The EnviWaste biogas plant in Kishiwada, Osaka (Japan)
Planning
Implementation
Commissioning
Operation
Service
EnviTec Biogas has entered the relatively young Japa-nese biogas market with a 250 kWel biogas plant. The EnviWaste plant in Kishiwada (a city of Osaka) has been feeding electricity into the network since 27 March 2015. This means that the feed-in operation was in punctual compliance with the date that was targeted for the initial feed-in operation. The plant was designed and enginee-red in cooperation with the Japanese partner RENAGEN. RENAGEN is part of the REMATEC Group, which is a large waste material recycling company in Japan and south-east Asia. The target of the cooperation is the expansion of the biogas market in Japan.
The plant consists of a digester which has a size of 853 cubic metres. It converts about 17 tonnes of food waste that comes from a nearby unpacking and processing plant into biogas every day which is burned in a combined heat and power plant (CHP). The electricity is fed into the public network.
Location: Kishiwada, Osaka (Japan)Capacity: 250 kWel
In operation since: March 2015Input materials: Food wasteFeatures: The EnviWaste plant that features a compact
container structure is operated exclusively on the basis of food waste. It feeds electricity into the public grid.
Kishiwada Biogas Plant, Osaka (Japan)
T:\2
014\
14-0
74 B
GA
Ren
agen
Inc.
(Jap
an)\0
1 La
gepl
an -
layo
ut p
lan_
Tras
senp
lan
- rou
te p
lan\
14-0
74_3
.LP
00-0
2-LP
_3.L
P40
-07-
TP_3
.LP
70-0
4-H
P_3
.EX
10-0
1-E
X_3
.LP
37-0
1-P
OT_
SO
S.d
wg
Project team:projectmanagement:constructionmanagement:project planning:
call number:
call number:
call number:
changed:
examined:
drawn:
namedate
drawing number:
scale:
kind of the changenamedatenr.
representation:
measure:
owner:
We
poss
es a
cop
yrig
ht a
t our
des
igns
. The
se d
esig
ns m
ay b
e us
edon
ly fo
r the
per
sona
l use
. We
ask
for r
etur
n du
ring
disu
se.
Dup
licat
ion
is n
ot a
llow
ed.
page number
project number
building place:
EnviTec Anlagenbau GmbH & Co. KGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E [email protected] www.envitec-biogas.de
BGP Kishiwada
construction of a biogas plant
layout plan
14-074_3.LP00/1-0314-0743.LP001:150
15.10.2014 J. Freiberger15.10.2014 A.Bosse11.12.2014 S.Selzer
A.Bosse 0049 2574 8888 819
O.Ahlemeyer/D.Hagemann 0049 2574 8888 907/128
Selzer, Sonja ISO full bleed A1 (841.00 x 594.00 mm)
04.0
6.20
13 1
1:40
:53
1 20.10.2014 S.Selzer main platform changed
2 23.10.2014 J. Freiberger CHP and technical container changed; gate and filling station drawn in
3 11.12.2014 S.Selzer technical container and platform moved
The Kishiwada bio-gas plant is one of about 600 biogas plants in Japan.
On account of the small building area, the trans-portation and installation of the components had to be coordinated with a high degree of precision.
An overview of the Kishiwada biogas plant