THE CLOISTER OWNERS ASSOCIATION Slab Raising Capital Expenditure History January 2005 through September 2016 Date Contractor Address Description Amount Unit Total 3/21/12 CHARLES HILTON 202 Miles 202 MILES-CONTIN INVESTIGATION/OBSERVATION OF FLOOR/FOUNDATION/POWERLIFT MEASUREMENTS/OBSERV/DIS... $90 4/4/12 CHARLES HILTON 202 Miles FOUNDATION/SLABS/WALLS/CEILINGS/REPORTS FOR: 209, 233 CANA & 202 MILES $40 4/26/12 CHARLES HILTON 202 Miles Contractor's proposals for foundation repairs at 202 Miles & 233 Cana $45 5/2/12 CHARLES HILTON 202 Miles 233 CANA & 202 MILES- SCHED REPAIRS AT NOTIFY RESIDENTS RE: UNIT FOUNDATIONS $30 5/10/12 CHARLES HILTON 202 Miles Foundation repairs/Powerlift: 233 Cana, 202 Miles $105 6/1/12 POWER LIFT 202 Miles Ct. 202 MILES CT.- 5 STEEL PIERS $4,500 202 Miles Court Total $4,810 9/24/08 CHARLES HILTON 205 Cana 210 & 205 CANA-RECHECK W/CONTRACTOR CONDITION/ELEVATIONS OF $45 10/1/08 CHARLES HILTON 205 Cana 208-210 & 205 CANA-CONTRACTOR ADJUSTED PIERS $35 205 Cana Circle Total $80 1/4/05 CHARLES HILTON 206 Miles 206 MILES-ASSIST POWERLIFT W/LIFTING/STABILIZING SLAB $862 1/13/05 H & T Carpets, Inc. 206 Cana 206 Cana-carpet work due to slab raising by PowerLift $75 2/3/05 POWER LIFT 206 Miles 206 MILES - MUD JACKING, CONCRETE DEMO'S,15 REG. PIERSS $17,125 4/20/05 CHARLES HILTON 206 Miles 206 MILES-DISCUSS W/CONTRACTOR WARRANTY OF SLAB REPAIRS, ETC. $45 10/23/08 CHARLES HILTON 206 Miles 206 MILES-COSMETIC REPAIRS AT REAR DOORS (SLAB REPAIRS) $449 7/10/14 CHARLES HILTON 206 Miles 206 Miles-continuing discussion w/Bruce Little of problems & possible solutions $0 7/10/14 CHARLES HILTON 206 Miles 206 Miles-continuing discussion w/Bruce Little of problems & possible solutions $90 11/20/14 CHARLES HILTON 206 Miles 206 MILES-FLOOR/FOUNDATION-REQUESTED,OBTAINED,FORWARDED TO BOARD CONTRACTORS REQUIREMENTS FOR AD... $90 2/12/15 CHARLES HILTON 206 Miles 206 Miles-unit foundation/floor-scheduled access, measurements, drilling of floor, etc. $130 2/19/15 CHARLES HILTON 206 Miles 206 MILES-FOUNDATION/FLOOR- PRE REPAIR INSPECTIONS, MEASUREMENTS, ETC. $145 3/5/15 CHARLES HILTON 206 Miles 206 Miles-foundation repairs $160 3/12/15 CHARLES HILTON 206 Miles 206 Miles-foundaton, floors, garage, patio, stoop/ flooring contractor/ paint & drywall contractor $145 3/19/15 CHARLES HILTON 206 Miles Misc Labor & Services: foundations, floors, cosmetic: 206 Miles, 408 Siena, 410 Siena $53 4/9/15 CHARLES HILTON 206 Miles 206 Miles-foundation repairs: exterior wood repairs, drainage, soil fill, etc $110 Page 1 of 14

Transcript of THE CLOISTER OWNERS ASSOCIATION Slab Raising Capital ... · 206 MILES-FOUNDATION/FLOOR- PRE REPAIR...

