F. Baguelin & Seng Y Ung (FONDASOL)F. Gaillard & J.P. Commun (RAZEL)
Journée franco-britannique CFMS-BGA,Paris, le 2 décembre 2011
The foundation of the new sewage plant at le Havre
An alternative solution with a preloadingembankment
Titre
![Page 2: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/2.jpg)
L’ouvrage – vue perspective
THE PLANT
2 superimposed tanks
each : ~ square 100m x 100m
6,6m of water
![Page 3: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/3.jpg)
Les 4 cyclors : vue en plan
The 4 units : cyclors A, B, C, D
101 m
90 m
![Page 4: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/4.jpg)
Bond &Harris UU London clay
pl* et la solution pieux
PILES = the initial foundation concept
360 piles mesh : 5,6mx5,6mL=40m Ø=1.4m QELS = 800 t
net limit pressure pl*
0
5
10
15
20
25
30
35
40
45
-1 0 1 2 3 4 5pl* (MPa)
dept
h z
PR1
PR2
PR3
PR4
design
1. fill
2. sand
3. sand
4. clay & peat
5. sand & gravel
![Page 5: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/5.jpg)
Bond &Harris UU London clay
pl* et la solution préchargement
The alternative solution : preloading
360 piles mesh : 5,6mx5,6mL=40m Ø=1.4m QELS = 800 t
net limit pressure pl*
0
5
10
15
20
25
30
35
40
45
-1 0 1 2 3 4 5pl* (MPa)
dept
h z
PR1
PR2
PR3
PR4
design
1. fill
2. sand
3. sand
4. clay & peat
5. sand & gravel
160 to 250 kPa
![Page 6: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/6.jpg)
T2
Plan du remblai de préchargement
THE PRELOADING EMBANKMENT
110m
125m
T1
H fill = 8m
H fill = 12.5 m
![Page 7: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/7.jpg)
Plan du remblai d’essai
THE TRIAL EMBANKMENT
H = 8 m
![Page 8: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/8.jpg)
Remblai d’essai : résultats et conclusion
THE TRIAL EMBANKMENTH= 8 m
Results
� no instability during fill construction
� in 4 months
- pore pressures dissipated
- settlements stabilised and magnitude as predicted
Conclusion : preloading possible without vertical drains in all alluvial deposits
![Page 9: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/9.jpg)
Remblai de préchargement : rés & conclusions
THE PRELOADING EMBANKMENT
Measurements
� inclinometers
� pore pressures
� multipoint tassometers
T1 & T2
� settlement profiles
Results
� no instability confirmed
� confirms quick rate of consolidation
and establishes
� time of fill removal
� degree of creep attained
� residual settlement at service
� checks settlement model
& provides settlement pattern for
structural design
![Page 10: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/10.jpg)
T1 – résultats à diverses périodes
MULTIPOINT TASSOMETER T1
-30.00
-25.00
-20.00
-15.00
-10.00
-5.00
0.00
5.00
10.00
-10 0 10 20 30 40 50 60 tassement s (cm)
cote
NG
F (
m)
24/04/2008
21/05/2008
09/07/2008
02/09/2008
![Page 11: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/11.jpg)
-30.00
-25.00
-20.00
-15.00
-10.00
-5.00
0.00
5.00
10.00
-10 0 10 20 30 40 50 60 tassement (cm)
cote
NG
F (
m)
16/04/2008
21/05/2008
09/07/2008
02/09/2008
T2 – résultats à diverses périodes
MULTIPOINT TASSOMETER T2
![Page 12: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/12.jpg)
T1 & T2 – valeurs finales
MULTIPOINT TASSOMETERS T1 & T2 – Final values
-30.00
-25.00
-20.00
-15.00
-10.00
-5.00
0.00
5.00
10.00
-10 0 10 20 30 40 50 60 tassement s (cm)
cote
NG
F (
m)
T1 (02/09/2008)
T2 (02/09/2008)
![Page 13: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/13.jpg)
-35
-30
-25
-20
-15
-10
-5
0
5
10
0 100 200 300 400 500 600 700
sigma ' v
altit
ude
sigma ' vosigma ' psigma ' v T1sigma ' v T2
Calage du POP sur T1 & T2
