Transcript of The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and...
![Page 1: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/1.jpg)
The Garwin-Matisoo Vision After 45 YearsElectric Power Via Superconducting Cables: Economic and Environment Issues
Paul Michael Grant
Principal, W2AGZ Technologies
Visiting Scholar, Stanford (2005-2008)EPRI Science Fellow (retired)
IBM Research Staff Member [email protected]
www.w2agz.com-----------------------------------------------------------------------------------------
Brainstorming WorkshopTransporting Tens of Gigawatts of Green Power to the Market
12-13 May 2011IASS, Potsdam, Germany
![Page 2: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/2.jpg)
Friedrich Wilhelm von Steuben
The Germans in America
Frederick Muhlenberg
Taught the Rebels how to fight!
First US Speaker of the House…aka in Europe as “Prime
Minister”
![Page 3: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/3.jpg)
Discovery Anniversaries100 25
1911 (4.2 K)
Gilles Holst Georg Bednorz
H. Kammerlingh-Onnes Alex Mueller
1986 (20-40 K)
![Page 4: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/4.jpg)
![Page 5: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/5.jpg)
1. Wires & Films 2. Medical Imaging 3. High Energy Physics
4. Rotating Machinery 5. Dark Matter
![Page 6: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/6.jpg)
Some Axioms of History• There is nothing new under the sun
Ecclesiastes 1:9-14 • What’s past is prologue
The Tempest, by Bill S.
• Those who cannot remember the past are bound to repeat it George Santayana
• When I was a boy of 14, my father was so ignorant I could hardly stand to have the old man around. But when I got to be 21, I was astonished at how much the old man had learned in seven years Mark Twain
![Page 7: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/7.jpg)
PrologueEngland, 1966
![Page 8: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/8.jpg)
Submitted 28 February 1966
• ac Cables: 760 MVA (3), 275 kV, 1600 A– Be 77 K– Al 20 K– Nb 4 K (a “soft” superconductor!)
• Objective: Efficiency, not increased capacity!
![Page 9: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/9.jpg)
Wheeling Watts into Central London More Efficiently
![Page 10: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/10.jpg)
Cable Properties
Metal T (K) (×cm)
Outer Diameter
(cm)
Loss (W/km)
Cu 340 210-6 6.0 46,500
Be 77 210-8 6.0 460
Al 20 310-9 6.0 470
Nb 4 0 10.4 0
HC1 = 0.16 TFault I = 40 kA
Operating I = 1.6 kASurface H = 7 mT
![Page 11: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/11.jpg)
Cost of “Extra” Generation to Offset I2R Losses (CEGB, 1965): 220 £/kw
Note: A Perfect Conductor is not Absolutely Required!
![Page 12: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/12.jpg)
Wilkinson’s Conclusion (1966)• “...only niobium has any hope of defraying its
refrigeration costs by savings in conductor material” (True, but not by much…)
• “But its impracticably large core diameter” (10.4 cm rules out Type I superconductors) (True, even today…)
• A Type II superconductor with JC = 106 A/cm2 at a diameter of 6 cm would quench under a fault current of 40 kA (Hoy, no hay problema con HTSC)
• “Such a hazard is clearly unacceptable.” (Entonces solamente ayer avec LTSC!)
![Page 13: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/13.jpg)
Garwin-MatisooUSA, 1967
![Page 14: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/14.jpg)
Submitted 24 June 1966
Rationale: Huge growth in generation and consumption in the 1950s; cost of transportation of coal; necessity to locate coal and nuke plants far from load centers.
Furthermore, the utilities have recently become aware of the advantages of power pooling. By tying together formerly independent power systems they can save in reserve capacity (particularly if the systems are in different regions of the country), because peak loads, for example, occur at different times of day, or in different seasons. To take advantage of these possible economies, facilities must exist for the transmission of very large blocks of electrical energy over long distances at reasonable cost.