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

Date Contractor Address Description Amount Unit Total

3/21/12 CHARLES HILTON 202 Miles202 MILES-CONTIN INVESTIGATION/OBSERVATION OF

FLOOR/FOUNDATION/POWERLIFT MEASUREMENTS/OBSERV/DIS...$90

4/4/12 CHARLES HILTON 202 MilesFOUNDATION/SLABS/WALLS/CEILINGS/REPORTS FOR: 209, 233 CANA & 202

MILES$40

4/26/12 CHARLES HILTON 202 Miles Contractor's proposals for foundation repairs at 202 Miles & 233 Cana $45

5/2/12 CHARLES HILTON 202 Miles233 CANA & 202 MILES- SCHED REPAIRS AT NOTIFY RESIDENTS RE: UNIT

FOUNDATIONS$30

5/10/12 CHARLES HILTON 202 Miles Foundation repairs/Powerlift: 233 Cana, 202 Miles $105

6/1/12 POWER LIFT 202 Miles Ct. 202 MILES CT.- 5 STEEL PIERS $4,500

202 Miles Court Total $4,810

9/24/08 CHARLES HILTON 205 Cana 210 & 205 CANA-RECHECK W/CONTRACTOR CONDITION/ELEVATIONS OF $45

10/1/08 CHARLES HILTON 205 Cana 208-210 & 205 CANA-CONTRACTOR ADJUSTED PIERS $35

205 Cana Circle Total $80

1/4/05 CHARLES HILTON 206 Miles 206 MILES-ASSIST POWERLIFT W/LIFTING/STABILIZING SLAB $862

1/13/05 H & T Carpets, Inc. 206 Cana 206 Cana-carpet work due to slab raising by PowerLift $75

2/3/05 POWER LIFT 206 Miles 206 MILES - MUD JACKING, CONCRETE DEMO'S,15 REG. PIERSS $17,125

4/20/05 CHARLES HILTON 206 Miles 206 MILES-DISCUSS W/CONTRACTOR WARRANTY OF SLAB REPAIRS, ETC. $45

10/23/08 CHARLES HILTON 206 Miles 206 MILES-COSMETIC REPAIRS AT REAR DOORS (SLAB REPAIRS) $449

7/10/14 CHARLES HILTON 206 Miles 206 Miles-continuing discussion w/Bruce Little of problems & possible solutions $0

7/10/14 CHARLES HILTON 206 Miles 206 Miles-continuing discussion w/Bruce Little of problems & possible solutions $90

11/20/14 CHARLES HILTON 206 Miles206 MILES-FLOOR/FOUNDATION-REQUESTED,OBTAINED,FORWARDED TO

BOARD CONTRACTORS REQUIREMENTS FOR AD...$90

2/12/15 CHARLES HILTON 206 Miles206 Miles-unit foundation/floor-scheduled access, measurements, drilling of floor,

etc.$130

2/19/15 CHARLES HILTON 206 Miles206 MILES-FOUNDATION/FLOOR- PRE REPAIR INSPECTIONS,

MEASUREMENTS, ETC.$145

3/5/15 CHARLES HILTON 206 Miles 206 Miles-foundation repairs $160

3/12/15 CHARLES HILTON 206 Miles206 Miles-foundaton, floors, garage, patio, stoop/ flooring contractor/ paint & drywall

contractor$145

3/19/15 CHARLES HILTON 206 MilesMisc Labor & Services: foundations, floors, cosmetic: 206 Miles, 408 Siena, 410

Siena$53

4/9/15 CHARLES HILTON 206 Miles 206 Miles-foundation repairs: exterior wood repairs, drainage, soil fill, etc $110

Page 1 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

4/9/15 CHARLES HILTON 206 Milesfoundation repair/final elevation measurements: 206 Miles, 288 Cana, 426 Siena,

