Page 2: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Contact Information:

Dale Sartor, P.E.Lawrence Berkeley National LaboratoryApplications TeamMS 90-3011University of CaliforniaBerkeley, CA 94720

[email protected](510) 486-5988http://Ateam.LBL.gov

Page 3: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Case Study:The Lawrence BerkeleyNational Laboratory

The LBNL In-House Energy Management Program

Retrofit Projects

New Construction

Program Cost and Impact

Utility Cost Management

Lessons Learned

Page 4: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Strategies

Organizational structure

IHEM studies and retrofits

Life-cycle cost effective designs

Maintenance

Lowest utility cost

Recharge users

Employee awareness

Track performance

R & D

Page 5: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Key Barrier and Success Factor

Institutional Challenge:Success = Change

Key to Success:Upper Management Support

Page 6: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Staff

Dedicated in-houseengineers, andproject managers.

Scientists borrowedfrom research division.

Consultants.

Page 7: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Retrofit Projects

– Direct funded

– Utility surcharge funded

– Energy Savings Performance Contract

Energy Efficiency Studies (40+ since 1985)

Energy Efficiency Retrofits (30+)

Page 8: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Typical Retrofit Projects

Constant Velocity VAV Fume Hood control.

VFD control for fans and pumps.

DDC/EMCS (over 8,000 points in place).

T-8/Electronic Ballast lighting.

Occupancy sensor controlled lighting.

LED exit signs.

CFLs.

Page 9: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Typical RetrofitProjects, continued

Premium Efficiency Motors.

Consolidation of Boiler and Chiller plants.

Modular boilers.

Small base loaded chillers.

Page 10: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Typical Retrofit Projects, continued

Mechanical equipment

replacements.

Waterside economizers.

Metering.

Process.

Page 11: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Instrumented Surveys

Uncovers “hidden” opportunities.

Improves quantification of savings.

Aids in commissioning and persistence.

Can save purchase of new unneeded capacity.

Page 12: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

New Construction

Conceptual Design Report

Energy Efficiency Report

Project team participation

Good retrofit projects

Page 13: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Reduce Load

• Focus on the big hits

Page 14: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Goal

Energy Efficiency is the Base Case!

Page 15: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Opportunities are Real

41% reduction in energy use per square foot from 1985 baseline

$4.4 million/year more research based on 1985 energy prices

Pollution savings

Improved worker productivity

Safer environment

Improved reliability

Page 16: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

FY 1985

FY 1986

FY 1987

FY 1988

FY 1989

FY 1990

FY 1991

FY 1992

FY 1993

FY 1994

FY 1995

FY 1996

FY 1997

FY 1998

FY 1999

FY2000

Last 4

QtrsR

educ

tion

Fro

m F

Y 1

985

Bas

elin

e B

TU

s/G

SF

Actual Goal

Reduction in Buildings BTUs/GSF

Opportunities are Real

Page 17: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Investment Required

Studies: $2.6 million Retrofit: $20 million

Page 18: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Utility Cost Management

Billing errors (Typically $75- 100K/year) Electricity: WAPA @ $.035/KWh (-) Natural Gas: Defense Fuel Supply Center Saving $.10/Therm Overall 40% savings due to rate reduction

Page 19: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Integrated Supply and Demand Side Energy Management

Potential Savings Over 60%

Baseline: $11.0 million

Actual: $ 3.8 million

Overall savings: $7.2 million (or 65%)

Page 20: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Lessons Learned

Outside air dominant load - focus on HVAC.

Fume hood VAV (constant velocity) safe and efficient.

DDC/EMCS to zone.

Commissioning and ongoing O&M important.

Don’t oversize boilers and chillers - use modular units.

Avoid reheat.

Technology is improving.

Page 21: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

Success Factors

Champion

Identify hot buttons

Upper management support

Page 22: The lawrence berkeley national laboratory: a case study Revised 12/2/04.

End of Session