101/1, Tollygunge Road.Kolkata.700 026. India Tele-fax No : 91-033-24638997, 91-033-24648505 Cellular Phone No: 098301-83828 Email Address : [email protected] Website Address : http://www.the_indesign.com
Contents
ABOUT US page 1 SCOPE OF INTERIOR FIT-OUT WORKS page 3
QUALITY ASSURANCE PLAN page 4
ENVIROMENT, HEALTH, SAFETY RULES & PROCEDURE page 5
ADMINISTRATION & WORKSHOP page 13 BANKERS page 13
TECHNICAL & PROJECT TEAM page 14 ADMINISTRATION & FINANCE page 14
WORK FORCE page 15
WORKSHOP EQUIPMENT page 15
SUB CONTRACTORS page 16 PROJECT DETAILS page 17
THE INDESIGN has rightly proved that “a journey of a thousand miles begin with a first step”. What began as a
small shop in the name of Globe Furniture, on Marquis Street, old Calcutta more than three decades back, has now turned into one of the most renowned company in the field of interior decoration and designing not only in Kolkata but in
other parts of India as well. Founded and led by Late MR SHANTILAL JAIN in the year 1972 under then renowned
Architect MR GOURI GHOSH, it has worked its way all through the years. Mr S.L Jain had a vision that gave the
impetus to interior designing; it needed so seriously at that time. He added much to the acclaim and present status of interior decoration and designing that it now enjoys. It has to its credit the privilege of working with the most prestigious and big names among the corporate and industrial houses. Kothari Medical Hospital, Daga Villa- Amritsar, Cheviot Jute Industries, and Bengal Rowing Club are a few of our projects in the early years. We have worked successfully with some of the leading names in business-R.S. Goenka, Birla Group, Periwal (National Ply), to name a few. With over 30 years of expertise and planning, it has made an impressionable mark in the field of interior decoration and designing, ever since its inception. We understand the need for creating elegant yet functional designs that are a blend of classical and modern styles. Special emphasis is laid on architectural details, lighting and space management. Our designs focus on creating timeless environments that stand out from the rest. Quality, durability and utility are the most important focus of all our creations. Our clients range from top corporate houses, elegant showrooms to all types of residential projects and their needs and desires are suitably taken into consideration by our experts We have now expanded as one of the leading Interior Decorators in Kolkata having four factories with approx. 20,000 Sq. ft. covered area, the main being located in the heart of the city at Tollygunge Road and is fully mechanized. We are well equipped with all type of wood- working machines and tools, in house designing and over 300 highly skilled permanent and contract workmen comprising of Carpenters, Carvers, Polishers, Painter, Marble Mistries, P.O.P Mistries, Cabinet Makers, Machine Operators and Other Technical Personal for Wooden Frame, Panel Doors, Flush Doors and Moldings etc., besides Account and other Office Staff. We also have had the opportunity of working with some of the finest and best known designers and architects - Mr. Kapil Bhalla, Mrs. Kiran Pakti (Bombay), Mr. Rajendra Kumar (Delhi), Mrs. Fransisca of Richmond International, London; M/s Sanon Sen & Associates, Kolkata and worth mentioning M/s Dulal Mukherjee & Associates with whom we have finished three major projects.
We proficiently equipped to execute large scale interior designing projects of Commercial Complexes, Corporate Offices, Institutional Projects, Hospital Projects, Health Resorts, 3 To 5 Starred Hotel, Holiday Resorts and Amusement Parks. The company takes turnkey assignment as per clients need. The company operates under the able direction of, MR.
SUMIT BARADIA who personally ensures maintenance of high standard from aesthetic and utility point of view.
Earlier in the name of Hindustan Interiors and Wood Pvt. Ltd., we have already completed major projects like Windsor Manor Sheraton and Towers, Bangalore valued Rs.1.10 Crore and Mourya Sheraton and Towers, New Delhi valued Rs.65 Lakhs both being of I.T.C. Group besides other projects. We have also negotiated the Suite Rooms of Everest Hotel, Kathmandu besides their Bungalow work at Mahrajganj Nepal. We have done the door/windows frames & shutters etc. of M/s. Ganapati Grenfield Pvt. Ltd. Raichak site to the tune of Rs.50 Lakhs (approx.) We must further mention that an All India Pre-qualification Tender was floated by Balmer Lawrie Co. Ltd. and we were one of the three interior decorators selected by them for IBP House, Kolkata the value of the project being Rs.1.55 Crore which is completed. We have also executed the office interiors of Siemens Ltd. Kasba the value of the project being Rs.1.00 Crore. Beside this year have done a number of offices guest house of Indian Statistical Institute and the Office Interiors of Castrol India Ltd. values Rs 60 Lakhs and 1.3 Crore respectively, Siemens Ltd. Joka Works for Rs.10 Lakhs, Tantia Construction Rs.30 Lakhs, Taj Coromondal Rs 65 Lakhs etc. We have worked for and won the confidence of several eminent Architects and Project Management Consultants of India. Our association with these highly reputed and well-known Organizations and leading Architects/Project Managers/Consultants of India has given us rich and profound experience in setting up World Class Office and Interiors and in return earned their respect, admiration and support (commendation and recommendation). Today, with many new
records, THE INDESIGN is a leading name in contemporary set – ups engaged in Interior Fit-out projects. We are
proud to have attained this position with all our sincere efforts, hard work, and timely completion of projects without any compromise on quality. Our company has complete infrastructure expertise and an excellent support group to take up jobs, which fall within the scope of interior fit-out and allied civil works.