408 Siena, 410 S...$25

2/26/15 CHARLES HILTON 206 Miles 206 Miles - floor/foundation, etc. $105

4/2/15 CHARLES HILTON 206 Miles 206 Miles - foundation repairs $110

4/23/15 CHARLES HILTON 206 Miles 206 Miles -foundation related - continuing $65

4/1/15 H & T Carpets, Inc. 206 Miles Ct. 206 Miles Ct.- pad & relay carpet/laminate labor/take up parquet floor $2,339

4/1/15 POWER LIFT 206 Miles Ct. 206 Miles Ct. - 21 Steel Piers, 8 concrete demos, 1 mud-jacking $22,200

206 Miles Court Total $44,323

12/21/06 CHARLES HILTON 207 Cana 207 CANA-COSMETIC REPAIR FROM MINOR SLAB SETTLING $284

$284

9/1/05 CHARLES HILTON 208 Cana 208 CANA-SLAB SETTLING $90

9/8/05 CHARLES HILTON 208 Cana 208/210 CANA-SLAB SETTLING $90

9/15/05BELLE MEADE

CONTRACTORS208 Cana 208/210 CANA-CONCRETE WORK AT FRONT DOOR PAD $200

9/15/05 CHARLES HILTON 208 Cana 208/210 CANA/407 SIENA-SLAB SETTLING $45

10/5/05 POWER LIFT 208 Cana 208-210 CANA-CONCRETE DEMO/11 PIERS $5,100

10/1/08 CHARLES HILTON 208 Cana 208-210 & 205 CANA-CONTRACTOR ADJUSTED PIERS $35

7/15/10 CHARLES HILTON 208 Cana FOUNDATION/SLAB-POWER LIFT: 208-210 CANA, 413 SIENA, 412 SIENA $34

208 Cana Circle Total $5,594

3/30/05 CHARLES HILTON 209 Cana 209 CANA-CK. RECORDED ELEVATION ON SLAB $60

7/7/05 CHARLES HILTON 209 Cana 209 CANA-SLAB MOVEMENT REPAIRS $146

7/14/05 CHARLES HILTON 209 Cana 209 CANA-SLAB MOVEMENT REPAIRS $146

6/21/06 CHARLES HILTON 209 Cana FOLLOW UP W/POWER LIFT-209 CANA,412 SIENEA,424 SIENA $45

7/5/06 CHARLES HILTON 209 Cana 209 CANA,412 & 424 SIENA-SLAB/FOUNDATION REPAIRS $75

4/18/07 CHARLES HILTON 209 Cana 209 CANA-SLAB/FOUNDATION, OWNER REQUEST FOR NO $578

4/25/07 CHARLES HILTON 209 Cana 209 CANA-SCHED./CK. INTERIOR COSMETIC REPAIRS $90

3/8/12 CHARLES HILTON 209 Cana209 CANA- FOUNDATION INVESTIGATION/MET W/POWERLIFT & OWNER

REP/MADE NEW FLOOR ELEVATION MEASUREM...$70

3/15/12 CHARLES HILTON 209 Cana 209 Cana- further investigation, Tony Locke $90

3/15/12 CHARLES HILTON 209 Cana 209 Cana-shedule Power Lift investigation/further foundation investigation $45

3/21/12 CHARLES HILTON 209 Cana209 CANA-CONTIN INVESTIGATION/OBSERVATION OF

FLOOR/FOUNDATION/POWERLIFT ADDITIONAL MEASUREMENTS/$140

4/4/12 CHARLES HILTON 209 CanaFOUNDATION/SLABS/WALLS/CEILINGS/REPORTS FOR: 209, 233 CANA & 202

MILES$40

Page 2 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

6/21/12ANTHONY L. LOCKE,

P.E.209 Cana 209 Cana-structural evaluation of residence $400

2/7/13 CHARLES HILTON 209 Cana 209 CANA-FLOOR/FOUNDATION-RESEARCH,REVIEW,NOTIF., DISCUSS $120

2/14/13JOEL C. WILSON,

CONTRACTOR209 Cana

209 Cana-labor to remove appliances allowing access for interior foundation/floor

repairs$245

2/14/13 CHARLES HILTON 209 Cana209 Cana-floor/foundation-sched removal of appliances/furniture to allow interior

foundation work$175

2/21/13BELLEVUE 1ST

PLUMBING209 Cana 209 Cana-2/14-replaced seciton of 1/2 in copper line damaged under cement slab $88