∆σ∆σ∆σ∆σ’p = σσσσ’p - σσσσ’v0
∆σ∆σ∆σ∆σ’p ≈ 80 kPa
CALIBRATE OVERCONSOLIDATION MARGIN ∆σ∆σ∆σ∆σ’p (POP)
![Page 14: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/14.jpg)
Calage du POP sur T1 & T2
MULTIPOINT TASSOMETERS T1 & T2 : measured & calculated settlements
-35
-30
-25
-20
-15
-10
-5
0
5
10
0 100 200 300 400 500 600 700
sigma ' v
sigma ' vosigma ' psigma ' v T1sigma ' v T2
-30
-25
-20
-15
-10
-5
0
5
10
0 100 200 300 400 500 600 700
tassement (mm)
cote
NG
F
mesure T1mesure T2calage T1calage T2
overconsolidation margin fit for settlements
![Page 15: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/15.jpg)
TASSUNI : une charge
SETTLEMENT MODEL : TASSUNI (FONDASOL software)
n rectangles i with load qi
m soil layers j with σ’p and :
- either : moduli (E, Er)
- or : compression indexes CC, CS
z
O
y
x
M Load qi on rectangle i
layer 1
layer j
layer m
Settlement si
σz(i,j) εz(i,j)
![Page 16: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/16.jpg)
TASSUNI : formules de tassement avec sig’p
EEpvz
r
vpz
'''' 00 σσσσσε
−++
−=
SETTLEMENT MODEL : TASSUNI (FONDASOL software)
n rectangles i with load qi
m soil layers j with σσσσ’pand :
- or : compression indexes CC, CS
p
zvC
v
pSZ e
C
e
C
'
'log
1'
'log
10
0 σσσ
σσ
ε ++
++
=
For example : E = EM/α & Er = 3 to 10 EM/α
- either : moduli (E, Er)
![Page 17: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/17.jpg)
TASSUNI : 13 couches de sol
TASSUNI : 13 LAYERS
![Page 18: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/18.jpg)
TASSUNI : les 13 charges et les 62 charges
TASSUNI : 13 LOADS FOR PRELOADING
![Page 19: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/19.jpg)
Les 62 charges de l’ELS q-permanentTASSUNI : 62 LOADS FOR PERMANENT STATE
![Page 20: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/20.jpg)
Profilomètre 3 : prévision et mesures
PROFILOMETER 3
Comparison between measured and calculated settlements
before fill removal
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
-20 0 20 40 60 80 100
x(m)
s(m
)
measures 3A measures 3B calculated measure T1 calculated T1
T1
60 cm
![Page 21: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/21.jpg)
Profilomètre 1 : prévision et mesures
OTHER PROFILOMETERS
![Page 22: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/22.jpg)
Profilomètre 2 : prévision et mesures
OTHER PROFILOMETERS
![Page 23: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/23.jpg)
Profilomètre 4 : prévision et mesures
OTHER PROFILOMETERS
![Page 24: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/24.jpg)
Profilomètre 5 : prévision et mesures
OTHER PROFILOMETERS
![Page 25: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/25.jpg)
Fluage : modèle de Bjerrum
SOIL CONSOLIDATION & CREEP
Bjerrum creep model - parameter tF for creep lines
Unloading from 1 to 2 :
m
FF tt
=
2
112 '
'
σσ
αCe
CCm SC
)1( +−=with :
![Page 26: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/26.jpg)
Lois de consolidation et de fluage
SOIL CONSOLIDATION & CREEP
![Page 27: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/27.jpg)
Asaoka sur T1 & T2
SOIL CONSOLIDATION : ASAOKA
T1 T2
![Page 28: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/28.jpg)
Consolidation : courbe ajustée sur T1
SOIL CONSOLIDATION : CURVE FITTING
T1
![Page 29: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/29.jpg)
Consolidation : courbe ajustée sur T2
T2
SOIL CONSOLIDATION : CURVE FITTING
![Page 30: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/30.jpg)
Consolidation & fluage sur T1
SOIL CONSOLIDATION & CREEP
T1
Creep parameter
CONSOLIDATION ONLY
