    TheconceptplanREPORTMATERIAL

    Executivesummaryoftheproject

    a.General

    understanding

    on

    ToR

    along

    with

    Design

    Concept

    (includefollowing)

    3.1backgroundinformation

    b.Reasonsforthisproject(includefollowing)

    3.2TDAPsNeeds,goalsandobjectives

    a.

    b.

    i)

    ii)

    iii)

    iv)

    v)

    vi)

    c.Methodologyforexecutingtheproject

    1. Submission of conceptplan alongwith the consultants/firms technical and financialproposal

    2. Executionofagreements3. Carrying/arrangingdetailedtopographicsurveys,soilinvestigationsoftheavailablesite4. Developing detailed master / land use plan as per user requirements and site

    configurations

    5. Submissionofthedraftandfinalplan6. Executionofworkonsitedevelopmentandestablishingasiteoffice7. Laying and providing of basic infrastructure services like, road, electricity, water,

    drainage,boundarywall,etc.

    8. Constructionofadministrativebuildings,andfrontoffices9.

  • 7/28/2019 The Concept Plan - 04 April 13

    2/5

    10.11.12.

    d.MainFeaturesoftheConceptPlan3.3serviceareaanditsdynamics (includehere)

    Theoverallconceptoftheplan isbasedonclustersystemofdifferentactivityareas,whichultimately

    createsavaluechainframeworkofallactivities.However,thefocus ispaidonsmooth interflowofall

    activities.Forthismaximum,effortisputtokeeptheplansimpleandaffordabletoachievetheoverall

    goals.Main features include the zoning of different activities according to their function, size and

    locationofallfacilitiesaccordingtonormalstandardsoflanduseplanning.

    The settingofbuildingshasbeenplacedand locatedaccording to their functional requirementsandnatureaswellasheightzoningregulations,suchasthetowerareahasbeenproposedatthebacksideofoverallplantogainmaximumheightpermission.

    Functionally, all the activities have their own importance and impact on the overall project. Each

    building/activityprovidedanddesignedwillcauseaneconomicgenerationatitsend.So,intheconcept

    plan, it isconsideredvitalto locatealltheactivitiesaspertheiruseand importance.Banksandother

    small services and shops are located near/ along themain cargo road to provide services all on a

    windowbasis.Then, locationofadministrativesetup,displayarea,and labs/skilldevelopmentcenters

    havebeen

    located

    in

    same

    line

    to

    provide

    aharmony

    and

    rhythm

    in

    use

    and

    services

    provided

    by

    these

    activities.

    Then,locatedattheendarethetowerareaandgemsandjewellerymanufacturingarea.If itbecomes

    possible, two towerswill be designed and built to accommodate space formaximum services and

    activitiesinsteadofone.

    The location of tower(s) is planned in such away as to avoid any height zoning laws andhas been

    elaboratedthroughasimplelinecharttoprovidemaximumrelaxationinheightstandards.

    And,intheend,investorsenclaveareahasbeenlocatedatthewesterncornertoavoidanynoiseand

    airpollution

    from

    the

    business

    and

    commerce

    areas.

    Accordingtotheuseandfunctionofvariousactivities,subdivisionhasbeenmadeinfollowingmanner:

    1. TheAdminareawill include facilities to support theactivities toadministrativeauthoritiesofthearea,office forTradedevelopmentAuthorityofPakistan (TDAP)andother suchactivities

    whichcreatecoherencebetweenallthestakeholdersatthesametime.Itslocationissuchthat

    alltheadjoinservicesandactivitiescanbecontrolledandexecutedsmoothly.

  • 7/28/2019 The Concept Plan - 04 April 13

    3/5

    2. The investorsenclaveareacoversabout13.09%ofoverallproject,and is locatedaway frombusiness and commercial areas to provide calm and clean environment to the endusers.

    Investors area, as per the requirement of the user, includes residential rooms, recreational

    facilities,meetinghalls, swimmingpool, and stateof the art facilities for social andbusiness

    purposes.

    3. Provision of open spaces and green spaces has been considered as perminimum requiredstandards and requirements. It covers about 1.75 % of whole the project area, excluding

    investorsenclavearea.Hence,maximumspacehasbeenutilizedforbusinessandcommercial

    relatedactivities.