![Page 15: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/15.jpg)
Specs
• LHe cooled
• Nb3Sn (TC = 18 K)
– JC = 200 kA/cm2
– H* = 10 T
• Capacity = 100 GW– +/- 100 kV dc– 500 kA
• Length = 1000 km
![Page 16: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/16.jpg)
• Refrigeration Spacing 20 km
• G-L Separator Distance 50 m
• Booster Pump Intervals 500 m
• Vacuum Pump Spacing 500 m
![Page 17: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/17.jpg)
*2006 costs relative to 1966 are estimated from the Bureau of Labor Statistics table of annual Consumer Price Indices that can be found at ftp://ftp.bls.gov/pub/special.requests/cpi/cpiai.txt. The 2006/1966 ratio used above is 6.19. The YE2010 costs would be about 8% higher that YE2006.
5390
![Page 18: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/18.jpg)
Additional LTSC Cables(1975-1985)
![Page 19: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/19.jpg)
Graz, Austria – Late 70s
![Page 20: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/20.jpg)
Brookhaven – Late 70s, Early 80s
![Page 21: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/21.jpg)
LANL dc Cable
![Page 22: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/22.jpg)
The HTSC EraWires & Cables
![Page 23: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/23.jpg)
First HTSC “Wire”
Oxide Powder1. Powder
Preparation
A. ExtrusionB. Wire Draw
C. RollingDeformation& Processing
3.
Oxidation -Heat Treat
4.
Billet Packing& Sealing
2.
Oxide Powder1. Powder
Preparation
A. ExtrusionB. Wire Draw
C. RollingDeformation& Processing
3.
Oxidation -Heat Treat
4.
Billet Packing& Sealing
2.
Oxide Powder1. Powder
Preparation
A. ExtrusionB. Wire Draw
C. RollingDeformation& Processing
3.
Oxidation -Heat TreatOxidation -Heat Treat
4.
Billet Packing& Sealing
2.
Gen 1
![Page 24: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/24.jpg)
Gen II Coated Conductor
American Superconductor SuperPower
![Page 25: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/25.jpg)
Various ac HTSC Cable Designs
Sumitomo
Ultera-ORNL
Nexans-AMSC
Pirelli
![Page 26: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/26.jpg)
Various dc HTSC Cable Designs
EPRI: Schoenung, Hassenzahl, Grant (1997) +/- 50 kV, 50 kA, 5 GWBICC: Beales, et. al, (1995)
40 K, +/- 20 kV, 10 kA, 400 MW
EPRI: Hassenzahl, Gregory, Eckroad, Nilsson, Daneshpooy, Grant (2009) +/- 50 kV, 100 kA, 10 GW
![Page 27: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/27.jpg)
A Superconducting dc CableEPRI Report 1020458 (2009)
Hassenzahl, Gregory, Eckroad, Nilsson, Daneshpooy, Grant
Monopole Specs
100-kV, 100-kA, 10-GW66 K < T< 69 K
See Also: Hassenzahl, Eckroad, Grant, Gregory, Nilsson, IEEE Trans. Appl. Supercon. 19, 1756 (2009)
Stay tuned for Steve’s upcoming talk…then go build it!
![Page 28: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/28.jpg)
US HTSC Cable Demonstrations
![Page 29: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/29.jpg)
HTSC Cable Demonstration Projects WorldwidePast, Present…Future?
?
![Page 30: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/30.jpg)
US Department of EnergyBudget of the Office of Electricity Delivery
and Energy Reliability: FY 2010-11 (103 USD)
? ?