2/21/13 CHARLES HILTON 209 Cana209 Cana-floor covering repairs (Charlie Hodges)-Specs/discussions/estim for

repair/repl of kitc...$75

2/21/13 CHARLES HILTON 209 Cana 209 Cana-foundation/floor-oversight of foudation/floor repairs $475

2/21/06 CHARLES HILTON 209 Cana 209 CANA /424 SIENA-SLAB/FOUNDATION WORK W/POWER LIFT $45

4/4/13 POWER LIFT 209 Cana Cir 209 CANA CIR- 10 STEEL PIERS $9,000

4/4/13 POWER LIFT 209 Cana Cir 209 CANA CIR- 13 INTERIOR STEEL PIERS $11,700

4/4/13 POWER LIFT 209 Cana Cir- 209 CANA CIR- MUD-JACKING $3,500

4/4/13 POWER LIFT 209 Cana Cir 209 CANA CIR -3 CONCRETE DEMOS $300

4/4/13 POWER LIFT 209 Cana Cir 209 CANA CIR - 1 CONCRETE DEMO $500

209 Cana Circle Total $28,148

9/8/05 CHARLES HILTON 210 Cana 208/210 CANA-SLAB SETTLING $90

9/15/05BELLE MEADE

CONTRACTORS210 Cana 208/210 CANA-CONCRETE WORK AT FRONT DOOR PAD $200

9/15/05 CHARLES HILTON 210 Cana 208/210 CANA/407 SIENA-SLAB SETTLING $45

10/5/05 POWER LIFT 210 Cana 208-210 CANA-CONCRETE DEMO/11 PIERS $5,100

9/24/08 CHARLES HILTON 210 Cana 210 & 205 CANA-RECHECK W/CONTRACTOR CONDITION/ELEVATIONS OF $45

10/1/08 CHARLES HILTON 210 Cana 208-210 & 205 CANA-CONTRACTOR ADJUSTED PIERS $35

7/15/10 CHARLES HILTON 210 Cana FOUNDATION/SLAB-POWER LIFT: 208-210 CANA, 413 SIENA, 412 SIENA $34

10/5/11 CHARLES HILTON 210 Cana 210 Cana-foundation-sched Power Lift followup on front wall foundation problem $60

10/19/11 CHARLES HILTON 210 Cana210 CANA-SLAB/FOUNDATION, POWERLIFT, ADJUSTMENT OF PREV

INSTALLED FOUNDATION PIERS ACROSS FRONT ...$110

8/29/12 CHARLES HILTON 210 Cana Foundation repairs: 210 Cana & 904 Glenmary $90

9/20/12 POWER LIFT 210 Cana 210 CANA-3 STEEL PIERS/1 CONCRETE DEMO/1 MASONRY REPAIR $3,000

Page 3 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

7/28/10 CHARLES HILTON 210 Cana210 CANA--FOUNDATION REPAIR (INSPECT/SHED. REPAIRS/REPAIR OF

PIERS COMPLETED)$90

8/23/12 CHARLES HILTON 210 Cana scheduled foundation repairs: 210, 300, 302 Cana & 904 Glenmary $22

210 Cana Circle Total $8,921

8/11/05 CHARLES HILTON 211 Cana 209 CANA-MEASURE SLAB ELEVATION & MONITOR FOR PROBS $90

1/17/13 CHARLES HILTON 211 Cana211 Cana-foundation-sched inspect/measure floor/foundation w/Bruce Little at

Power Lift/ requeted$105

1/30/13 CHARLES HILTON 211 Cana 211 Cana-foundation/floor-PowerLift, measurements, followup, etc. $105

2/7/13 CHARLES HILTON 211 Cana 211 CANA-FLOOR/FOUNDATION-OBSERVATION $90

2/14/13 CHARLES HILTON 211 Cana 211 Cana-floor/foundation-inspect of completed found./floor repair $110