SCOPE OF INTERIOR FIT-OUT AND ALLIED CIVIL WORKS
• Woodwork
• Loose Furniture
• Modular Furniture
• Partitions (Wooden, Aluminum, Glass)
• Glazing works
• Aluminum works
• False Ceiling
• POP works
• Painting & Polishing
• Granite/Granitite/Marble/PVC Floorings
• False/Raised Flooring
• Carpeting & Blinds
• Wall paper & all kinds of Films on glass
• Fire Protection/Detection System
• Access Control System
• Sanitary Works
• Electrical Works
• Air Conditioning Works
• UPS,DG sets, AV system, EPBAX systems etc
• Other allied works and accessories
We would request you to consider our long experience & quality workmanship for your project & enlist our name in your vendors list.
The motto of our organization is Total Customer Satisfaction by providing them Competitive prices, Excellent Quality and On Time Delivery.
QUALITY ASSURANCE PLAN
Procurement of Material :-
We always ensure procurement of material as approved by the Architect and specified in the tender directly from
manufacturer/authorized dealer.
WORKMANSHIP:-
Fabrication & Installation of Work is constantly supervised at site by experienced Supervisors/Project Managers.
SUBCONTRACTS:-
installation of proprietary and specialized items/jobs as specified and approved by the Architect, such as false ceiling,
false floor, access control , electrical & HVAC Works etc. are always arranged through, authorized dealers and renowned
agencies who are well versed in project works since long.
EQUIPMENTS: -
Miscellaneous project items, loose furniture and branded items are always procured directly or through authorized
agencies.
SPECIAL FURNITURES:- Are made in our own workshop at Kolkata by experienced team of task masters.
The well known world class projects that we have completed so far and our continued association with Project Managers/
Architects itself illustrates our quality consciousness and assurance for the same.
ENVIRONMENT, HEALTH, SAFETY RULES & PROCEDURE
Our Responsibilities
• To carry out the work with safety and health of personnel and properties in mind. To notify conditions that constitute hazard to those potentially affected.
• To control the manner and methods of operations.
• To comply with applicable national, local EH &S legislation & regulations and ensure that employees receive proper training on the work to be done.
• To demonstrate good work ethics without circumventing engineered safety devices and control.
• To immediately inform Project Manager when an accident happened to its employee or Client personnel and properties. To submit a brief accident report within 24 hours and a detailed report within 72 hours.
• No minors (below the age of Eighteen years) to be permitted to work on the Project site.
• No kids/ children to be permitted within the Project site.
• To develop an emergency treatment and medical evaluation procedure. To set up a working arrangement with local medical doctor to handle injury cases, and provide for other treatment by a specialist or local hospital.
• All persons must have Basic entry “awareness” of EH&S induction. Smoking
• Smoking is not allowed in the office & toilets. P.P.E
To provide suitable personal protective equipment when the job requires. As per Risk Analysis type and quality of PPE will be recommended for use. This includes:-
• Hardhat with chinstrap.
• Leather safety shoe with steel toe.
• Face Shield to be used during welding.
• Goggles during gas cutting, drilling, grinding, overhead works.
• Hand gloves as per risk analysis
• Earplugs for works at more than 85 db noise level.
• Nose mask in dust, fumes, smoke and gas.
• Full body harness with double lanyard of 1.5m length and snap hook of 50mm diameter for all works at height.
Passageway
• Do not enter other work areas without proper authorization.
• Use established aisles and walkways, do not take short cuts between desks and equipment.
• Passageway and emergency exit doors must be kept clear at all time..
• Passageway and emergency exit doors must have proper signage making it prominently visible. House Keeping
• Clean up spills such as oil on floors immediately. Floors should be free of debris and accumulations of dust.
• Any equipment or tools not in use should be removed from the work area.
• All tripping hazards on floor should be identified and eliminated.
• All costly materials should be kept under lock and key.
• Material temporarily left on site must be stacked properly with a sign placed to warm others. The location shall be accepted by the project manager at site.
• Good housekeeping shall be maintained at all work areas.
• Clean up at the end of the day and completely before handling over of job.
