The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources...

54
The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor, UT Dallas Chancellor’s Health IT Fellow, UT System [email protected] Better Faster Cheaper

Transcript of The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources...

Page 1: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The DIY Information Technology Strategic Plan

Kirk Kirksey Vice President for Information ResourcesUT Southwestern Medical Center

Adjunct Professor UT DallasChancellorrsquos Health IT Fellow UT System

kirkkirkseyutsouthwesternedu

Better Faster Cheaper

Typical Strategic Planning Consulting Costs$300 per hour plus expenses

The IT Strategic Plan

Why Plan

What Does Strategy Look Like

The Strategic Planning ProcessA Brief Case StudyYour THoughtsWhat We Did Right Where We Missed the Boat and the New Picture

The CHAOS Report

bull User Involvement 19 points

bull Executive Mgt Support 16 points

bull Clear Statement ofRequirements 15 points

bull Proper Planning 11 points

bull Realistic Expectations 10 points

bull Smaller Project Milestones 9 points

bull Competent Staff 8 points

bull Ownership 6 points

bull Clear Vision amp Objectives 3 points

bull Hard-Working Focused Staff 3 pointsSource The Standish Group International

diams Prescriptive (in which normative assumptions derive from a view that the environment isrelatively constant and the challenge for strategy development is to respond or adjust tothe environment)1048766 Design school1048766 Planning school1048766 Positioning school

diams Descriptive (in which the approach is derived from empirical findings or disciplinaryperspectives and methods)1048766 Entrepreneurial school1048766 Cognitive school1048766 Learning school1048766 Cultural school1048766 Political school1048766 Environmental school

Mintzbergrsquos Strategy Types

Core ldquoDesign Schoolrdquo Model

of Strategy Formulation

Derived from The Rise and Fall of Strategic PlanningHenry Mintzberg

Is IT Planning Worth IT

What Does Strategy Look Like

Strategic Choice Making

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 2: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Typical Strategic Planning Consulting Costs$300 per hour plus expenses

The IT Strategic Plan

Why Plan

What Does Strategy Look Like

The Strategic Planning ProcessA Brief Case StudyYour THoughtsWhat We Did Right Where We Missed the Boat and the New Picture

The CHAOS Report

bull User Involvement 19 points

bull Executive Mgt Support 16 points

bull Clear Statement ofRequirements 15 points

bull Proper Planning 11 points

bull Realistic Expectations 10 points

bull Smaller Project Milestones 9 points

bull Competent Staff 8 points

bull Ownership 6 points

bull Clear Vision amp Objectives 3 points

bull Hard-Working Focused Staff 3 pointsSource The Standish Group International

diams Prescriptive (in which normative assumptions derive from a view that the environment isrelatively constant and the challenge for strategy development is to respond or adjust tothe environment)1048766 Design school1048766 Planning school1048766 Positioning school

diams Descriptive (in which the approach is derived from empirical findings or disciplinaryperspectives and methods)1048766 Entrepreneurial school1048766 Cognitive school1048766 Learning school1048766 Cultural school1048766 Political school1048766 Environmental school

Mintzbergrsquos Strategy Types

Core ldquoDesign Schoolrdquo Model

of Strategy Formulation

Derived from The Rise and Fall of Strategic PlanningHenry Mintzberg

Is IT Planning Worth IT

What Does Strategy Look Like

Strategic Choice Making

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 3: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The IT Strategic Plan

Why Plan

What Does Strategy Look Like

The Strategic Planning ProcessA Brief Case StudyYour THoughtsWhat We Did Right Where We Missed the Boat and the New Picture

