The experienced specialist
Transcript of The experienced specialist
The experienced specialist
•Extensive experience in the area of installations and complete systems in underground constructions •Project development beginning with the conceptual
idea all the way to the final system performance •An early involvement of the specialists is essential
and will make all the difference
Highly efficient complete systems
•High-performance back-up installations for conventional and mechanized tunnel headings •Transportation logistics
•Highly efficient custom-made complete systems
The comprehensive approach – our strength
•Vast experience in the interface between construction execution and mechanization •Trouble shooter for complex construction procedures
through mechanization, rationalization and humanization •Economical solutions through optimization of
investment and operating costs •High quality and high operational safety •General contractors for the complete supply and
removal logistics including supporting measures.
The comprehensive approach – our strength
Potential for savings and optimization
time
• more efficient material flow • more efficient work flow • higher advance rates (Back-up) • less operational standby • safer site surrounding
from experience: 5 to 15 % savings to contractor’s base case possible
Costs of contractor’s base case
Costs of case by Rowa’s commitment
Start of Rowa’s commitment
Job site start
Costs
Lower final costs Faster Safer Better added value
Our performance record: hundreds of successfully operated special installations!
Back-up Systems for TBM
AlpTransit Gotthard, Amsteg
Back-up System
Schweiz / Switzerland, 2002
AlpTransit Gotthard, Amsteg
Monorail
Schweiz / Switzerland, 2002
AlpTransit Gotthard, Amsteg
Impact Roller Crusher
Schweiz / Switzerland, 2002
AlpTransit Gotthard, Amsteg
Shotcrete Robot
Schweiz / Switzerland, 2002
AlpTransit Gotthard, Amsteg
Suspended Platform
Schweiz / Switzerland, 2002
Wienerwald
From Mechanization to Automation
Österreich / Austria 2005
Wienerwald
Automated Lining Segment Transloading
Österreich / Austria 2005
Wienerwald
Österreich / Austria 2005
JIT Wet Mortar Production, Concrete Transloading
Wienerwald
Österreich / Austria 2005
Automated Transloading Back-up Tracks
Moskow, Subway Station Access
Russland / Russia 2007
Backup system for inclined shafts
Moskow, Subway Station Access
Russland / Russia 2007
Segment transloading crane
Channel Tunnel Rail Link
England / England 2002
Segment handling crane I
Westerschelde
Niederlande / Netherland 1999
Segment handling crane I
Westerschelde
Niederlande / Netherland 1999
Segment handling crane II
Westerschelde
Niederlande / Netherland 1999
Suspended backup system
Madrid, M30
Spanien / Spain 2005
Quick unloading system
Madrid, M30
Spanien / Spain 2005
Segment feeder
Madrid, M30
Spanien / Spain 2008
Segment crane
Katzenberg
Deutschland / Germany 2005
Invert concrete installation
Montegiglio
Italien / Italy 2004
Supply Train Climber III
PPS Limberg II, Kaprun
Anti-Slip-Back-Device
Österreich / Austria, 2007
Brisbane, North-South-Bypass-Tunnel
Australien / Australia 2009
Dismantling crane for backup
AlpTransit Gotthard, Amsteg
Infrastructure for Cross Passages
Schweiz / Switzerland, 2005
Durchmesserlinie, Zurich
Schweiz / Switzerland 2008
Supply and Removal Logistics
Durchmesserlinie, Zurich
Schweiz / Switzerland 2008
Removal Installation
Durchmesserlinie, Zurich
Schweiz / Switzerland 2008
Supply Installation
AlpTransit Gotthard, Amsteg
Foil Placing Machine
Schweiz / Switzerland, 2007
AlpTransit Gotthard, Bodio, Faido
Foil Placing Machine
Schweiz / Switzerland, 2004
AlpTransit Gotthard, Sedrun
RoCon Shuttle - Concrete transportation system
Schweiz / Switzerland, 2007
Heading Installations for Drill & Blast
AlpTransit Ceneri Base Tunnel
Back-up System D&B
Schweiz / Switzerland, 2010
AlpTransit Ceneri Base Tunnel
Back-up System D&B
Schweiz / Switzerland, 2010
AlpTransit Gotthard, Sedrun
Schweiz / Switzerland, 2004
Special Machine for Rock Support
AlpTransit Gotthard, Sedrun
Schweiz / Switzerland, 2004
Special Machine for Rock Support
La Muela II, Valencia
Heading Installation for Inclined Shaft
Spanien / Spain, 2009
Rowa’s performance
•40 years experience •250+ projects •around the globe •first class reference list
A strong team of specialists
•higher productivity •better economic performance •maximum availability of the installation •highest operational safety of the equipment
Worldwide leaders in the area of logistics and special machinery for underground construction
• Quality on workmanship • Availability • Industrial safety • Short learning curve • Return on Investment • Short Turn-around times, short delivery times • Date loyalty
Quality at Rowa
Rowa Tunnelling Logistics AG CH-8855 Wangen, Switzerland
Your Partner for Logistic Systems in Underground Work