• Food & drinks are not generally allowed on the site.
Storage
• Stored materials should allow at least one meter (or about 3 feet of clear space under sprinkler heads.
• Stacking cartons and drums on a firm foundation and cross tying them, where necessary reduces the chance of their movement.
• Stored materials should not obstruct aisles, stairs, exits, fire equipment, emergency eyewash fountains, emergency showers, or first aid stations.
• All storage areas should be clearly marked. Floor Opening
All floor opening must be protected by one of the following:-
• Rigid guardrail and mid rail.
• Hole cover must be:
• Of minimum 2cm plywood if one dimension is 35 cm or less.
• Of 5cm if both dimension exceed 35 cm.
• Clearly marked with “hole cover” sign Roof and Elevated Floor Edges Roof and elevated floor edges must be protected by one of the following:
• Perimeter guardrail
• Temporary rigid barricades Hand Tools & Machine Tools
• The right size spanner to fit the nut shall be used.
• All of the files shall have a handle.
• Chisels and punches with mushroom heads should be ground.
• Hammerheads shall be tightly wedged on their shafts.
• Split wooden handles shall be renewed.
• Edges of cutting tools shall be kept sharp.
• Hands shall be kept behind the cutting edges when working.
• Tools shall be kept in boxes or racks when not in use.
• Sharp edges of tools that are to be stored or carried shall be scrapped.
• Tools that are worn or damaged beyond repair shall be scrapped.
• The correct tools for the work shall be always used.
• Loaning of tools or equipment from other trades is not allowed.
• When working on machines that are provided with safety covers or safety guards, operate these machines only when the guards are in place.
Chemicals
• Chemicals brought to the site must be labeled for its contents & its hazards with protective measures and the Material Safety Data Sheet (MSDS) to be provided to the project manager. Common household chemicals are exempted from this requirement.
• Large container of chemicals is not allowed to be brought onto the site. Use small container holding only the enough quantity for the day work. Store flammable chemicals properly and ensure it is capped when not in use
Electrical Safety
• Do not tap electricity directly from the distribution boxes without first informing the Project Manager and landlord management representatives.
• A check for defective cables, plugs & sockets shall be carried out.
• Electrical equipment shall not be overloaded.
• Any equipment that sparks or stalls shall be switched off and disconnected.
• Cables should not trail across the floor.
• The equipment should be disconnected when not in use, cable shall not be pulled to disconnect, the plug shall be pulled.
• Kinking, twisting, binding or crushing of cable should be avoided.
• The operator shall not stand on the wet area while using electrical equipment.
• No bare wires to be installed in plug sockets. Only industrial plugs to be used to install any wires to the sockets.
• Joining of cables/ wires shall not be done with plastic insulation tapes.
• Circuit breaks like MCB,ELCB shall be provided in all local extension D.B And panels
• Multiple connections of cables from one switch is prohibited.
• All connection shall be done by cable glands and lugs
• Cable having ample capacity to the load should be use
• Cable with external damage shall not be used.
• Cable only 3 or 4 core cables shall be used.
• Hand held tools shall be equipped with and operating switch or lever requiring constant hand or finger pressure to operate (Dead-man Switch)
• Do not place liquid chemicals near electrical equipment. Liquids spillage on to electrical equipment could create a fire or electrical hazard.
Tagging
• Safety testing and inspection must be done of all low voltage electrical equipment before being placed into service.
• After inspection and testing it shall be tagged.
• All equipments / machines, scaffoldings etc. must be tagged as “safe for use” after visual inspection before being placed into use.
• A record must be maintained. Fire Safety
• To study the emergency exit floor plan located at the office or work site.
• Do not shut down essential fire fighting system, e.g. sprinkler systems, and fire alarm at any time. If there is a need, coordinate with the Project Manager.
• When detecting a fire, immediately activate the nearest fire alarm by pulling the lever or breaking the glass. Only when it is safe to do so, use fire extinguishers to fight the fire.
• When fire alarm is activated, leave your work area immediately, walk to the nearest emergency exit and report to the designated assembly area.
• All alarms must be regarded as true alarms.
• Only when the ‘all clear’ signal is given by the concerned authority can one re-enter the building. Hot work
• Hot work where sparks or heat is produced (e.g using welding equipment, open flame cutting and incendiary devices) implement safety measures to prevent accident.
• Project Manager shall be informed of the location & duration via a written request at least 1 day before the hot work is done.
• One fire extinguisher must kept at the place of hot work.
• Gas cutting set must have pressure gauge attached with regulator, one for inside pressure and second one for pressure in hosepipe.
• Hose pipe must be clamped with proper clamp.
• Flash back arrester must be provided at both cylinder end and torch end.
• Welding set must have local isolator
• Welding set must be enclosed in a case. Ladders
• Ladders used on site shall be aluminum ladders and to have slip-resistant bases and defect free.