The CHAOS Report

bull User Involvement 19 points

bull Executive Mgt Support 16 points

bull Clear Statement ofRequirements 15 points

bull Proper Planning 11 points

bull Realistic Expectations 10 points

bull Smaller Project Milestones 9 points

bull Competent Staff 8 points

bull Ownership 6 points

bull Clear Vision amp Objectives 3 points

bull Hard-Working Focused Staff 3 pointsSource The Standish Group International

diams Prescriptive (in which normative assumptions derive from a view that the environment isrelatively constant and the challenge for strategy development is to respond or adjust tothe environment)1048766 Design school1048766 Planning school1048766 Positioning school

diams Descriptive (in which the approach is derived from empirical findings or disciplinaryperspectives and methods)1048766 Entrepreneurial school1048766 Cognitive school1048766 Learning school1048766 Cultural school1048766 Political school1048766 Environmental school

Mintzbergrsquos Strategy Types

Core ldquoDesign Schoolrdquo Model

of Strategy Formulation

Derived from The Rise and Fall of Strategic PlanningHenry Mintzberg

Is IT Planning Worth IT

What Does Strategy Look Like

Strategic Choice Making

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 4: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The CHAOS Report

bull User Involvement 19 points

bull Executive Mgt Support 16 points

bull Clear Statement ofRequirements 15 points

bull Proper Planning 11 points

bull Realistic Expectations 10 points

bull Smaller Project Milestones 9 points

bull Competent Staff 8 points

bull Ownership 6 points

bull Clear Vision amp Objectives 3 points

bull Hard-Working Focused Staff 3 pointsSource The Standish Group International

diams Prescriptive (in which normative assumptions derive from a view that the environment isrelatively constant and the challenge for strategy development is to respond or adjust tothe environment)1048766 Design school1048766 Planning school1048766 Positioning school

diams Descriptive (in which the approach is derived from empirical findings or disciplinaryperspectives and methods)1048766 Entrepreneurial school1048766 Cognitive school1048766 Learning school1048766 Cultural school1048766 Political school1048766 Environmental school

Mintzbergrsquos Strategy Types

Core ldquoDesign Schoolrdquo Model

of Strategy Formulation

Derived from The Rise and Fall of Strategic PlanningHenry Mintzberg

Is IT Planning Worth IT

What Does Strategy Look Like

Strategic Choice Making

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 5: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

diams Prescriptive (in which normative assumptions derive from a view that the environment isrelatively constant and the challenge for strategy development is to respond or adjust tothe environment)1048766 Design school1048766 Planning school1048766 Positioning school

diams Descriptive (in which the approach is derived from empirical findings or disciplinaryperspectives and methods)1048766 Entrepreneurial school1048766 Cognitive school1048766 Learning school1048766 Cultural school1048766 Political school1048766 Environmental school

Mintzbergrsquos Strategy Types

Core ldquoDesign Schoolrdquo Model

of Strategy Formulation

Derived from The Rise and Fall of Strategic PlanningHenry Mintzberg

Is IT Planning Worth IT

What Does Strategy Look Like

Strategic Choice Making

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 6: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Core ldquoDesign Schoolrdquo Model

of Strategy Formulation

Derived from The Rise and Fall of Strategic PlanningHenry Mintzberg

Is IT Planning Worth IT

What Does Strategy Look Like

Strategic Choice Making

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 7: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Is IT Planning Worth IT

What Does Strategy Look Like

Strategic Choice Making

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 8: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

What Does Strategy Look Like

Strategic Choice Making

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 9: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Supreme Court Justice Potter Stewart

I Know It When I See Itrdquo

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 10: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The Von Schieffen Plan

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 11: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Strategy Map and Balanced Scorecardfor Southwest Airlines

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 12: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Strategy as Perspective

Old New

Strategy as

Position

New

Old

Big Mac Original

Recognizable ProductNew Market Position

Same MarketsNew Perspective

Could This Work

Position and Perspective

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 13: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

WalMart ndash What were they thinking

SUPERCENTERS NEIGHBORHOOD MARKET

a) All things to all peopleb) Average size 187000 sqftc) Preferred access ndash major transport artery

a) Grocerypharmacy combob) Average size 43000 sqftc) Preferred access ndash neighborhood accessd) Same Stuff

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 14: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The IT Strategic Plan

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 15: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Start with the End in MindThe Strategic Plan Table of Contents

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 16: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

