![Page 1: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/1.jpg)
The Four Pillars of PlumbingHow Switzerland reassesses the profession’s training requirements
Case study: apprenticeship
![Page 2: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/2.jpg)
suissetec
▫ Industry and employers' association
▫ Includes organisations from these areas - Metal roofing/building shell- Heating- Air conditioning- Ventilation- Cooling/chilling- Plumbing/water/gas
▫ Represents all the steps in the value-added chain, i.e. manufacturers, suppliers, planners and builders
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 2
![Page 3: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/3.jpg)
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 3
Burj Khalifa Burj al Arab
Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec)
![Page 4: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/4.jpg)
suissetec
membersNon-members Total
Number of
companies3,300 3,000 6,300
Number of
salaried
employees / subj.
to collective
agreements
32,500 6,500 39,000
Annual turnover
builders/plannersCHF 6.2 billion CHF 2.7 billion* CHF 8.9 billion*
Number of
employees per
company 9 - 10 2 - 3
Number of
apprentices5,600 1,000 6,600
Key figures for Switzerland
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 4
* = estimate/sources: survey of suissetec member services / Swiss Federal Statistical Office
![Page 5: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/5.jpg)
Swiss vocational education and professional training system (VPET)
![Page 6: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/6.jpg)
The Swiss education and training system
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 6
Upper-secondary level
vocational education and
training (VET)
1 - 3 years
College/university
3 - 5 years
Vocational apprenticeship
2 - 4 years
Secondary school
4 years
Elementary school
9 years
![Page 7: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/7.jpg)
Trial apprenticeship
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 7
![Page 8: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/8.jpg)
Ability Test
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 8
![Page 9: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/9.jpg)
Apprenticeship contract
company
canton
(province)
apprentice
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 9
contract
![Page 10: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/10.jpg)
On the job training at the workplace
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 10
![Page 11: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/11.jpg)
Vocational school
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 11
![Page 12: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/12.jpg)
Industry courses
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 12
![Page 13: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/13.jpg)
Apprenticeship in Switzerland:
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 13
At work
4 days a week
Vocational education and training (VET) school
1 day a week
Industry courses
e.g. 36 days in 3 years
![Page 14: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/14.jpg)
Assessing future training requirements
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 14
![Page 15: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/15.jpg)
Why redesign training in plumbing?
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 15
Federal Vocational Education Act: mandatory examination
of requirements and reassessment every five years
Decision:redesign
![Page 16: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/16.jpg)
The key questions:
▫ What is the best approach to plumbing today?
▫ What should the training requirements be in the plumbing sector?
▫ What should the standards be?
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 16
![Page 17: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/17.jpg)
Redesign: composition of the working group
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 17
Schools Industrial training providers
Cantons(Provinces)
State Secretariat(Confederation)
Entrepreneurs Practitioners Education specialists
Examinationexperts
![Page 18: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/18.jpg)
Redesign: the process
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 18
Phase 1: Defining the basics
Develop an Activity Profile Validate the Profile among companies
Phase 2: Developing a training plan
Develop a Training and Education Plan
Develop a detailed Training and Education Plan plus teaching aids for schools, industrial courses and companies
Phase 3: Adopting the Plan in schools, industrial courses and companies
![Page 19: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/19.jpg)
Redesign:
From: Theoretical training
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 19
To: Practical training
![Page 20: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/20.jpg)
Redesign: The results
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 20
▫ The Activity Profile
▫ The Training and Education Plan
![Page 21: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/21.jpg)
The Activity Profile: an overview
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 21
Tätigkeitsbereiche
HandlungskompetenzbereicheTätigkeiten / Berufliche Handlungskompetenzen
1 2 3 4 5 6 7 8
Vorwände rückbauen Vorwände verbauen
Druckprüfung bei
Versorgungsleitungen
durchführen
Druckprüfung bei
Gasleitungen
durchführen
Druckprüfung bei
Entsorgungsleitungen
durchführen
Vorwände dämmen
Gasleitungen verbauen
Gasleitungen,
Formstücke und
Armaturen dämmen
Gasleitungen in
Betrieb nehmen
Entsorgungsleitungen,
Formstücke und
Armaturen dämmen
Entsorgungsleitungen
in Betrieb nehmen4 (d) Installieren von Entsorgungsleitungen
Entsorgungsleitungen
demontieren
Entsorgungsleitungen
vorfabrizieren
Entsorgungsleitungen
verbauen
Wasserleitungen
vorfabrizieren
Montageunterlagen
aktualisieren
Spezielle Sanitär-
Apparate montieren
Kleinlüftungsanlagen
montieren
Wartungsarbeiten
ausführen
Servicearbeiten
ausführen
Vorwände
vorfabrizieren
Solaranlagen
montieren
Wasserleitungen in
Betrieb nehmen
Wasserleitungen,
Formstücke und
Armaturen dämmen
7 (g) Durchführen von Abschlussarbeiten Abfälle trennen und
entsorgenRapporte erstellen
Dem Kunden das Werk
übergeben (inkl.
Protokoll)
Ver- und
Entsorgungsanlagen
montieren
5
( e)Installieren von Vorwandsystemen
2 (b) Installieren von Versorgungsleitungen WasserWasserleitungen
demontieren
Wasserleitungen
verbauen
3 (c) Installieren von Versorgungsleitungen GasGasleitungen
demontieren
Gasleitungen
vorfabrizieren
6
(f)Montieren von sanitären Anlagen und Apparaten
Apparate, Armaturen
und Garnituren
rückbauen
Apparate, Armaturen
und Garnituren
montieren
1 (a) Planen der Arbeiten
Einfache
Installationspläne
erstellen
Arbeitsablauf
bestimmen und
Arbeiten auf der
Baustelle absprechen
Werkstattplan erstellen Detailplan erstellen Vorwand planenArbeitsplatz einrichten
und sichern
Maschinen und
Werkzeuge unterhalten
![Page 22: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/22.jpg)
The Activity Profile: an extract
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 22
1 (a)
2 (b) Installation of Water Supply
Task Planning
removal of water pipes
devisesimpleInstallation plans
decide on process and coordinate activities on construction site
planworkshopactivities
prefabricatewater pipes
mount water pipes
1
ActivitiesArea of Activity
32
![Page 23: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/23.jpg)
The structure of the new Training and Education Plan for Plumbing
19.10.2017 Four Pillars of Plumbing Forum, Abu Dhabi National Exhibition Centre 23
Skills Area 1: Planning work tasks
Skill 1.1: Devise simple installation plans
The trainee shall be able to devise simple installation plans giving an overview of the plumbing installations planned for part of a building
or for a small building (e.g. of two apartments).
To do so, the trainee shall first obtain the requisite architects’ plans and documentation, and shall then work with the architect or another
industry specialist to determine the extent of the work required and the client’s needs.
Company performance goal(s) School performance goal(s) Industrial course performance goal(s)
1.1.1 To procure the planning documents
and further information (e.g.
equipment lists) required to devise
an installation plan
1.1.1 To interpret simple architects‘ plans
1.1.2 To interpret simple installation plans
and schematic views
1.1.1 To interpret simple installation plans
and schematic views
![Page 24: The Four Pillars of Plumbing...Burj Khalifa Burj al Arab Piping in these buildings by Georg Fischer Piping Systems (Member of suissetec) suissetec ... construction site plan workshop](https://reader035.fdocuments.net/reader035/viewer/2022070706/5e9e9218c4cd3769b430b098/html5/thumbnails/24.jpg)
Any questions?