• Inspection of all ladders must be carried out.
• A ladder is considered damaged if it has broken rungs, missing steps or other construction defects.
• Do not stand on on the top two steps of a ladder as it can become unstable. Use ladder of the correct height. Ask for help when in doubt.
• Proper inclination of ladder in ratio of “4:1 = vertical height : horizontal base” is to be maintained.
• Ladders are placed with a secure footing , or they are locked or held in position.
• Ladders used to gain access to a roof or other area extend al least one meter above the top point of the support.
• For temporary work at height use A type aluminum ladder, held on both foot by a worker. Scaffoldings
• Scaffolding erection should be in accordance with the manufacturer’s or supplier’s recommendations.
• Experienced, competent persons should only carry out scaffolding erection.
• The ratio of the minimum base dimension to the height of the working platform should not exceed 1:3 in external use and 1:3.5 in internal use, unless the scaffold is secured to another permanent structure al all times.
• Freestanding scaffolds should not be used above 9.75 m unless tied. The maximum height when tied should not exceed 12m.
• A safe means of access should be provided at the end of the scaffold. This can be a vertical ladder attached internally, by internal stairways, or by ladder sections designed to form part of the frame members. It is not acceptable to climb frame members not designed for the purpose.
• Guardrails, toe-boards or other appropriate means should be provided to prevent the falls of workers and / or materials.
• Trapdoors should be provided in working platforms where internal access is provided.
• Mobile scaffold towers should never be moved while people are still on the platform. This is a significant cause of accidents.
• Ladders or stepladders should not be placed on the top of the platform to gain extra working height. Manual handling
Action to be avoided that may cause manual handling injuries are:-
• Work involving sudden, jerky or hard to control movements or which causes discomfort and pain;
• Work involving too much bending, reaching or twisting;
• Work where a long time is spent holding the same posture or position;
• Work that is fast and repetitious;
• Heavy weights which have to be lifted and carried manually;
• Work where force is needed to carry out a task; When Accident Happens
• When accident, incident or injury happens, all work shall be stopped immediately.
• Attend to the injured first and seek help immediately.
• First aid treatment should be provided even for the slightest injury.
• Work related accidents and injury should be reported immediately to the Project Manager at site.
• All incidents, accidents, dangerous occurrences and near misses must be investigated and reported.
• A brief initial accident report shall be submitted within 24 hours and a detailed report within 72 hours.
• Investigation shall be carried out for injury that resulted in lost working days. Investigation must be forwarded to the Project Manager.
Asbestos
• Use of Asbestos is strictly prohibited.
• If suspect of doing work that involves the removal, encapsulation, maintenance , clean up, transportation, disposal of structures that contain asbestos, must stop work immediately and inform the Project Manager.(such work shall not be undertaken by the contractors but by the Landlord).
Wastes
• All wastes generated as a result of the contract must be removed on a daily or weekly basis. Inform the Project Manager on site when there are hazardous or contaminated wastes to be removed.
ADMINISTRATION & WORKSHOP
Company Name THE INDESIGN
Company Status Proprietorship
Proprietor Mr.Sumit Baradia
Registered Address 13,Noormal Lohia Lane.Kolkata.700 007.1st Floor
Mailing Address 7B, Chowringhee Terrace.Kolkata.700 020. 1st Floor
Telefax No. 91-033-24638997, 91-033-24648505
Cellular Phone No. 098301-83828
Email Address [email protected]
Website Address http://www.the_indesign.com
VAT Regd.No. 19521202083
CST Regd No. 19521202277
PAN AGOPB9179P
ESI Code No.
PF Code No.
Service Tax No.
PF No. : In compliance with the provisions of PF Act the
site man power is also engaged through following
Agencies who are registered with ESI AND PF
Well-Equipped Workshops at: 101/1, Tollygunge Road.Kolkata.700 026. Ground Floor
9B, Pratap Aditya Road.Kolkata- 700 026. Ground Floor
8/9, Tiljala Road.Kolkata-700 046. 1st Floor
41, Abdul Halim Lane.Kolkata-700 016. Ground Floor
ITCC
Civil suit/litigation/arbitration arisen, if any, in the
contracts executed including orders regarding
exclusions/expulsions of black listing if any NIL
Admistrative Office 2500 Sq.Ft.
Workshops 25000 Sq.Ft.