2/21/13 CHARLES HILTON 211 Cana211 Cana-electrical-secured repair of electrical power supply etc. damaged during

foundation rep...$60

3/14/13 POWER LIFT 211 Cana Cir 211 CANA CIR- 10 STEEL PIERS $9,000

211 Cana Circle Total $9,560

11/1/06 H & T Carpets, Inc. 213 Cana 412 SIENA & 213 CANA-carpet work due to slab work $45

213 Cana Circle Total $45

2/21/13BELLEVUE 1ST

PLUMBING214 Cana 209 Cana-2/14-replaced seciton of 1/2 in copper line damaged under cement slab $88

214 Cana Circle Total $88

6/28/06 CHARLES HILTON 219 Cana 412,424 SIENA/219 CANA-SLAB SETTLING-MET W/STRUCT.ENGINEER $45

219 Cana Circle Total $45

3/21/12 CHARLES HILTON 233 Cana233 CANA-INITIAL OBSERV/SCHED POWERLIFT FOR OBSERV &

MEASUREMENTS/CK OF FLOOR ELEVATIONS/ SCHED/...$110

4/4/12 CHARLES HILTON 233 CanaFOUNDATION/SLABS/WALLS/CEILINGS/REPORTS FOR: 209, 233 CANA & 202

MILES$40

4/26/12 CHARLES HILTON 233 Cana Contractor's proposals for foundation repairs at 202 Miles & 233 Cana $45

5/2/12 CHARLES HILTON 233 Cana233 CANA & 202 MILES- SCHED REPAIRS AT NOTIFY RESIDENTS RE: UNIT

FOUNDATIONS$30

6/1/12 POWER LIFT 233 Cana Cir 233 CANA CIR- 3 STEEL PIERS $2,700

5/10/12 CHARLES HILTON 233 Cana Foundation repairs/Powerlift: 233 Cana, 202 Miles $105

233 Cana Circle Total $3,030

11/16/10 CHARLES HILTON 278 CanaWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

278 Cana Circle Total $20

Page 4 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

11/16/10 CHARLES HILTON 280 CanaWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

280 Cana Circle Total $20

10/23/14 CHARLES HILTON 288 Cana288 Cana-foundation/investigation, determination of extent of problem, needed

repairs, schedulin...$105

11/13/14 CHARLES HILTON 288 Cana288 Cana-foundation repairs: review, discussion, distribution of contractors

estimate/proposal f...$90

11/20/14 CHARLES HILTON 288 Cana288 CANA-FOUNDATION-OBTAINED,PRESENTED CONTRACTORS

PROPOSAL FOR REPAIRS/SCHED REPAIRS & FOLLOW U...$90

4/9/15 CHARLES HILTON 288 Canafoundation repair/final elevation measurements: 206 Miles, 288 Cana, 426 Siena,

408 Siena, 410 S...$25

4/1/15 POWER LIFT 288 Cana Cir 288 Cana Cir.- 8 Steel Piers, 2 concrete demos, 1 tuck-pointing $7,600

288 Cana Circle Total $7,910

8/9/12 CHARLES HILTON 300 Cana 300, 302 Cana- foundation/floor inspections $45

8/23/12 CHARLES HILTON 300 Cana scheduled foundation repairs: 210, 300, 302 Cana & 904 Glenmary $23

9/20/12 POWER LIFT 300 Cana 300 CANA-20 STEEL PIERS/9 CONCRETE DEMOS $18,900

9/6/12 CHARLES HILTON 300 Cana Foundation repairs: 300,302 Cana $90

300 Cana Circle Total $19,058

2/1/06PROFESSIONAL

CARPET SYSTEMS302 Cana 302 CANA-EMERG.WATER EXTRACTION DUE TO DRAINAGE PROBLEMS $325

8/9/12 CHARLES HILTON 302 Cana 300, 302 Cana- foundation/floor inspections $45

8/23/12 CHARLES HILTON 302 Cana scheduled foundation repairs: 210, 300, 302 Cana & 904 Glenmary $22

