![Page 1: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/1.jpg)
THE ENVISION RATING SYSTEM®
ENVISIONing Resilient Design in a Changing
World
![Page 2: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/2.jpg)
2018 Headlines:
![Page 3: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/3.jpg)
Station Fire, 160,577 acres burned (photo from https://photojournal.jpl.nasa.gov/catalog/PIA12190
2009 (& 2018) Headlines:
![Page 4: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/4.jpg)
NOAA National Centers for Environmental Information (NCEI) U.S. Billion-Dollar Weather and Climate Disasters (2018). https://www.ncdc.noaa.gov/billions/
Each year, the United States averages• 10,000 thunderstorms• 5,000 floods• 1,300 tornadoes • 2 Atlantic hurricanes• widespread droughts and wildfires.
Weather, water and climate events, cause an average of approximately 650 deaths and $15 billion in damage per year and are responsible for some 90 percent of all presidentially-declared disasters. About one-third of the U.S. economy –some $3 trillion – is sensitive to weather and climate.
![Page 5: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/5.jpg)
America’s Infrastructure Today
5
![Page 6: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/6.jpg)
The Future of Infrastructure Sustainability = Resiliency
![Page 7: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/7.jpg)
•Yes, I've heard about it and use it.
•Yes, I've heard about it but haven't used it yet.
•It sounds familiar....
•No, I have not heard of it.
Have you heard about/used ISI Envision v.2 or the new v.3?
QUESTION:
![Page 8: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/8.jpg)
• Envision is a sustainability framework
• Verification program with award levels
(optional)
• Envision can be used
o ALL Infrastructure
o ALL phases of project
ENVISION
Fourth Ward Park | Envision Gold
![Page 9: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/9.jpg)
•Identify project elements that will increase resiliency and sustainability under Envision V3.
•Use Envision checklist tools for self-assessment of projects’ sustainability.
•Design projects in accordance with the new 2018 Envision V3 framework to achieve maximum points towards project awards.
Objectives
![Page 10: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/10.jpg)
Why Was EnvisionTM Developed?
Current rating systems for infrastructure in the U.S. are sector specific
No U.S. system covers all aspects of infrastructure
Envision™ is designed to fill the gap
![Page 11: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/11.jpg)
Collaborators
ISI Founders (2010)
![Page 12: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/12.jpg)
ENERGYGeothermal
Hydroelectric
Nuclear
Coal
Natural Gas
Oil/Refinery
Wind
Solar
Biomass
WATER
Potable water distribution
Capture/Storage
Water Reuse
Storm Water
Management
Flood Control
WASTESolid waste
Recycling
Hazardous Waste
Collection & Transfer
TRANSPORTAirports
Roads
Highways
Bikes
Pedestrians
Railways
Public Transit
Ports
Waterways
LANDSCAPEPublic Realm
Parks
Ecosystem Services
INFORMATIONTelecommunications
Internet
Phones
Satellites
Data Centers
Sensors
What Types Of Infrastructure Will EnvisionTM Rate?
![Page 13: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/13.jpg)
Credits in 5 Categories
Purpose, Community, Wellbeing
Siting, Land & Water, Biodiversity
Materials, Energy, Water
Collaboration, Management, Planning
Emission, Resilience
13
![Page 14: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/14.jpg)
Levels of Achievement
0
5
10
15
20
25
30
Improved Enhanced Superior Conserving Restorative
Po
ints
QL1.1 IMPROVE COMMUNITY QUALITY OF LIFE
No Negative Impact
14
![Page 15: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/15.jpg)
Envision Components
◾ Guidance Manual
◾ Pre-Assessment Checklist
◾ Online Scoresheet
◾ Verification and Award Program
◾ Professional Credential
![Page 16: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/16.jpg)
Are we Building the project
right?
ARE we building the RIGHT
PROJECT?