BANKERS
ICICI Bank Limited Branch
Address: 1A, Ashutosh Mukherjee Road, Bhowanipur,
Kolkata.700 020
AXIS Bank Limited
Branch Address: 37, Raja Subodh Mullick Road,
Garia, Kolkata.700 084
TECHNICAL & PROJECT TEAM
Name Designation Qualification Experience
Taposh Halder Purchase Officer Graduate 12 Years
Binoy Biswas Site Supervisor Diploma 12 Years
Varun Agarwal Site Supervisor Graduate 12 Years
Siddique Khan Site Supervisor Diploma 11 Years
Paritosh Sen Site Supervisor Diploma (Civil) 10 Years
Nemai Roy Factory Incharge Diploma 10 Years
Sikander Ali Engineer Diploma 09 Years
Prabir Chandra Site Supervisor Diploma 08 Years
Shibu Gorai Store Incharge Graduate 07 Years
ADMINISTRATION & FINANCE
Name Designation Qualification Experience
Santosh Agarwal Office Advisor B.E.,D.B.M 26 Years
Prodip Sen Accountants Assistant M.Com. 27 Years
Surojit Rai Accountant B.Com 15 Years
Subinoy Chakravarty Accountants Assistant Graduate 04 Years
Sudip Chandra Office Assistant Graduate 03 Years
Biswajit Adak Manager Finance B.Com 02 Years
Raju Singh Stores and Supplies Graduate 15 Years
WORK FORCE
Task Masters Strength
Carpenters 50
Painting / Polishing Experts 80
Skilled Upholsters 15
Semi-skilled Workers 30
WORKSHOP EQUIPMENT
Machinery & Tools Numbers
Motorized Cutter (Automatic) 4
Planer Machine for Wood Shaving 6
Air Compressor 6
Hammer Drill 8
Drilling Machine 15
Table Cutter 5
Sand Filling Machine 3
Other Machinery (Procurement on hire basis) As per Specific requirement.
SUB CONTRACTORS
Nature of Work Contractor Years with Firm
Wood Work Prankrishna Das 12
Wood Work Kesto Das 10
Wood Work Dhiren Mistry 10
Wood Work Nathu lal Sharma 5
False Ceiling & POP Ram Baran Pandit 10
False Ceiling & POP Subodh Pandit 10
False Ceiling & POP Mafuss Khan 10
False Ceiling & POP Babu Prasad Yadav 8
Electrical Work Anjani Singh 6
Electrical Work Ashok Bannerjee 2
Electrical Work Maity Da 1
Electrical Work Swapan Bose 3
Glazing Bhagwati Glass 10
Glazing S.G Traders 10
Blinds MAC 5
Plumbing Works Md. Karim 10
Civil, AC, Fire, Safety
Access, Control,
Modular Furniture,
Aluminum Works etc As Per Project Requirement
Profile VectorPeriod Name of the Client Value of Work Duration Scope of Work Architect/Interior Designer/Project Manager
1992 1) I.T.C. 32 Lacs 105 Days Doors,Windows C.R.Narayan Rao & Associates Bougan Villa Kitchen Cabinet
& Wardobe
2) Martin Burn Ltd. 32 Lacs 120 days -- DO-- Sanon Sen & Associates, Kol.
3) Windsor Manor 110 Lacs 4 Months Guest Room,Suit Kiran Ptki-Mumbai Shareton Tower Room,Dumpuk(Started in July'92) Resi,Lift,Lobby
Conference RoomAtrium Toilets
1993 1) Windsor Manor 25 Lacs 2 Months Doors,Windows M/s. Gouri Ghosh & AssociatesShereton TowersCompleted in Jan'93Bangalare(Started inJuly'92 & Completedin Jan'93)
2) Mourya Sheraton 62 Lacs 150 Days Guest Room Mrs.Fransiska London& Towers,Delhi
3) Oberoi Cecil, Simla 60 Lacs 180 Days Total Wood Work P.G.Patki & AssociatesUnder Martin Burn Mumbai & M/s.Mansara, Delhi
1994 1) Uni Metal Alloy Ltd. 40 Lacs 120 Days Total Office Interiors In House DesigningKolkata
2) Park Avenue- 60 Lacs 130 Days Show Room Designing Mr.ThakkarHowrah(RaymondsShow Room)
3) Kali (Largest 25 Lacs 120 Days Show Room Mr. Arjun Mangal Dass-BangaloreBoutique in Kolkata
1995 1) Hotel Kakatya- 50 Lacs 180 Days Guest Room Mrs.Fransiska-London,Hyderabad(I.T.C. Mr.sarabjit Singh & Mrs.SonaliWel Come Group) Verma, Delhi
2) B.M.Birla Heart 40 Lacs 180 Days Conference Room M/s. Gouri Ghosh & AssociatesResearch Centre, reception, Gift & Mrs. Sangita KapoorKolkata Shop & All Loose
Furniturs as per Requirement
3) I.B.P.Ltd.-Kolkata 155 Lacs 240 Days Main Conference M/s. Dulal Mukherjee & Asso.Order procure in May' Room, Mini Con1995 & Site Cleaned -ference Room,for work from Sept'95 Reception, &onwards Lobby, Entrance
Staircase,DespatchRoom, Main Lun-ch Room forofficers & Directo-rs Main LunchRoom for stafftotal office furniturefixed & loose for all the four floors,theUPS Room. TheComputer Room,& the total work inc-luded flooring, false flooring of computerRoom, Electricalspower,Lighting Computer wiring,Civil works etc.