UTSW IT Strategic Planning Approach

Initiate Project

Business PrioritiesGuardrails amp Assumptions

Business PrioritiesGuardrails amp Assumptions

Vision for ITVision for IT

Define Strategic Context

ManagementOf IT

ManagementOf IT

ApplicationsApplications

TechnologyTechnology

Analyze Gaps

Customer PerceptionCustomer Perception

PerformancePerformance

Assess IT Effectiveness

Management of ITManagement of IT

Develop AlternativesDevelop Alternatives

Select StrategySelect Strategy

Develop Strategy

Define PlanDefine Plan

Strategy CommunicationDocument

Strategy CommunicationDocument

StrategyImplementation Plan

StrategyImplementation Plan

Communicate Plan

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 17: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Establishing Strategic Planning Governance

Scope (what is being governed) Decision (who makes decision) Input (who has input) Mechanisms (more meetings)

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 18: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Executive Steering Committee (EST)

1 MeetingQtr

Final Approval for IT Strategy and Financing

Project Steering Committee

1 Meeting per Week

Final Approval for Strategy

Recommendation

Consulting Team

strategy formulation

Representative Workgroups

Provide Targeted Input

Gather ExternalInternal

Information

Office of the CIO

The Governance of Strategic Planning

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 19: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Glue vs The Inarguable Option

To attract recruit and hire quality individuals to be employees of the City of XXX and develop motivate reward and recognize City of Dallas Employees

At Microsoft we work to help people and businesses throughout the world realize their full potential This is our mission Everything we do reflects this mission and the values that make it possible

To be for the long term our customerrsquos primary trusted technology partner

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 20: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Wherersquos the Glue

Recognizable ProductNew Market Position

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 21: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Our Glue

The 2004 IT Strategic PlanlsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

The 2010 IT Strategic PlanldquoMission Integrationrdquo ndash Create a computing environment capable of securely integrating the clinical education and research missions of UTSW

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 22: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Assess IT Effectiveness

Moderate to high marks for ambulatory and university customers Perceived as poor performers by hospital customers

Customer Perception

Variable performance based on ambulatoryinpatient boundaries

Performance

Separate strategies for separate facilities

Little leverage of common resources

Management of IT

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 23: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

300 Employees$40M Operating Budget4 of Institution Operating Budget (12b)

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 24: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Bad News

Good News

Application Vulnerabilities ndash ClinicalldquoLots of Stable Applications But They Are Oldrdquo

Functional RiskHigh

High

TechnicalRisk

Epic ChartTracking

Epic EMR

McKesson IBAX Pharmacy

MISYS LaboratoryInfo System

Access to CareNursingDocumentation

OACISCDR

SiemensPACS

Cerner PathnetPharmnetRadnet

Softmed HIM Suite

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Analyze Technology Gaps

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 25: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Onestaff Scheduling

Application Vulnerabilities ndash FinancialldquoMany Applications That Do Not Meet Customer Needsrdquo

Functional RiskHigh

High

TechnicalRisk

ADP HR amp Payroll

IDX Billing amp AR IDX Scheduling

amp Registration

OAS Admin System

Eclipsys TSI Dec Support

Siemens Invision

ANSOS Scheduling

ESI Materials Management

Kronos Time amp Attendance

System has technicalproblems is beingsunset or is on old architectures

System has majordeficiencies infunctionalities anddoes not meetcustomer needs

Bad News

Good News

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 26: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

SWOT Solution Matrix

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 27: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

City of Aberdeen Local Transport Strategy

Strategic Plan ndash East St Louis

Screen Shot of winswot(wwwcymeoncom)

The Many Faces of SWOT

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 28: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Politicalecologicalenvironmental issues current legislation home market future legislation Europeaninternational legislation regulatory bodies and processes government policies government term and change trading policies funding grants and initiatives home market lobbyingpressure groups international pressure groups

Economichome economy situation home economy trends overseas economies and trends general taxation issues taxation specific to productservices seasonalityweather issues market and trade cycles specific industry factors market routes and distribution trends customerend-user drivers interest and exchange rates

