The Evolution of Long-Term Stewardship at Hanford
Rick MorenMSA Director of Long-Term StewardshipMission Support Alliance
2
LTS Program at a Glance
DOE LTS Program Plan
DOE RIMS Transition Procedure
MSA System Description
MSA Transition Procedure
Program Readiness Review
MSA Information Mgmt Plan
DOE RIMS Operations Procedure
2010 2011 2012 2013 2014Rev
Rev
Rev Rev Rev
Rev
Rev
Rev
Rev
Rev
Approval
Rev
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000Ac
res
Tran
sitio
ned
to LT
S
ISS ReactorsSegment 523,360 Acres
100-F Area1,149 Acres
Segment 324,483 Acres
Segment 220,080 Acres
Segment 118,161 Acres
Post Cleanup S&M Activities
3
ISS Reactors• C Reactor• D Reactor• DR Reactor• N Reactor• H Reactor
Segment 5 100-F Area
Segment 2 Segment 3
Segment 1 100-B/C 100-N Area 100-IU-6 100-D/H
300 Area
2011 2012 2013 2014 2015 2016
100-K Area Segment 4 100-IU-2
C
N
D DRH
Transition Schedule
4
Reactor Transition
• 6 of 9 Cocooned Reactors Transitioning to LTS
• Consolidating Reactors Under one Contractor
• Supports Closure Subcontractor Exit Strategy
• Knowledge Transfer (500+ Documents)
• Nuclear Safety
• Sets Stage for Efficiency in S&M
5
“Why didn’t we think of that”?
• Collaboration with Closure Contractor and TPA
• Started in 2012 with an Idea
• Focus on Efficiency in Dealing with Structures
ISS Reactor Completed 5-year Entry/Inspection Original Inspection Schedule
CY98 CY99 CY00 CY01 CY02 CY03 CY04 CY05 CY06 CY07 CY08 CY09 CY10 CY11 CY12 CY13 CY14 CY15 CY16 CY17 CY18 CY19 CY20 CY21 CY22
105-C
105-D
105-DR
105-F
105-H
105-N
Original Inspection Schedule
CY13 CY14 CY15 CY16 CY17 CY18 CY19 CY20 CY21 CY22
LTS Revised Inspection Schedule
CY13 CY14 CY15 CY16 CY17 CY18 CY19 CY20 CY21 CY22
6
Radiological Monitoring
• Post Closure Monitoring (10-CFR-835)
• Interim Closed Radiological Waste Sites
• Detail Gamma Mapping
7
Partnering for Success
• Legacy Management – Early Communication– File Structure– Information Sharing– Pilot Project in Data Storage
• Hanford Partners– DOE, Contractors,
• Other Interested Parties– Tribes, State of Oregon,
HAB, Regulators
8
ISS Reactors
Segment 523,360 Acres
100-F Area1,149 Acres
Segment 324,483 Acres
Segment 220,080 Acres
Segment 118,161 Acres
What’s Next?
2011 2012 2013 2014
Acre
s Tr
ansi
tione
d to
LTS
Post Cleanup S&M Activities
2015 2016 2017
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
110,000
120,000
130,000
140,000
100-K Area2,218 Acres
100-B/C Area2,851 Acres
100-N Area2,196 Acres
100-D/H Area5,016 Acres
300 Area1,742 Acres
IU2/Segment 4A12,071 Acres
IU6/Segment 4B16,890 Acres
9
For Further Information Contact:
Rick Moren, PGMSA Director of Long-Term StewardshipMission Support Alliance, 1979 Snyder Ste 201, Richland, WA O: 509.376.0852M: [email protected]
Keith D. GrindstaffHanford Long-Term Stewardship (LTS) Program ManagerU.S. Department of Energy, Richland, WA O: 509-376-1774M: [email protected]
10