WOW ! “Obama Cash”
![Page 31: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/31.jpg)
HTSC Cables- Deployment Opportunities -
![Page 32: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/32.jpg)
The US Transmission Grid(s)• 300,000 km
• 500 companies• 10% Losses
![Page 33: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/33.jpg)
NERC Interconnects
Source: DOE 2006 National Electric Transmission Study
![Page 34: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/34.jpg)
Pacific Intertie• HVDC, +/- 500 kV, 3.1 kA, 3.1 GW• 1,362 km• ~50% of LA Power Consumption • Converter/Inverter Losses ~ 5%• Ohmic Losses ~10%
Celilo I/C Station“A Mountain of Silicon”
![Page 35: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/35.jpg)
North American HVDC
![Page 36: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/36.jpg)
The “Green” Energy Economy
![Page 37: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/37.jpg)
www.sunzia.net
![Page 38: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/38.jpg)
Clovis, NM
“Three Girl Friends”
![Page 39: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/39.jpg)
1250 Miles
4 GW
460 Miles
500 kV
![Page 40: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/40.jpg)
![Page 41: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/41.jpg)
HTSC Cables- Deployment Realities -
![Page 42: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/42.jpg)
• Will TA go forward using superconducting cables?
• Uncertainties:o ERCOT?o Renewables?o Silicon City?
Filled up with VSC’s
![Page 43: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/43.jpg)
A Modest Proposal*-”Upbraiding” the Utilities-
• More than a half-century of successful demonstrations/prototyping power applications of superconductivity (1950s - > “beyond” 2000, in Japan and US…and elsewhere)…low- and high-Tc…now sitting “on the shelf.”
• Why aren’t they “in the field” today?• Is their absence due to…
– Cost?– Hassle?– or “lack of compelling” need?– or “all of the above?”
*Apologies to Jonathon Swift
![Page 44: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/44.jpg)
• US utilities have long claimed to “want”…– Efficient long-length cables– Oil-free transformers– Energy Storage– Fast fault current limiters at high voltage (FCLs)– Efficient rotating machinery (aka, motors and generators)
• Well, we got ‘em. Utilities claim:– They’re too high-cost, because,
• The wire is too expensive.• They have to be kept too cold.• Electricity is cheap, and “in field” energy efficiency is not a
“compelling” driver
– Anyway, we can solve our needs by incrementally improving the “old” ways (don’t ever underestimate the ingenuity of a utility engineer to improvise, adopt and adapt)
![Page 45: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/45.jpg)
Hence, “my modest proposal”
• If the “cost” of the wire in any given application were to be “zero,”…
• Would the utilities then “buy them?” And sign a “letter of intent” to purchase “x” number?– e.g., Fault Current Limiters, for which US utilities have
long claimed a need
• “Zero cost” would be obtained as a Federal or State “tax credit” for the wire cost of the quantity purchased by the utility equipment vendor or the utility itself…
• Well?
![Page 46: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/46.jpg)
HTSC Cables- SuperCables -
![Page 47: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/47.jpg)
“Hydricity” SuperCables:“Proton/Electron Power (PEP) to the
People”
+v I-v
I
H2 H2
Circuit #1 +v I-v
I
H2 H2
Circuit #2
Multiple circuitscan be laid in single trench
![Page 48: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/48.jpg)
LH2 SuperCable
HV Insulation
“Super-Insulation”
Superconductor
Hydrogen
DO
DH2
tsc
Roughly to Scale:• Overall 30 cm Diameter
![Page 49: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/49.jpg)
Supercritical H2 SuperCable
Electrical Insulation
“Super-Insulation”
Superconductor
Supercritical Hydrogen @ 77 K1000 – 7000 psia
Liquid Nitrogen @ 77 K
![Page 50: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/50.jpg)
Electrical Insulation
“Super-Insulation”
Superconductor
LNG @ 105 K1 atm (14.7 psia)
Liquid Nitrogen @ 77 K
Thermal Barrier to
LNG
LNG SuperCableDesign for eventual conversion to high pressure cold or liquid H2
![Page 51: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/51.jpg)
Hg-1223 !
…funded by EPRI
![Page 52: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/52.jpg)
HTSC Cables- MegaProjects -
![Page 53: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/53.jpg)
The Next American Big-Bang-a-TronBob WilsonBill FosterPeter LimonErnie Malamud
The Pipetron…Stay tuned for Lance Cooley’s Talk This Afternoon!