    4. Provisionof security services at twomain entranceshasbeen located to ensure safety andcompletevigilantoverentrantsandoutsiders.Each securitypostwill include living rooms for

    ondutystaff,officerooms,andwaitingareasforvisitors.Alongwiththis,spaceforpolicecheck

    post has also been provided for better and effective coordination among various security

    factors.Furthermore,smallwatch towerswillbeprovidedatall thecornerpointsaround the

    planned area. In addition to above, security cameras and lights will also be installed for

    controlledsystem

    of

    all

    activities

    in

    and

    around

    the

    project

    structures.

    5. Aseparateservicesareahasbeenplannedto includewatersupplyservices likeUndergroundTank,Overhead tank,PumpHouse,GeneratorRoom, fire fighting services,police checkpost,

    etc.Thisareawillalsoincludeanyfuturerequirementasandwhenitarises.

    6. Towerareawillbedesignedtoaccommodateanumberofsmallactivitiesrelatedtoeachotherandalsosupportingtomajoractivities.Theactivities includedwillbe likemanufacturing,man

    power requirement, courier services, legal services, printing spaces, restaurants, insurance

    services,travelagents,financialservices,etc.

    7. The display area will include all the facilities for commonbonded ware house for gems,conventioncentre, food/beverageoutlets,exhibitionshalls,multimediaservices,auditoriums,

    andpresentationhalls.Theplotssizeswillvaryprovidingmultidimensionalactivitiesrelatedto

    eachotherontheuseandfunctionalbasis.Variationinplotsizeswillalsoprovideoptionstothe

    businessandtraderelatedfirmsaccordingtotheirproductiontypeandquantity.

    8. Parking areas have been provided in three segregated parts to avoid any congestion andovercrowdinginthearea.Itwillalsoprovidestrongvigilancesystemonincomingandoutgoing

    traffic.Inthetimesofemergency,itwillalsobeaneasygameforthecontrollingauthoritiesto

    executethetrafficmatters.

    Aboveall,mainobjectivesof theplanning i.e.comfort,safety,cleanand calmenvironmenthasbeen

    cateredin

    the

    conceptual

    plan.

    The

    location

    of

    project

    site

    through

    Google

    map

    has

    been

    demarcated

    andisattachedhere.

  • 7/28/2019 The Concept Plan - 04 April 13

    4/5

    Conceptplanshowingvariouslanduses

  • 7/28/2019 The Concept Plan - 04 April 13

    5/5

    e.ThelanduseclassificationAccording the initial analysis of the user requirements and site location, all land use categories are

    allocatedroughly.Thedetailedlanduseclassificationisasunder:

    S.NO. Landuseclassification Areainsqft Area inacres

    Percentage01 Admin/TDAParea 33699.56 0.773 4.75

    02 Greenspaces 12474.03 0.286 1.75

    03 Displayarea 25980.76 0.596 3.66

    04 Lab/trainingarea 31859.98 0.731 4.49

    05 Investorsenclavearea

    (MEETING ROOMS, GYMNASIUM,

    SWIMMING POOL, 50ACCOMMODATION

    ROOMS,ETC)

    92907.96 2.13 13.09

    06 Commercial/banksarea 57693.38 1.32 8.11

    07 Stone

    Cutting/polishing/manufacturing/jewellery

    makingarea

    25980.76 0.596 3.66

    08 Towerarea 25980.76 0.596 3.66

    09 Parkingarea 74402.02 1.708 10.49

    10 Servicesarea

    (DG ROOM, WATER TANKS, FIRE

    FIGHTING,POLICECHECKPOST,ETC)

    10891.55 0.250 1.53

    11 Securityarea 4628.8 0.106 0.65

    12 Roads/footpaths/setbacks/,etc. 312673.68 7.178 44.11

    TOTAL 708820.59 16.27 100

    f.Designphases

    1. Submissionandapprovalofconceptplan2. Topographicsurveyandsiteanalysis3. Developingdraftplananditssubmission4. Developingfinalplanalongwiththereport

    Conceptchart ?????