Strategy for Other Key Topic Areas.

Page 3: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

PART 1:Introduction

Page 4: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

What is a Local Development Plan?

• The Council is required to prepare a LDP;• The LDP will set out the Council’s strategy,

objectives and policies for the development and use of land in Neath Port Talbot – or more simply, ‘identify what can be built and where’;

• When adopted the LDP will be the primary document for use in the determination of planning applications and appeals;

• It will have a major influence on the future shape of Neath Port Talbot and its individual communities.

Page 5: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

How will the LDP be prepared?• The Council is committed to engaging with you – the

stakeholders – and the community throughout;• This will ensure that the Plan reflects the needs of the

area and its communities;• Council Members will act as local champions:

Not expressing definitive views at this stage but simply identifying the issues and passing on local aspirations & opinion to officers;

• For Plan preparation, the County Borough has been split into 8 Spatial Areas – based on what we regard as identifiable communities.

Page 6: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The LDP Spatial Areas:

Page 7: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The LDP Stages:• Pre-Deposit Plan:

Stakeholder Engagement – May 2011.6 week formal consultation – Sept / Oct 2011.

• Full Deposit Plan:Stakeholder Engagement – Oct / Nov 2012;6 week formal consultation – February 2013.

• Examination in Public (EIP):November 2013;

• LDP Adoption:November 2014.

Page 8: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The Purpose of the Meeting?

To help develop and agree the LDP Strategy, we need to:

• Present & discuss the range of alternative strategic options with you;

• Gain your views on our proposed ‘preferred option’; and

• Consider the implications for Port Talbot.

• Ultimately, you can either:Agree or Disagree; or perhapsSuggest an additional alternative option.

• Either way – your views will be recorded and considered!

Page 9: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Neath Port Talbot – a description:

How do we best describe the County Borough today…

“An area with potential, but in need of support”

Page 10: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Neath Port Talbot – the positives:• High value landscapes in terms of the:

Underlying geology;Cultural & historical heritage;Ecology;Visual amenity;Tranquillity & sense of place.

• A wealth of natural resources that are significant on a National scale – both mineral & wind related;

• Tourism opportunities focussed on the Upper Afan Valley, Neath Valley & Margam Park;

• Community spirit / cohesion.

Page 11: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Neath Port Talbot – the negatives:

• After a period of growth, more recently the trend in population change has been one of ‘slow decline’;

• Ageing population with poor health;

• Valleys and Towns losing jobs with little commercial investment in our centres;

• Commuting has become a necessity but is a cause of congestion.

Page 12: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Key Tasks in setting the LDP Strategy:The key tasks in setting the overall Strategy are to:

• Identify the appropriate level of population and economic growth;

• Identify how this growth should be shared out across the County Borough;

• Focus on delivery at the neighbourhood level;

• Deliver healthy, safe and sustainable communities; and

• Identify what residents should expect to be within easy walking distance and be easily accessible.

Page 13: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

PART 2: Considering the Overall Strategy

Page 14: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The LDP Vision (2011-2026):

…simply put – how do we want the County Borough to look in 2026?

• Our vision takes account of:

The Wales Spatial Plan;

Neath Port Talbot Community Plan;

Comments made at the Stakeholder Meetings held in the Spring 2009.

Page 15: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The LDP Vision:

“Neath Port Talbot will develop a vibrant waterfront and coastal corridor with a modern, competitive, knowledge-based economy complemented by a network of distinctive valley communities.

Communities will be strengthened as greater opportunities are provided for all and Neath Port Talbot becomes a stronger, more vibrant, community focussed and sustainable place.

Neath Port Talbot’s natural resources and potential for renewable energy will be conserved and when exploited the benefits to the local communities will be maximised.

The culture and heritage will be protected and enhanced as the County Borough adapts to environmental and economic change in a greener, healthier and safer environment.