19961) Siemens ltd.- 95 Lacs 150 Days reception, ReceptionKasba, Kolkata sofas, Meeting Rooms
Library, Co-operative,Despatch,Storages,Lecture Room,Conference Room,Security Room,Computer Four FloorsGypsum Board,FalseCeiling of receptionLift Lobby of all Floorssound proof partitionswith bison board etc.
2) Titan Industries Ltd- 40 lacs 120 Days ShowRooms & serv Kothari Associates Kolkata & Kolkata -ice Centre Thakkar & Associates Mumbai
Mrs.Sondha Dutta in houseHouse Designer titan Industries
3) B.M.Birla & Heart 5 lacs 30 Days Suite Room Sangita KapoorResearch CentreKolkata
1997 1) Castrol India Ltd. 130 lacs 180days Total office M/s. Dulal Mukherjee & Asso.
on tourn key Kolkata
2) I.S.I. International 68 lacs 90 days Total guest House M/s. Dulal Mukherjee & Asso.Guest House on turn key Kolkata
1998 1) Monarch Biscuits 30 lacs 60 days Total Office Our own DesignKolkata
2) Sona Biscuits 20 lacs 45 days Total Office Our own Design
3) B.O.C.Ltd. 36lacs 60days Flooring Mrs.Rachana Gupta, KolkataKolkata
1999 1) MANNARA 40 lacs 60 days Toura key basis Mrs. Seema SanonKolkata total showroom & Associates, Kolkata
2) Taj Coromondal 72 lacs 60 days Flooring,Cleling Leeber CooperChennai Furnitures California,U.S.A.
3) Taj Coromondal 30 lacs 30 days Banquet Hall Mrs.Sujata ShankarChennai Chennai
4) Bagrati Biscuits 40 lacs 45days Total office Our own DesignKolkata
2000 1) Hyundai Motors Ltd. 36 lacs 45 days Flooring,Cleling Mr.C.R.Narayana RaoSriperumbudur, Furniture of chairmans ChennaiChenai office
2) Chholla Sherraton 30lacs 30 days Burnah Teakwood Bankok DesignerHotal,Chenai Furniture for
Swming Pool
3) Himadri Chemical 86 lacks 180 days Recidance 4 floors Mr.Bipradip Dhar, & Industries Flooring,Cleling Mr.Bhola Roy,Kolkata Furnitures Complite Mr.Shantanu Dutta
2001 1)Himadri Chemical 86 lacks 180 days Recidance 4 floors Mr.Bipradip Dhar, & Industries Flooring,Cleling Mr.Bhola Roy,Kolkata Furnitures Complite Mr.Shantanu Dutta
2) Indian Plastic 20 lacs 60 days Flooring,Cleling Mrs.Rachna Gupta, KolkataFredaration ,Kolkata Electrical,. Furnitures
3) Mr.Rajesh Saboo's 28 lacs 120 days Ceiling, electrical, Rachna Gupta, Kolkataresidence furnituresSaboo computer pvt.ltd.Kolkata
4)Computer Associa- 26 lacs 60 days Fooring, Ceiling Our own Design
tion of Eastern india Electricals, Furnitures(Compass) Kolkata
5) Lalani Computers 22 lacs 60days Fooring, Ceiling Our own DesignPvt.ltd Electricals, Furnitures J.K.BrothersResidence
7) I.T.C.Sonar Bangla 30 lacs 30 days 3Mocknp Rooms Miss Millean, SingaporeLobby Furniture
2002 1)National Plastic Pvt. 45 lacs 60 days Fooring, Ceiling Our own Designltd. Electricals, FurnituresKolkata Total Office
2)National Plastic Pvt. 65 lacs 180 days Residence on town key Our own Designltd.Kolkata
3) Haritage School 60 lacs 60 days Class room,Furniture Our own DesignKolkata & Office
4) J.P.Agarwal 40lacs 90 days Fooring, Ceiling Our own DesignIndustrialist Electricals, Furnitures
2003 1)B.C.Jain Jewellers 60 lasc 120 days Tournkey Project Mr.Bipradip DharKolkata
2)Sawan Sukha 30 lacs 60 days Tournkey Project Mr.Bipradip DharJewellers,Kolkata
3)Hall Mark 30 lacs 60 days Tournkey Project Mr.Bipradip DharElgin Road,kolkata
4)Merlene Residency 40 lacs 180 days Wood work Architects DesignKolkata
2004 1)Hindusthan National 60 lacs 60 days Loose Furnitures Our own DesignGlass ltd.Bahadurgarh &Rishra guest house
2) Lari House, 80 lacs 180days Tournkey basis Mrs.Seema SanonKathmandu total Bunglow Kolkata