ENVISION
![Page 17: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/17.jpg)
THE ENVISION RATING SYSTEM®
Looking Forward: Envision v3 – Highlights
![Page 18: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/18.jpg)
• Lessons learned
• Advancing industry
• Evolving industry needs
• Leading edge
Why Change?
South LA Wetlands Park | Envision Platinum
![Page 19: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/19.jpg)
Developing Envision v3
• Timeline: September 2015 – early 2018
• 13 Technical Committees
o Review credits
• Envision Review Board
o Industry-leading professionals
o maintain integrity of Envision Framework
• ISI Staff & Board of Directors
• Public Comment period: September – November 2017
• Roll out: 2018
![Page 20: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/20.jpg)
Agenda
Highlights
Boston Landing | Envision Silver
Major Changes
Basics • What remains the same
• Elemental Differences
• Verification
• Credential Maintenance
• New Credits
![Page 21: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/21.jpg)
What Remains The Same
• Assess infrastructure projects of all types
and sizes
• Optional verification program to help
users calibrate their self-assessments
• Envision can be used to validate
sustainable performance
![Page 22: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/22.jpg)
Elemental Differences
Envision v2 Envision v3
Number of credits 60 64
Maximum total points in the
framework809 1000
Credit categories
Five (5): Quality of Life,
Leadership, Resource Allocation,
Natural World, Climate and Risk.
Five (5): Quality of Life,
Leadership, Resource Allocation,
Natural World, Climate and
Resilience.
Cost of EnvisionThe Envision sustainability
framework is available for free.
The Envision sustainability
framework will continue to be
free for all ISI members.
![Page 23: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/23.jpg)
2
MAJOR CHANGES
![Page 24: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/24.jpg)
• Can still verify under Envision v2.
• Required to complete verification by December 31, 2020 (unless special permission has been granted by ISI).
• Beginning January 1, 2019 all projects will be Envision v3.
• Envision v3 will require a post-construction review.
VERIFICATION
New Verification Path
Future Projects
Currently Registered
Projects
Greenough Greenway | Envision Award
![Page 25: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/25.jpg)
Verification – Envision v3
Path A: Verification at or after 95% Design Completion
Created Registered In Verification First ReviewSecond Review
AwardPost-
Construction Review
Complete
Path B: Verification after 95% Construction Completion
Created RegisteredIn
VerificationFirst Review
Post-Construction
ReviewAward Complete
![Page 26: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/26.jpg)
ENV SP Credential Maintenance
Maintenance Requirements
Member (incl. individual) Non-Member
Education 7 hours per year
• 2 prescribed by ISI
• 5 user’s choice
7 hours per year
• 2 prescribed by ISI
• 5 user’s choice
Fee $50/year
• Includes $50 “store credit”
for education courses
• Additional courses: $10
$80/year
• Includes $80 “store credit”
for education courses
• Additional courses: $20
![Page 27: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/27.jpg)
3
HIGHLIGHTS
![Page 28: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/28.jpg)
New Credits (11)Quality of Life
• Improve Construction Safety
• Minimize Construction Impacts
• Advance Equity and Social Justice
Leadership
• Plan for Sustainable Communities
• Conduct a Lifecycle Economic Evaluation
Resource Allocation
• Reduce Construction Waste
• Reduce Construction Energy Use
• Reduce Construction Water Use
Natural World
• Reclaim Brownfields
Climate & Resilience
• Avoid Unsuitable Development
• Establish Resilience Goals and Strategies
![Page 29: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/29.jpg)
Quality of Life
• Improve Construction Safety
• Minimize Construction Impacts
Resource Allocation
• Reduce Construction Waste
• Reduce Construction Energy Use
• Reduce Construction Water Use
NEW CONSTRUCTION
CREDITS
Kunia Country Farms | Envision Gold
![Page 30: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/30.jpg)
QL1.3 IMPROVE CONSTRUCTION SAFETY
INTENT:
Enhance public and worker safety during construction.
METRIC:
Commitments and measures taken during construction to monitor safety, provide feedback mechanisms, train personnel, establish security plans, and make health programs available.
