The Concurrent Worlds of Virtual Design and Construction
Rocky Mountain Region
3
Learning Objectives
The business drivers of capital projects will require us to
develop more effective strategies for managing cost,
quality and schedule.
Design and Construction technologies are changing at a
rapid pace. The industry has a great opportunity to
capitalize on this with new approaches and strategies
Integrated project delivery methods such as Design Build
are the most opportunistic in terms of capitalizing on
technological advances
As technology advances we must adapt to the new tools
with new processes
Rocky Mountain Region
Consider the momentous event in architecture when the wall parted and the column became
Louis Kahn, Architect
Rocky Mountain Region
Neolithic construction
• For personal use• Rituals• Local materials
and labor• Unskilled craft
Rocky Mountain Region
Copper and Bronze Age
• Egyptianso Professional labor,
respectedo Drawings on clay tabletso Primitive technology
• Greekso Stone columns and lintelso Pulleys, jibs and craneso Survey skillso Recognition of the
architecto Skilled labor
Rocky Mountain Region
Romans• Organization of Labor
• Hydraulic lime mortar
• Concrete
• Arches
• 100 ton cranes
• Technology
• Trade guilds
• Slaves
• Speed of construction
Rocky Mountain Region
Dark Ages – Western Europe
• Loss of knowledge
• Loss of organized labor
• Religion as a unifying labor element
Rocky Mountain Region
Medieval Romanesque thru Gothic
• Brick, stone
• Master crafts with apprenticeship
• Paid, skilled labor
• Fortifications and religious bldgs.
• drawings on parchment or tracing floor
• Pile driver around 1500
• Tall spaces, thin walls, flying buttresses
Rocky Mountain Region
Renaissance
• Water powered timber mills
• Fired bricks, standards for size
• Early use of iron
• Rebirth of architect, classical design
• Guilds of paid craftsmen
• Patrons from the mercantile class
Rocky Mountain Region
The Duomo – 1436Brunelleschi
Engineering
Construction
Technology
Design
DesignBuild
Rocky Mountain Region
17th, 18th, 19th centuries• 17th century
o Plate glass
o Plumb bob, squares, level, drafting compass
• 18th century
o Cast/wrought Iron hangers, columns, machine cut nails
o Imported materials
• 19th century
o Steel, transportation,
o Engines
o Large capital projects
• AIA 1857 – elevates the profession
o 1889 – Louise Bethune, 1st woman architect in AIA
o 1888 Standardized contracts
Rocky Mountain Region
Industrial Revolution
• Mass production• Decorative architecture• Steel wire• Bessemer steel • Engineering• AGC 1918
Rocky Mountain Region
20th century
• Skyscrapers• Curtain wall• Life Safety Codes• Age of Associations• Separation of Services• Spearin Doctrine• Unions• Davis Bacon• Job Safety• Adversarial relationships• CAD
Rocky Mountain Region
The Design and Construction industry has fallen behind all other industries except agriculture in its investment in and implementation of technology NIST
21st c. (just getting there)
Rocky Mountain Region
Tools of the trade
Stick in the dirt CAD to BIM to VDC
T Square, mylar, plastic leads, Sepias, wash-off’s
Etch-a-sketch, graphite
Ink on linen
Lead on parchment
Design Evolution
Scratches on slate
Rocky Mountain Region
Tools of the Trade
Kneaded Erasers
Rocky Mountain Region
Blueprints
Rocky Mountain Region
Labor Intensive
Rocky Mountain Region
Blue Lines - Reproduced
Rocky Mountain Region
Early CAD
Rocky Mountain Region
Black Lines - Printed
Rocky Mountain Region
Visualization, Problem Solving Tools
Rocky Mountain Region
Building Models with Intelligent Information
Rocky Mountain Region
Better BIM/VDC Integration - Concurrence
• Commissioning• Operations• Maintenance• Disaster planning• Asset management• Facility management• Big Data
• Work Plan• Site logistics• Field mobility• Quality assurance• Quality control• Fabrication• Automation
• Constructability• Coordination• Quantity take-off• Scheduling• Safety Planning
• Execution Plans• Level of Detail• Visualizations• Analytics• Plans/Specs
Rocky Mountain Region
Knowledge Management
Rocky Mountain Region
Building Information Life Cycle
A NEED ID’d
How is information to be maintained and managedover the life of the project?
What Information?
End of life Re-purpose – loftOperate Asset - warehouse
Design ConstructionFinanceBuyer
Owner or User
Rocky Mountain Region
Information Life Cycle
Finance Design Operate RetireNeed Construct Repurpose
At each touch point there is a potential for information loss and lost productivity
OPTIMIZED INFORMATION INTEGRATION Increased Value/
ProductivityIntegrated Model
Non Integrated Model
Rocky Mountain Region
Friction and failure occur on the edges of contracts
OperationsSilo
DesignSilo
ConstructionSilo
Contracts that assume failure
Fees inadequate for optimization
Expenses – Waste, inefficiency
Bad Behavior Risk unbalanced
Friction around the edges
Rocky Mountain Region
Contracts that assumeSuccess and Incentivize
to achieve it
Contracts that recognizeThe paradigm shift of scope
OperationsDesign Construction
The integrated High Performance Team
Rocky Mountain Region
Greg’s Top 10 Disrupters to silo’d Design and Construction
Rocky Mountain Region
Computational/Parametric Design
Rocky Mountain Region
Design to Fabrication
LaborDeliverables
ContractsFee Structures
Risk
Rocky Mountain Region
Rapid Prototype Printing
Rocky Mountain Region
Field Mobility
Rocky Mountain Region
Leverage of Mobile Apps
Rocky Mountain Region
New Generations of Workers
Rocky Mountain Region
Data Driven Productivity
???
Rocky Mountain Region
Cloud Driven Transformations
Rocky Mountain Region
Profit Driven Analytics
Rocky Mountain Region
Reality Capture
Rocky Mountain Region
My I’s(Required for maximizing the value of concurrent design and construction)
Rocky Mountain Region
Intuitive
Rocky Mountain Region
Integration
Rocky Mountain Region
Interoperability
Rocky Mountain Region
Innovation
Rocky Mountain Region
and Finally………….Incentives
OwnerArchitectEngineer
TradesSuppliers
BuilderOperator
FinanceUsers
CONCURRENT
VDC
Rocky Mountain Region
New times require new thinking.You have an eternity to think inside the box
Open for Discussion