Within the Amman and Swansea Valleys the well-being of the Welsh Language, as a significant part of the communities’ social fabric, will be promoted”.

Page 16: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The Overall Level of Growth – Options:

• Setting the ‘Growth Strategy’ has important implications on the scale and location of new development;

• 7 Growth Options for new housing across the County Borough have been considered and assessed for the LDP:

Very High (705 residential units built per year);High (599 residential units built per year);Medium (460 residential units built per year);Moderate (419 residential units built per year);Static (285 residential units built per year);Moderate Decline (231 residential units built per year); andHigh Decline (178 residential units built per year).

Page 17: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Our ‘Preferred’ Growth Option:• MODERATE GROWTH – why is this option

preferred?It reflects past levels of population growth and house building in the area;

It provides enough growth to promote new investment in the area;

It provides enough growth to sustain communities and their existing facilities, businesses and services; and

The level of growth minimises adverse impacts including loss of countryside and the creation of traffic / pollution.

Page 18: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The Overall Spatial Strategy:

• Having considered the level of growth, it is now necessary to discuss the Spatial Strategy – i.e. ‘where to steer and focus the new development and investment’.

• 4 Spatial Options have been considered and assessed for the LDP.

Page 19: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The Overall Spatial Strategy – Options:

• Option 1 – Continue with the current UDP Strategy:Some new development in main urban areas and coastal belt;Some new housing and regenerating activities in the valleys.

• Option 2 – Focus on the M4 / Fabian Way Corridor:All new development in main urban areas and coastal belt;Decline in the valleys.

Page 20: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

The Overall Spatial Strategy – Options:

• Option 3 – Promote significant growth in the valleys:Large-scale housing led development in the valleys;Increased commuting and travel;Relocation of public sector jobs to valleys.

• Option 4 – Focus on coastal area & reinvigorate valleys:Majority of development in the main urban areas & coastal belt;Greater emphasis to reinvigorate the valley communities through promoting housing, small business & tourism.

Page 21: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Our ‘Preferred’ Spatial Option:• OPTION 4 – focus growth on the coastal area and

reinvigorate the Valley communities.• This option will:

Focus majority of development along the M4 corridor and in the urban areas of Neath, Port Talbot & to a lesser extent Pontardawe;

Support small businesses and tourism;

Prioritise Pontardawe & Glynneath as growth points in the valleys – reflecting employment growth in retail, manufacturing & coal related activities; and

Encourage increased house building in Valleys.

Page 22: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Our ‘Preferred’ Growth & Spatial Options:

When combining the preferred Options, this means:• An average build rate of 420 residential units across the

County Borough per year;

• When taking into account existing commitments (i.e. current planning permissions such as Coed Darcy) – this means that extra land allocations will need to be identified across the County Borough over the Plan period to accommodate approximately 700 houses;

• Based on past build rates over the last 10 years – the distribution would be Neath (240 houses), Port Talbot (280 houses), Pontardawe (50 houses) and the Valleys would take up the remainder.

Page 23: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Our ‘Preferred’ Options:

• Your views?

Do you agree or disagree?

If you disagree – tell us why / and what would be your preference?

Page 24: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

PART 3:Considering the Strategy

for Port Talbot

Page 25: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Port Talbot Spatial Area:

Communities:

Aberavon;Baglan;Bryn & Cwmavon;Margam;Port Talbot;Sandfields;Taibach.

Page 26: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Local / Neighbourhood Strategy:

• Overall – to promote healthier, safer and stronger communities:

Neath, Port Talbot & Pontardawe – identified as important hubs in the local public & community transport network with a wide range of services, facilities & shops;

Community level – to provide a wider range of services, facilities & shops; and

Neighbourhood level – to provide access to open and green space, local shops and community facilities.

Page 27: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Port Talbot:

The issue…

“Port Talbot is increasingly becoming a dormitory with little commercial investment in the centre and commuting becoming a necessity”.