Sociallifestyle trends demographics consumer attitudes and opinions media views law changes affecting social factors brand company technology image consumer buying patterns fashion and role models major events and influences buying access and trends ethnicreligious factors

Technologicalcompeting technology development research funding associateddependent technologies replacement technologysolutions maturity of technology manufacturing maturity and capacity information and communications consumer buying mechanismstechnology technology legislation innovation potential technology access licensing patents

The PEST Analysis

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 29: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Hardware TCO

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 30: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The Total Cost of Ownership Pie

Source The Gartner Group

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 31: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Costs - Initial Investment

Hardware (platforms networks) Software base price (operating systems layered products

product license) Licensing approach (perpetual seat site concurrent use) Vendorconsultant implementation fees Interface fees Education and training Personnel and salaries Ancillary personnel required (network help desk security

desktop support) ASP outsoursing fees Can system be outsourced or ASPrsquos

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 32: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Costs ndash Total Cost of Ownership

Maintenance and support fees Support service levels (7X24 business

hours) New version upgrade costs (included in

maintenance) Ongoing training Ancillary personnel (eg network help desk

desktop support)

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 33: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

OASFinanceGeneralLedger

HRMSHuman

ResourcesPayroll

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index

Doc Imaging

AncillariesElectronic Medical Record

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 34: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

New Health System IR Vision - 2010

Clinic Scheduling Emergency Room Hospital Scheduling Hospital ADT

Patient Access

UTSWFaculty

ProfessionalBilling

UMCHospitalBilling

Passive Enterprise Master Person Index

Documentation Orders

Specialty SystemsPACS

Enterprise Clinical Data Repository

ERP - Finance

ERP ndash Human ResourcesPayroll

ERP ndash Materials Management

Enterprise Business Decision Support

Active Enterprise Master Person Index ()

Doc Imaging

Ancillaries

Electronic Medical Record

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 35: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Free Consulting

Where would you focus your efforts Year 1 What is the weakness of the IR Vision

Picture What projects would contribute to the

creation of lsquoSystemnessrsquo How could you break down the lsquoUs and

Themrsquo barriers rampant in IR personnel

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 36: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

What Really Happened

The Glue (NOT the MissionVision Thang) List of proposed projects budgets and

timelines supporting vision and goals of the organization

The technology organization needed to successfully deliver these projects

Governance structure capable of implementation and enforcement

lsquoSystemnessrdquo ndash Create a seamless experience for physicians and patients across our clinical delivery enterpriserdquo

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 37: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

lsquoSystemnessrdquo ndash Create a seamless

experience for physicians administrators and patients across our clinical delivery enterpriserdquo

To operate as one unified University Health System for our patients and faculty

OVERALL BUSINESS VISION

To improve patient and physician service as put forth in the Clinical Services Initiative

CURRENT BUSINESS STRATEGY

To achieve the financialoperational sustainability of Zale Lipshy amp St Paul University Hospitals

To provide our faculty with world-class IT to improve patient safety amp clinical quality

OVERALL INFORMATION RESOURCES VISION

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 38: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

UTSW Health System IR Strategic Plan Total Cost $9712528600

I Hospitals - FinancialRevenue Cycle $702300000 Optimize Revenue Cycle amp Select Scheduling $470000000 Implement Scheduling at Hospitals $140000000 Select and Implement Staff Scheduling System $43100000 Upgrade Kronos Time and Attendance System $49200000

II Ambulatory Services - FinancialRevenue Cycle $455200000 Continue Epic Rollout in Ambulatory Services $249600000 Health System Select amp Implement EMPI across Health System $205600000

III Hospitals - Clinical $2750100000 St Paul Results to OACIS CDR $5000000 Develop Enterprise Clinical Systems Strategy $49600000 Consolidate Lab Systems Select amp Implement $48800000 Complete PACS Rollout SPUHZLUH $700000000 Implement Core Clinical Suite for Hospitals $1647700000 Implement Replacement Laboratory Information System $64000000 Implement Replacement Radiology Information System $151800000 Standardize on Pharmacy Dispensing System $19200000 Select and Implement Surgery Scheduling System at UMC $64000000