![Page 54: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/54.jpg)
Powering the Middle East- “The e-Pipe” – The Ultimate
Vision!
Concept:
• Wellhead generation by natural gas in Qatar• Transport power via HTSC cable to the Levant
Specifications:
• 1610 km• 50 kA, +/- 50 kV• 5 GW• 1.3 x Pacific Intertie !
See EPRI Report WO8065-12 (1997)
![Page 55: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/55.jpg)
A Canadian’s View of the World
![Page 56: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/56.jpg)
The Mackenzie Valley Pipeline
1220 km18 GW-thermal
2006 - 2010
http://www.mackenziegasproject.com
![Page 57: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/57.jpg)
![Page 58: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/58.jpg)
Electricity Conversion AssumptionsWellhead Power Capacity 18 GW (HHV)
Fraction Making Electricity 33%
Thermal Power Consumed 6 GW (HHV)
Left to Transmit as LNG 12 GW (HHV)
CCGT Efficiency 60%
Electricity Output 3.6 GW (+/- 18 kV, 100 kA)
SuperCable Parameters for LNG Transport
0.35 m (14 in)Effective Pipe Diameter
0.1 m2Effective Pipe Cross-section
0.53 m3/s @ 5.3 m/sLNG Volume Flow
440 kg/m3LNG Density (100 K)
230 kg/s @ 5.3 m/sCH4 Mass Flow (12 GW (HHV))
Wellhead LNG + Electricity MVP Scenario
![Page 59: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/59.jpg)
It’s 2030• The Gas runs out!• We have built the LNG SuperCable
years before• Put HTCGR Nukes on the now empty gas
fields to make hydrogen and electricity (some of the electricity infrastructure, e.g., I/C stations, already in place)
• Enable the pre-engineered hydrogen capabilities of the LNG SuperCable to now transport protons and electrons.
![Page 60: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/60.jpg)
SuperCities & SuperGrids• Nuclear Power can
generate both electricity and hydrogen – “Hydricity”
• Hydricity can be distributed in underground pipelines like natural gas
• The infrastructure can take the form of a SuperGrid
• …or aSuperCity
SupermarketSchool Home
Family Car
DNA-to-order.com
Nuclearplant
H2
H2
HTSC/MgB2
SupermarketSchool Home
Family Car
DNA-to-order.com
Nuclearplant
H2
H2
HTSC/MgB2 Grant, Starr, Overbye, SciAm, July 2006
![Page 61: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/61.jpg)
SuperSuburbSuperSuburb
Households: 300,000Electricity: 1800 MWHydrogen: 800 MW
SuperNukeelectrons + protons
=> 2600 MW
~ “San J ose” ~ “Diablo Canyon”
250 km
SuperCableVoltage: +/ - 20 kVCurrent: 45 kAH2 Storage: 28 GWhH2 Flow: 2 m/s
SuperSuburbHouseholds: 300,000Electricity: 1800 MWHydrogen: 800 MW
SuperNukeelectrons + protons
=> 2600 MW
~ “San J ose” ~ “Diablo Canyon”
250 km
SuperCableVoltage: +/ - 20 kVCurrent: 45 kAH2 Storage: 28 GWhH2 Flow: 2 m/s => 6.8 kg/s
SuperSuburbHouseholds: 300,000Electricity: 1800 MWHydrogen: 800 MW
SuperNukeelectrons + protons
=> 2600 MW
~ “San J ose” ~ “Diablo Canyon”
250 km
SuperCableVoltage: +/ - 20 kVCurrent: 45 kAH2 Storage: 28 GWhH2 Flow: 2 m/s
SuperSuburbHouseholds: 300,000Electricity: 1800 MWHydrogen: 800 MW
SuperNukeelectrons + protons
=> 2600 MW
~ “San J ose” ~ “Diablo Canyon”
250 km
SuperCableVoltage: +/ - 20 kVCurrent: 45 kAH2 Storage: 28 GWhH2 Flow: 2 m/s
SuperSuburbHouseholds: 300,000Electricity: 1800 MWHydrogen: 800 MW
SuperNukeelectrons + protons
=> 2600 MW
~ “San J ose” ~ “Diablo Canyon”
250 km
SuperCableVoltage: +/ - 20 kVCurrent: 45 kAH2 Storage: 28 GWhH2 Flow: 2 m/s => 6.8 kg/s
“Grant Equivalent Households”
![Page 62: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/62.jpg)
Wind Power Factoids
1 mileKashiwazaki Kariwa: 8 GW !