Page 28: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Port Talbot:• Baglan Bay to be promoted as a major regional

employment site incorporating new housing;• Harbourside area to be redeveloped to provide a

waterside gateway to the town – including housing, retail, employment, education & waterside leisure and recreation;

• Pressure to develop a new superstore – locate in the town centre;

• Encourage commuters to car share;• Expansion of Cae Garw Gypsy site.

Page 29: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Port Talbot:

• HOUSING – the LDP will deliver housing ‘need’through a combination of:

Allocating ‘large’ strategic sites [i.e. 10 or more dwellings] / Pre-Deposit Stage; and

Identifying ‘small’ sites [i.e. less than 10 dwellings] –delivered through so-called ‘infill’ plots, extensions to settlement limits and candidate sites / Deposit Stage.

Today we will only be discussing the options for the allocation of large sites…

Page 30: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Port Talbot:

HOUSING:• Issue: in order to deliver ‘Moderate Growth’ – and

when taking into account existing commitments –there is a need to provide extra land allocations for 280 new houses in Port Talbot (over the Plan period);

• Strategic Options: this future growth will need to be delivered in one of the following ways:

An extension to Coed Hirwaun; orThe release of a number of smaller sites to disperse the growth around the urban area.

Page 31: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri
Page 32: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri
Page 33: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Other Key Topic Areas:

RENEWABLE ENERGY / WINDFARMS:• WAG Strategic Search Areas identify areas for large

windfarms (greater than 25mw) – the Council must accept the likelihood of the exploitation of such resources in these areas;

• Outside these, areas of search will identify areas for small windfarms (less than 25mw);

• Potential for other sources of renewable energy will be identified; and

• ‘Developer Contributions’ should be used to support the local communities.

Page 34: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri
Page 35: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Other Key Topic Areas:

MINERALS (COAL & AGGREGATES):• NPT has a wealth of mineral resources that are

significant on a National scale – the Council must accept that such resources will need to be safeguarded and ‘where appropriate’ will be allowed to be exploited;

• Settlements (10+ houses) will be protected from mineral development by 500m buffer zones;

• ‘Developer Contributions’ should be used to support the local communities.

Page 36: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri
Page 37: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri
Page 38: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Other Key Topic Areas:WELSH LANGUAGE:

• Prioritise protection of the Welsh Language in the Welsh Language Board’s ‘Area of Special Language Importance’ – i.e. Cwmgors / Brynamman / Cwmllynfell / Ystalyfera; and

• Ensure development proposals in Welsh speaking areas are supported by a:

‘Welsh Language Impact Assessment’; and ‘Welsh Language Action Plan’ which should identify potential mitigation measures.

Page 39: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Other Key Topic Areas:

TRANSPORT:

• Provide ‘Park & Share’ facilities to improve commuting;

• Provide a network of cycle and walking routes for everyday use;

• Support public & community transport; and

• Target key bottlenecks to tackle congestion.

Page 40: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Other Key Topic Areas:

ENVIRONMENT:

• Protect countryside & wildlife – in particular the protection of Priority Habitats;

• Designation of Green Wedges;

• Creation of Special Landscape Areas (SLAs); and

• Open / Green Space Strategy will protect habitats within urban areas.

Page 41: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Strategy for Other Key Topic Areas:

SUSTAINABLE & HEALTHY COMMUNITIES:• Location of new development – avoid areas of

noise / air pollution & flood risk;• Improve access to facilities, services and open

space at the local level (i.e. within walking distance);

• Where appropriate apply ‘secure by design’principles;

• Encourage proposals for mixed-use development within settlement limits.

Page 42: The Local Development Plan (LDP)The Local Development Plan (LDP): ‘Pre-Deposit’ – Stakeholder Engagement Presentation: PORT TALBOT SPATIAL AREA Officers: Carl Comerford & Ceri

Contact Details:

Website: www.npt.gov.uk/ldp

E-mail: [email protected]