IV Ambulatory Services - Clinical $2055300000 Deploy UT Smart EMR to Ambulatory Services $2055300000

V Health System - Cancer Registry $134628600 Deploy Unified Cancer Registry Application $134628600

V Health System - Administrative Management $915000000 Select ERP System AP GL MM PR HR Budgeting $35000000 Implement ERP for the Health System $880000000

VI Enterprise Decision Support $70000000 Create Clean Hospital Reporting Through TSI $60000000 Create Ambulatory P amp L $10000000

VII Upgrade Campus-Wide Technology Infrastructure $2630000000 Upgrade Non-Standard Cabling Health System-Wide $1100000000 Implement Integrated VoiceData System Health System-Wide $1200000000 ReviewUpdate Security Program $330000000

TheList

Our CEO

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 39: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

8 IR Strategic Priorities For Yr 1Hospitals Optimize Revenue Cycle amp Implement Hospital Scheduling ($615M)

Hospitals Create Clean Hospital Reporting Through TSI Optimization amp Standardization ($06M)

Ambulatory Create Improved P amp Ls ($100K)

Health System Develop Comprehensive ERP (Finance HR Payroll Supply Chain) Bid ndash ($350K)

Health System Upgrade Infrastructure For Phones Cabling amp Networking ($493M)

Ambulatory UT Smart Medical Record Registration amp Scheduling Rollout ($20M ndash Already Funded)

Hospitals Continue Expansion of Clinical Data Repository to Include Reporting From SPUH ($50K ndash Already Funded)

Health System Implementing Campus-Wide Cancer Registry ($13M)

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 40: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Health System Infrastructure PlanPROJECT 1 Phones

New Phone PBX System For University SPUH amp ZLUHbullCurrent equipment is at end of lifecycle and becoming unreliable for service needs and anticipated growthbullZLUH is a node off of Parkland system that Perot will charge us for

PROJECT 2 Cabling

Upgraded Cabling In Every Building To Support High Speed ConnectionbullCurrent building network cabling and network closets are inadequate to support industry standard high-speed network connection and to meet demands of Internet2 PACS and other bandwidth intensive applications

PROJECT 3 Secure Redundant Campus Network

Redundant Tiered Network To Safeguard University ResourcesbullCurrent network does not provide adequate securityredundancy to protect network resources into future

PROJECT 4 Consolidate amp Upgrade Data Centers For Health System

Upgrade data center for Health System with 24X7 operations modelbullConsolidate UMC data centers into UTSW data center and upgrade technology to allow 24X7 network operations model necessary for ERP amp clinical systems

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 41: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Revenue Cycle Patient Access Optimization

Redesign our front-end and back end business processes with associatedconfiguration of existing information systems and implementation of new scheduling system to promote more accurate registration increased charge capture improved cash collections and timely billing and reimbursement

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

Siemens InvisionSoftmed HIM SuiteNew Scheduling SystemNew Document Imaging For Hospitals

BUSINESS UNITS INVOLVED

Admitting Medical Records BusinessOffice Pre-Registration All HospitalDepartments Performing Scheduling

$615MPROJECT OWNER

CFO Health System

INTERNAL IR RESOURCES

Siemens Resources (3)Softmed Resources (2)Interface Resource (1)Technical Resource (1)

ADDITIONAL RESOURCES

Project Manager (1)Front-End Process Expert (1)Scheduling Specialist (1)HIM Re-Design Expert (1)Document Imaging Expert (1)Siemens Resource (1)

TECHNOLOGY COSTS

Siemens ZLUH UpgradeConversionNew Document Imaging System

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 42: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Develop Health System ERP Strategy

Work with University administrative departmentsand Health System leadership to determineappropriate information system solution(s) tomeet both administrative needs of Universityand management needs of clinical practiceSystem functional requirements will bedetermined vendors evaluated and systemrecommendation will be made with ROI justification