CONSOLIDATION + CREEPCONNECTING POINT
LAST MEASUREMENT
layers subjected to creep at 25m depth : peaty clay , cumulated thickness = 3m
![Page 31: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/31.jpg)
Tassements à 10 ans (ch. perm.) : courbes
SETTLEMENT PREDICTED at 10 years under permanent loads
85 mm
![Page 32: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/32.jpg)
Tassements à 10 ans (ch. perm.) : carte
SETTLEMENT PREDICTED at 10 years under permanent loads
![Page 33: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/33.jpg)
Tassements sous charge d’eau dans CZC
SETTLEMENT PREDICTED under water load in cell CZC
6,6 mm
![Page 34: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/34.jpg)
Tassements sous charge d’eau max
SETTLEMENT PREDICTED under maximum variable load
18 mm
![Page 35: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/35.jpg)
Modèle de la structure
SOIL-STRUCTURE INTERACTION
Model 1 : structure (3D) + subgrade springs for soil
=> initial reinforcement in the structure
Model 2 : 2D a slice of the structure, 5.6m thick : walls or porticos + elastic layer (28m thick) for soil
=> additional reinforcement (+10%)
![Page 36: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/36.jpg)
Modèle 1 : avec ressorts
SOIL-STRUCTURE INTERACTION Model 1 : structure on springs
![Page 37: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/37.jpg)
Modèle 2 : sol élastique
SOIL-STRUCTURE INTERACTION Model 2 (2D) : structure on elastic soil
![Page 38: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/38.jpg)
Modèle 2 : Valeurs de E
SOIL-STRUCTURE INTERACTION Model 2 (2D) : E values for soil
15.3m 29.55m90 m
Gravel 199
Fill 49
272 272
Sands 1 143 174 180
Sands 2 58 65 68
Clay 1 69Clay 2 30
7532
7934
E (MPa)
Soil in natural state Soils consolidated
![Page 39: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/39.jpg)
Modèle 2 : tassement file 17
SOIL-STRUCTURE INTERACTION Model 2 (2D)
Settlement at row 17 (columns)
Water in the 4 tanks
6,50 cm 4,11 cm
![Page 40: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/40.jpg)
Modèle 2 : tassement file 17
SOIL-STRUCTURE INTERACTION Model 2 (2D)
Settlement at row 17 (columns)
Water in 2 tanks on left, 1 on right
5,65 cm 2,60 cm
![Page 41: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/41.jpg)
Modèle 2 : tassement files 1 & 20
SOIL-STRUCTURE INTERACTION Model 2 (2D)
Settlement at rows 1 & 20 (walls)
Water in the 4 tanks
2,50 cm 1,76 cm
![Page 42: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/42.jpg)
Tassements mesurés en service (1 an) : carte
SETTLEMENTS MEASURED IN SERVICE
-16
CELL CZA
(mm)
Settlements under water levelfluctuation of 1,1m in one tank
![Page 43: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/43.jpg)
Avantages inconvénients
THE OPINION OF THE CONSTRUCTION WORKS DIRECTOROn the preloading solution
PROS
Lower cost
Simple technique (standard earthworks)
hence : allows to prepare easily thestructure works
CONS
Fill material management atacceptable cost (supply, disposal)
Impact of road transportation (400 trucks / day in the city)
Lack of schedule visibility
Difficulty to obtain approval by thesupervisor on the method and on the time for fill removal
![Page 44: The foundation of the new sewage plant at le Havre An ... · Bond &Harris UU London clay pl* et la solution pieux PILES = the initial foundation concept 360 piles mesh : 5,6mx5,6m](https://reader033.fdocuments.net/reader033/viewer/2022050303/5f6c4efa490f5426c3050981/html5/thumbnails/44.jpg)
FIN FONDASOL
Fin - FONDASOL
THANK YOU FOR YOUR ATTENTION !