3) N.K.Surana 40 lacs 60 days Total Resident Mrs.Monika BhargavResident, Kolkata Kolkata
4) Saurav`s Food Mast 20 lacs 30 days loose Loose furnitures Mr.Kapil Bhalla
Kolkata Mumbai
5) Mr. Promode Baid 20 lacs 60 days Total office Our own Design& AssociatesKolkata
6)Bhagat House 90 lacs 6 months Total Interior Mr. Komal PeriwalMr.S.BhagatBanglow 17,RowlandRoad
2005 1)Himadri Chemical & 60 lacs 220 days Fooring, Ceiling Mr.Soumak Gupta &Industries ltd. Electricals, Furnitures Mrs.Monika Bhargavkolkata cte. Completion
2) Mr.Raj Kumar 46 lacs Fooring, Ceiling Our own DesignKejrival, Bhagalpure 60 days Electricals, Furnitures
3) Mr.Pradeep Agarwal 30 lacs 60 days Electricals, Furnitures Mrs.Rupande Saha & Kolkata Associates
4) Mr.Sameer Agarwal 32 lacs 60 days only Furnitures Mrs.Rupande Saha & Kolkata Associates
5) Mr.Mani Sethia 26 lacs Residency Door window furnitures Our own DesignCuttak 60 days
6)Mr.Bansal 25 lacs 60 days Fooring, Ceiling Our own DesignKolkata Electricals, Furnitures
7) S.L.Bardia 10 lacs 35 days Ceiling,Residence, Our own Designkolkata Electricals, Furnitures
8) Jewllery Showroom 36 lacs 60 days Fooring, Ceiling Mr.Bipradip DharPark Street Electricals, Furnitures
9) Mr.P.Baid 48 lacs 60 days Tournkey Mr.Subrata RoyKolkata
10) Agarwal House 1.5 crore 6months Wooden Furnitures Mr.Sunil TainwalaMr.R.Agarwal & Buliding Doors &Banglow,White house Window17,Alipore
11) Pantaloon 20 lacs 15Days Total Interior & Wooden IdiomGariahat Furnitures Benglore
12) Pantaloon 20 lacs 20Days Total Interior & Wooden IdiomCamac Street Furnitures Bangalore
13) Reliance India Ltd. 15 lacs 2 months Office,Panelling, In house design
14) Saurav's 10 lacs 1 month Loose furnitures Kapil Bhalla,Mumbai
2006 1)Blue Star Ltd. 66 lacs. 6 months Flooring (material supplied Mr. Vinod Chaddhaby Co),Ceiling ,Furnitures,Painting
2)M.V.Paramahans 36 lacs 4 months Bedrooms , Corridor etc Mr. Vivek RathoreShip Cruis with 32 BedRooms.
3) Little ItalyItalian Resturent 65 lacs 6 months Flooring, Ceiling, Painting, Mr. Vivek Rathore
Furnitures, electricals
4) Mr. Naik 89 lacs 8 months Flooring, Ceiling, Painting, Mr. Subrata RoyResidence of 7000 sqft Furnitures, electricalsAlipore
2007 1)Gujrat Ambuja 37 lacs 5 weeks Flooring, Ceiling, Painting, Mr. Vivek RathoreCement Ltd, Furnitures, electricalsFarakka Unit Office
2) Neotia Elbit Hospital 26 lacs 6 weeks Flooring, Ceiling, Painting, Mr. Vivek RathoreVentures Ltd. Furnitures, electricalsViswakarma Building
3) Kamal Baid 26 lacs. 3 months Flooring, Ceiling, Painting, Mr. Bipradeep DharJewellary Showroom Furnitures, electricals
4) 2 nos Office in 24 lacs 3 months Turnkey In house design5,Mango Lane
5) Lenovo 45 lacs 3 months Turnkey ICON Consultants,BangalorePark Street
6) Bhartia Axa 21 lacs 4weeks Electrical,FAS and HVAC Worksphere Architects,MumbaiSiliguri
2008 1) Bharati Axa 15 lacs 3 weeks Electrical,FAS and HVAC Worksphere Architects, MumbaiHowrah
2) Maxworth Fintrade Pvt. Ltd. 1.46 Crores 3 months Fooring, Ceiling In house designKolkata Electricals, Furnitures
cte. Completion
3) Navsoft Asia Pacific Head-Office 85 lacs 2 months Fooring, Ceiling In house designKolkata Electricals, Furnitures
cte. Completion
4) Kankani Constructions Pvt. Ltd 1.28 Crores 6 Months Turnkey Basis In house design
5) Navsoft B.P.O 80 lac 4 Months Fooring, Ceiling In house designElectricals, Furnitures
6) Fidelity International Enlisted as vendors April onwards Adrianse Group, Delhi