![Page 31: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/31.jpg)
QL1.6 MINIMIZE CONSTRUCTION IMPACTS
INTENT:
Minimize or eliminate the
temporary inconveniences
associated with construction.
METRIC:
Extent of issues addressed
through construction
management plans.
![Page 32: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/32.jpg)
QL3.1 ADVANCE EQUITY AND SOCIAL JUSTICE
INTENT:
Ensure that equity and social justice are fundamental considerations within project processes and decision making.
METRIC:
Degree to which equity and social justice are included in stakeholder engagement, project team commitments, and decision making.
![Page 33: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/33.jpg)
LD 2.2 PLAN FOR SUSTAINABLE COMMUNITIES
INTENT:
Incorporate sustainability principles into project selection/identification in order to develop the most sustainable project for the community.
METRIC:
The degree to which project selection/identification includes sustainability performance assessments in considering alternatives and is part of a larger sustainable development plan.
![Page 34: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/34.jpg)
LD3.3 CONDUCT A LIFECYCLE ECONOMIC
EVALUATION
INTENT:
Utilize economic analyses to identify the full economic
implications and the broader social and environmental
benefits of the projects.
METRIC:
The comprehensiveness of the economic analyses used
to determine the net impacts of the project, and their use
in assessing alternatives to inform decision making.
![Page 35: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/35.jpg)
RA1.4 REDUCE
CONSTRUCTION WASTE
INTENT:
Divert construction and demolition
waste streams from disposal to
recycling and reuse.
METRIC:
Percentage of total waste diverted
from disposal.
![Page 36: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/36.jpg)
RA2.2 REDUCE CONSTRUCTION ENERGY USE
INTENT:
Conserve resources and reduce greenhouse gases and air pollutant emissions by reducing energy consumption during construction.
METRIC:
The number of strategies implemented on the project during construction that reduce energy consumption and emissions.
![Page 37: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/37.jpg)
RA3.3 REDUCE CONSTRUCTION WATER USE
INTENT:
Reduce potable water consumption during
construction.
METRIC:
The number of strategies implemented during
construction that reduce potable water consumption.
![Page 38: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/38.jpg)
NW2.1 RECLAIM BROWNFIELDS
INTENT:
Locate projects on sites
classified as brownfields.
METRIC:
The degree of remediation
of the brownfield site.
![Page 39: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/39.jpg)
CR2.1 AVOID UNSUITABLE DEVELOPMENT
INTENT:
Minimize or avoid development on sites prone to hazards.
METRIC:
The degree to which the project is designed and/or sited to avoid or mitigate site related risks.
![Page 40: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/40.jpg)
CR2.4 ESTABLISH RESILIENCE GOALS AND
STRATEGIES
INTENT:
To support increased project and community resilience
through the establishment of clear objectives and goals.
METRIC:
The degree to which resilience goals expand from initial
commitments to quantifiable project objectives, long-term
operating plans, and community-wide development plans.
![Page 41: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/41.jpg)
Using the Manual Improvements and new sections
![Page 42: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/42.jpg)
•Yes, definitely
•Sounds Interesting
•Maybe, I'm not sure
•No, I don't think so
Has this talk made you want to learn more about/use Envision?
QUESTION:
![Page 43: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/43.jpg)
FOR MORE
INFORMATION
ABOUT
ENVISION
SustainableInfrastructure.org
© 2015 ISI, Inc., all rights reserved.
![Page 44: THE ENVISION RATING SYSTEMnorthernca.apwa.net/Content/Chapters/northernca...Elemental Differences Envision v2 Envision v3 Number of credits 60 64 Maximum total points in the framework](https://reader030.fdocuments.net/reader030/viewer/2022040405/5e954dcadd42304ec937830c/html5/thumbnails/44.jpg)
Thank you!
Selena Gonzalez, Environmental SpecialistQSP, QISP, CESSWI, ENV SP