The Design Process
-
Upload
gold-coast-horse -
Category
Documents
-
view
218 -
download
0
description
Transcript of The Design Process
![Page 1: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/1.jpg)
The Design Process
Thursday, 10 March 2011
![Page 2: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/2.jpg)
The design process is:
•Creative problem solving
•It describes the sequence of events which lead to the solution of a given design problem
•The process is similar to all design professions
Thursday, 10 March 2011
![Page 3: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/3.jpg)
The journey is:Accept the situation
Analyse the problem and get all the facts
Define the goals
Generate options
Select from the options
Implement
Evaluate
Thursday, 10 March 2011
![Page 4: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/4.jpg)
Equestrian Property’s designers journey:Accept the project
Research and analysis
Design Concept
Construction drawings (if necessary by others)
Construction
Post- construction evaluation
Thursday, 10 March 2011
![Page 5: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/5.jpg)
What you’ll need:•Base plan
•Site inventory and analysis plan(covered in future blogs)
•Concept drawings(sketch design plans)
•Design development drawings
•Construction plans(by others if necessary)
Thursday, 10 March 2011
![Page 6: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/6.jpg)
How do I get a base plan?:
•See if you have a survey plan with the documentation that came with the purchase of your property.
•Make your own with help from
•local government website
•Google Earth
•Measure it up yourself
•Surveyor
Thursday, 10 March 2011
![Page 7: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/7.jpg)
What do I record on a base plan?:
•All boundaries and buildings
•All windows and doors/views out/access
•Driveways/paving to remain
•All fences to remain
•All plants and trees to remain
Remember to make a copy of your base plan so you always have a blank copy.
Thursday, 10 March 2011
![Page 8: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/8.jpg)
What do I record on site inventory-analysis plan?:
•All boundaries and buildings
•All windows and doors/views out/access
•Driveways/paving/fencing/infrastructure to remain /to remove(don’t forget access to water-taps)
•All vegetation to remain/to remove
•Any microclimate issues! !
•Circulation
•Soil type
Thursday, 10 March 2011
![Page 9: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/9.jpg)
What do I record on site inventory -analysis plan?:
•Topography
•Drainage
•Problems/potential
•Location of neighbouring properties
•Views in/out
•Access pedestrian/vehicular/float/truck
•North point
•Climate
Thursday, 10 March 2011
![Page 10: The Design Process](https://reader034.fdocuments.net/reader034/viewer/2022051219/568bd4fe1a28ab203496d3ad/html5/thumbnails/10.jpg)
What do I record on a concept/sketch plan:
•Your Title
•Existing features to be retained or removed
•General design ideas
•Sketches, ideas from magazines and books, before and after sketches,
•North point
•Scale
•Legend
Thursday, 10 March 2011