PROJECT DESCRIPTION

TARGETED INFORMATION SYSTEMS

OAS Administrative SystemSiemens GLAPESI Materials ManagementADP Human ResourcesNew ERP System

BUSINESS UNITS INVOLVED

University Finance Human ResourcesMaterials Management HospitalFinance HR amp Materials Management

$300KPROJECT OWNER

CFO UniversityCFO Health System

INTERNAL IR RESOURCES

OASHRMS Director (1)Hospital Apps Director (2)

ADDITIONAL RESOURCES

Project Manager (1)Finance Expert (025 FTE)Human Resources (025 FTE)Materials Management (025 FTE)

TECHNOLOGY COSTSNone

INTERNAL UTSW RESOURCES

Finance Analyst (1)Human Resources Analyst (1)Materials Management Analyst (1)

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 43: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The Information Resources Organization

CIOVP For Information

Resources

Telecommunications

Client Services

Hospital IT Ambulatory IT

Network Services

Medical TV

AdministrativeComputing

330Employees$55M Operating Budget4 of Institution Operating Budget (12b)

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 44: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Restructured IT Department

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 45: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Governance

French Infantryman (Pantalon Rouge)

German MachineGun Crew

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 46: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

The IT Governance Landscape

Defined governanceScope (what is being governed What is not being governed)Who makes the decisionWho has inputWho enforces the decisionGovernance mechanisms Governance style

Consolidation of redundant governance structures to match lsquosystemnessrsquo theme

Introduction of the Project Management Office with standard IT project reportingtime reporting framework

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 47: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Successes

Revenue cycle reworked in re-implemented in record time Hospitals at break-even with slight profit Consolidated billing system increased professional fee revenues

De-install unsafe electronic medical record VoIP with wireless installed Campus infrastructure upgraded Cancer registry implemented (avoided de-certification) St Paul integrated into UT Southwesternrsquos patient data warehouse

and master person index Information Resources reorganized New data center operational

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 48: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Not So Success

ERP discovery phase doubled Culture clash of University and Health System

Old clinical system governance still in place Now ineffective

Allocation of costs a continual issue Slows IT projects

Strategic Plan scope creep Organizational capacity to change

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 49: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Remember Mitznerrsquos Strategy TypesCreate Health SystemFinancial TurnaroundPtDr SatisfactionSystem Wide EMRzHealth System ERP

Focus on hospital financial systems cleanupIR Reorg

Department initiatives growth of outreach new outpatient buildingDisaster recovery new business model

EMR postponed

Health System CreatedFinancial TurnaroundUniversity wide ERPSlow EMR

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 50: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Planning Pitfalls

Commitment at the Top(ldquoWherersquos the moneyrdquo)

Commitment Lower Down(Planning for others lowers productivity and satisfaction)

Decentralized Planning(Itrsquos my PampL and those pesky spontaneous strategies)

Too Many Planning Constraints(A wired plan is no plan)

Deterministic vs Contingency Planning(Planning for multiple scenarios)

Bad Data(Too aggregated limited scope too late unreliable)

Understanding governance and the political will to change Bad pictures

(Show causal drivers Read Tufte)

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 51: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

10 Ten Issues Reduced tax revenues will lead to continued

cutbacks

Security will drive the re-centralization of the IT organization and governance

LTE and reduced latency will drive delivery of true applications to cellular

Retro-fitting cellular infrastructure

How will we deal with the lsquoCloudrsquo

Antiquated IT organization structure and processes

Control of mobile devices and the further dispersion of corporate information

Dependency on vendor supplied software reduces ability to innovate

Analytics will be the lsquonew frontierrsquo

The rise of the Project Management Office

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues
Page 52: The DIY Information Technology Strategic Plan Kirk Kirksey, Vice President for Information Resources UT Southwestern Medical Center Adjunct Professor,

Questions

  • Slide 25
  • Slide 26
  • Slide 40
  • Slide 45
  • 10 Ten Issues