CAASTNET, Accra, 3rd December 2012 C J Carlile 1
Thank you for the Invitation !Colin Carlile
on behalf of the ESS team
The European Spallation Source Opportunities for collaboration with Africa
“A scene-setting scene, to set the sceneand see the set”
Alan BennettEnglish playwright
CAASTNET, Accra, 3rd December 2012 C J Carlile 2
Lund
Malmö CopenhagenÖresund bridge
MAX IV&
ESS
The view of ESS from the North-East in 2025
CAASTNET, Accra, 3rd December 2012 C J Carlile 3
May 28th 2009 Brussels
Lund ?Bilbao ?Debrecen ?Nowhere at all ?
What happened in 2009 ?A minor miracle occurred
Lund
European Spallation SourceProposed Sites
Bilbao
Debrecen
CAASTNET, Accra, 3rd December 2012 C J Carlile 4
The ESS Headlines• ESS will be the world’s best source of
slow neutrons by 2025
• ESS will produce its first neutrons in 2019
• ESS will cost 1479 M€2008 (1673 M€2013) to construct
ESS will be different• Sustainability & Environmental Responsibility• Harness Innovations• Excellent researcher support• Person-centred• Preparing for future technological innovations• “More than simply neutrons”
CAASTNET, Accra, 3rd December 2012 C J Carlile 6
Wave Particle Magnetic moment Neutral
Diffractometers - Measure structures– Where atoms and molecules are
1 - 10 Ångström
Neutrons are beautiful !
1 - 80 meV
Spectrometers - Measure dynamics– What atoms and molecules do
Cliff Shull
Bert Brockhouse
CAASTNET, Accra, 3rd December 2012 C J Carlile 7
“Small science at big facilities”
This is ourprimary product
CAASTNET, Accra, 3rd December 2012 C J Carlile 9
“If we wait for the moment when everything is ready, we shall never begin” Ivan Turgenev
Full Specification
CAASTNET, Accra, 3rd December 2012 C J Carlile 10
The Six Stages of a Project1.Enthusiasm2.Disillusionment3.Panic4.Search for the guilty5.Punish the innocent6.Praise and honour for the non-participants
Thanks to Kjell Möller
CAASTNET, Accra, 3rd December 2012 C J Carlile 11
NASA study onCost Estimates 2010
A direct correlationbetween
schedule overruns& cost overruns
Time really is money !
CAASTNET, Accra, 3rd December 2012 C J Carlile 16
Sweden, Denmark and Norway50% of construction costs – 1479 M€
ESS has got the Partners
Spain, France, Germany, Italy, Switzerland, Hungary, Czech Republic,Poland, Netherlands, Estonia, Latvia, Lithuania, Iceland & UK
the remaining 50%
17 Partnerstoday
CAASTNET, Accra, 3rd December 2012 C J Carlile 18
Innovation, goals, added value,politics, the media
CAASTNET, Accra, 3rd December 2012 C J Carlile 19
Green field site - Green field thinkingEnvironment, Sustainability, EnergyReliabilityInnovations – use them, harness themRobots, Automation, Computer control“ESS – like no other”
CAASTNET, Accra, 3rd December 2012 C J Carlile 20
LINXSInstitute for Neutronand X-ray Science
Advanced Neutronand X-ray
Technologies
“More thansimply neutrons”
Centre for Energy MaterialsCentre for Climate MaterialsCentre for Health MaterialsCentre for Industrial MaterialsCentre for Sustainability Materials
Managed by Academic Institutestogether with ESS & MAX IVfor the use of their researchers
The Partnership for Structural Biology
CAASTNET, Accra, 3rd December 2012 C J Carlile 21
Western Harbour Malmö
Lund, Sweden - Innovation, Tradition and Innovation
The University Town of Lund
The Biomedical Centre Lund
CAASTNET, Accra, 3rd December 2012 C J Carlile 22
This is how ESS will do it in 2020
RenewableCarbon Dioxide: 120,000 tonnes/yearsaved
RecyclableCarbon Dioxide:15,000 tonnes/yearsaved
ResponsibleCarbon Dioxide30,000 tonnes/yearsaved
Link to the grid Turning Torso, Malmö
CAASTNET, Accra, 3rd December 2012 C J Carlile 23
Take home messageIt’s not the setting of goals that matters
It’s the scoring of them
Ask Lionel Messi
CAASTNET, Accra, 3rd December 2012 C J Carlile 25
ASP2012 Ghana - Kumasi
Modeled after ASP2010 agenda
Additional topics:
Digital libraryCERN – KNUST agreement
OSG Grid WorkshopConnection to ASP2012, a dedicated Grid School will follow on Aug. 6-8 2012
CAASTNET, Accra, 3rd December 2012 C J Carlile 26
Enthusiastic students for 3-weeks
First week, dedicated to Theoretical PhysicsSecond week, dedicated to Experimental Physics
Third week, dedicated to Accelerators and Applications
26
CAASTNET, Accra, 3rd December 2012 C J Carlile 27
- Neutron Radiography
- Materials Research
SAFARISAFARI--1 Research 1 Research ReactorReactor