2009 1) Pantaloon Retail (India) Limited 15 Lac Work In Progress Fooring, Ceiling In house designElectricals, Furniturescte. Completion
2) Ekta Heights 2.28 Crores Work In Progress Full Complex Marble Work Mr. Bipradeep Dhar
3) Raj Furniture 60 Lacs 5 Weeks Electrical & Smoke Detection Mr. Bipradeep Dhar
4) Bhikaram Chandmal Bhujiawala 1.05 Crores 6 Months 6 Showroom full Complete Work Mr. Soumya Roy
2010 1) Raj Kumar More 96 Lacs 4 Months Fooring, Ceiling In house designResident 8000 Sq. feet Electricals, Furnitures
cte. Completion
2) Salasar Enterprises Pvt. Ltd. 78 Lacs 3 Months Net Working, Electrical, Furniture Rajesh Jain
3) IBM India Pvt. Ltd. 65 Lacs 4 Months Fooring, Ceiling Jones Lang Lasalle Property Consultants India Pvt. LtdDLF Building Electricals, Furnitures
cte. Completion
4) IBM India Daksh Pvt. Ltd. 58 Lacs 3 MonthsMillinium City Flooring, Ceiling, Painting, Jones Lang Lasalle Property Consultants India Pvt. Ltd
Furnitures, electricals, AC Ducting,Fire,
5) IBM India Pvt. Ltd. 19.5 Lacs 1 Months Flooring, Ceiling, Painting, Jones Lang Lasalle Property Consultants India Pvt. LtdCamac Street Furnitures, electricals.
6) IBM India Pvt. Ltd. 1.02 Crores 8 Months Flooring, Ceiling, Painting, Jones Lang Lasalle Property Consultants India Pvt. LtdBCS Building Furnitures, electricals, AC Ducting,
Fire,Grill & 5th Floor fully Completed
7) IBM India Pvt. Ltd. 53 Lacs 3 Months Electricals Jones Lang Lasalle Property Consultants India Pvt. LtdSEZ Building
20111) IBM India Pvt. Ltd. 83 Lacs Work In Progress Fooring, Ceiling, AC Ducting, Fire, Jones Lang Lasalle Property Consultants India Pvt. LtdDLF Building Electricals, Furnitures, ACP Board,
Completion
2) IBM India Daksh Pvt. Ltd. 47 Lacs Work In Progress Fooring, Ceiling, AC Ducting, Fire, Jones Lang Lasalle Property Consultants India Pvt. Ltd
Millinium City Electricals, Furnitures, ACP Board,CompletionFire,
3) IBM India Pvt. Ltd. 13 Lacs Work In Progress Flooring, Ceiling, Painting, Jones Lang Lasalle Property Consultants India Pvt. LtdCamac Street Furnitures, electricals.
4) IBM India Pvt. Ltd. 93 Lacs Work In Progress Flooring, Ceiling, Painting, Jones Lang Lasalle Property Consultants India Pvt. LtdBCS Building Furnitures, electricals, AC Ducting,
Fire.
5) Microsoft Corporation India Pvt. Ltd. 14.5 Lacs 15 days Flooring, Ceiling, Painting, Jones Lang Lasalle Property Consultants India Pvt. LtdFurnitures, electricals, AC Ducting,Fire.
6) Forum Mall Management Services Pvt. Ltd. 12 Lacs 12 days AC Ducting Satyam Refrigeration
7) Accenture Services Pvt. Ltd. 22 Lacs Work In Progress Flooring, Ceiling, Painting, Jones Lang Lasalle Property Consultants India Pvt. LtdFurnitures, electricals, AC Ducting,Fire, Indoor Plants Maintaince
8) Accenture Services Pvt. Ltd. 2 Lacs Work In Progress Flooring, Ceiling, Painting, Accenture Services Pvt. Ltd.
9) Wipro GE Healthcare 8.5 Lacs Work In Progress Flooring, Ceiling, Painting, Soumya RoyFurnitures, electricals, AC Ducting,
10) Lloyd Electric & Engineering Ltd. 6 Lacs Work In Progress Flooring, Ceiling, Painting,Furnitures, electricals. Soumya Roy
11) Visaka Industries Ltd. 3 Lacs Work In Progress Flooring, Ceiling, Painting, Soumya RoyFurnitures, electricals.
12) Bangla Entertainment Pvt. Ltd. 35 Lacs 45 days Flooring, Ceiling, Painting, Sony Entertainment ChannelFurnitures, electricals, AC Ducting,Fire.
13) Kasturi Hotel & Restaurant 53 Lacs Work In Progress Flooring, Ceiling, Painting, Soumya RoyFurnitures, electricals, AC Ducting,Fire.