KK Wind Equivalent (8 GW)
• Power per Tower 8 MW
• Number of Towers 1000
• Inter-tower Distance 1000 ft
• Total Area (miles x miles) 43.5 x 43.5
![Page 63: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/63.jpg)
Diablo Canyon
![Page 64: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/64.jpg)
My Virtual Grandfather (@ 94)
![Page 65: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/65.jpg)
SuperTies- “Hotel California” -
![Page 66: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/66.jpg)
“Paired Californias”(Garwin-Matisoo Reborn)
EPRI Report 1013204 (2006)
![Page 67: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/67.jpg)
![Page 68: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/68.jpg)
![Page 69: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/69.jpg)
“Difference between Day and Night”
-8000
-6000
-4000
-2000
0
2000
4000
6000
8000
1 3 5 7 9 11 13 15 17 19 21 23
Hour of the Day (East Coast Time)
MW
DI/dt = 10 A/s
![Page 70: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/70.jpg)
“Sanity Check”
• Worst Case: Assume a “toleration loss” no larger than 1 W/m, then the entire SuperTie could be reversed in only 2 hours.
• The “fastest” change would be ~ 10 A/s between 5 and 6 PM EST. Compare with 1% ripple on 100 kA at the 6th harmonic of 60 Hz which is 720,000 A/s!
![Page 71: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/71.jpg)
5000 km SuperTie Economics
Cost of Electricity ($/kWh)
Line Losses in
Conventional Transmission
(%)
Annual Value of Losses on
10 GW Transmission Line @ 50%
Capacity (M$)
Additional Capital Costs for HTSC and Refrigeration
(M$)
FRB Discount Rate (%)
Period for ROI (Years)
0.05 5 % 110 52,574 5.5 % 62
Base Assumption: C/P “Gen X” = $50/kA×m
“Deregulated Electricity” will not underwrite this ROI, only a “public
interest” investment analogous to the Interstate Highway system makes sense
![Page 72: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/72.jpg)
Possible SuperTie Enablers
• Active public policy driving energy efficiency
• Carbon tax
• Tariff revenue from IPPs accruing from massive diurnal/inter-RTO power transactions
![Page 73: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/73.jpg)
Physics World, October 2009
…a future editor ofNature…?
![Page 74: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/74.jpg)
Some Other Axioms of History
• History is more or less bunk Henry Ford
• I can’t think about tomorrow...I’m as lost as yesterday Tomorrow, by Bob Seger
• If I’m not smart enough to solve it (a problem), neither is anyone else! Anon.
![Page 75: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/75.jpg)
Superconductors - The Long Road Ahead –
Foner & Orlando (1988)
“Widespread use of these [high temperature] superconducting technologies will have far more to do
with questions of public policy and
economics than with the nature of the new materials.”
![Page 76: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/76.jpg)
“You can’t always get what you want…”
![Page 77: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/77.jpg)
“…you get what you need!”
![Page 78: The Garwin-Matisoo Vision After 45 Years Electric Power Via Superconducting Cables: Economic and Environment Issues Paul Michael Grant Principal, W2AGZ.](https://reader031.fdocuments.net/reader031/viewer/2022013004/56649e255503460f94b1501a/html5/thumbnails/78.jpg)