The equipment used to accomplish the construction of Terbela Dam

Tarbela Dam is located in Pakistan and is the world's largest fill-type dam. It is built over

the River Indus near the small town of Tarbela in the Haripur District of the country. It is also the

second largest dam in the world in terms of reservoir capacity, which is 11.62 million acre-feet

(14.3 billion cubic metres).

Construction on the primary elements of the project was started in 1968 and initial operations of

the dam started in 1978. The project was fully completed in 1984, at a cost of $1.49bn

Proper use of the appropriate equipment contributes to economy, quality, safety, speed and

timely completion of a project.

Equipment are used for highway projects, irrigation, buildings, power projects etc.

15-30% of total project cost has been accounted towards equipment and machinery.

1. Earth-moving equipment

2. Hauling equipment

3. Hoisting equipment

4. Conveying equipment

5. Aggregate and concrete production equipment

6. Pile-driving equipment

7. Tunneling and rock drilling equipment

8. Pumping and dewatering equipment

Operations involved in construction of Tarbela damExcavation

Digging of large quantities of earth

Page 2: The equipment used to accomplish the construction of terbela dam

Moving them to distances which are sometimes fairly long

Placement

Compacting

Leveling

Dozing

Grading

Hauling

Power shovel

Back hoe

Drag line

Clam shell

Scrapers

Bull dozer

Stationary or derrick cranes

Mobile cranes

Overhead or gantry cranes

Traveller cranes