9/6/12 CHARLES HILTON 302 Cana Foundation repairs: 300,302 Cana $90

9/6/12 CHARLES HILTON 302 Cana 302 Cana-columns/foundation-removed columns & plinths at front entrance to allow $45

302 Cana Circle Total $527

4/5/06 CHARLES HILTON 314 Cana 314 CANA-SLAB/FOUNDATION-INTERIOR COSMETIC REPAIRS $490

314 Cana Circle Total $490

8/18/16 POWER LIFT 402 Siena402 Siena-11 steel piers, 10 interior steel piers, deck removal, patch slab, mud-

jacking$25,250

402 Siena Drive Total $25,250

9/1/05 CHARLES HILTON 407 Siena 407 SIENA-SLAB SETTLING $90

9/8/05 CHARLES HILTON 407 Siena 407 SIENA-SLAB SETTLING $90

9/15/05 CHARLES HILTON 407 Siena 208/210 CANA/407 SIENA-SLAB SETTLING $45

Page 5 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

10/5/05 POWER LIFT 407 Siena 407 SIENA-5 REG. PEIRS $4,500

407 Siena Drive Total $4,725

10/12/05 CHARLES HILTON 408 Siena 408/410 SIENA-EVAL. SLAB/FLOOR/FOUND PROB. $45

11/22/05 CHARLES HILTON 408 Siena 410-408 SIENA-PREP. WORK FOR FOUND./SLAB REPAIRS $90

12/8/05 CHARLES HILTON 408 Siena 408/410 SIENA-FOUNDATION REPAIRS $315

12/8/05 CHARLES HILTON 408 Siena 408/410 SIENA-PREP FOR FOUND. WORK-REMOVE DECK $68

12/21/05 POWER LIFT 408 Siena 408 SIENA-8 REG. PIERS & 1/2 DAY MUDJACKING $8,825

1/4/06 CHARLES HILTON 408 Siena 408 SIENA-SLAB REPAIR $159

3/19/15 CHARLES HILTON 408 SienaMisc Labor & Services: foundations, floors, cosmetic: 206 Miles, 408 Siena, 410

Siena$53

3/25/15Summit Property

Restoration, LLC408 Siena

408 & 410 Siena-pack & move deposit- packing, moving, storage of all contents of

units (for foun...$2,800

4/9/15 CHARLES HILTON 408 Sienafoundation repair/final elevation measurements: 206 Miles, 288 Cana, 426 Siena,

408 Siena, 410 S...$25

5/20/15 Irwin & Irwin 408 Siena408 Siena-interior repairs due to foundation repairs-reset/paint front door/repair

numerous tape...$4,690

5/28/15 H & T Carpets, Inc. 408 Siena 408 Siena- quick step laminate labor, take up carpet, pad & wood $5,356

2/12/15 CHARLES HILTON 408 Siena408-410 Siena-foundation issues/scheduing of observation, measurements,

discussions, & obtaining...$72

2/26/15 CHARLES HILTON 408 Siena 408-410 Siena-floor/foundation- discussions, scheduling, etc. $72

3/5/15 CHARLES HILTON 408 Siena 408-410 Siena-foundation repairs $105

3/12/15 CHARLES HILTON 408 Siena 408-410 Siena- foundation, floors, moving, etc. $45

4/2/15 CHARLES HILTON 408 Siena 408-410 Siena- foundation repairs $62

4/9/15 CHARLES HILTON 408 Siena 408-410 Siena- foundation repair-interior $32

4/16/15 CHARLES HILTON 408 Siena 408-410 Siena- foundation repairs-interior $33

5/20/15 CHARLES HILTON 408 Siena 408-410 Siena- flooring install, drywall repairs, painting, etc $80

6/4/15 CHARLES HILTON 408 Siena 408-410 Siena-foundation related repairs, etc. $37

6/11/15Summit Property

Restoration, LLC408 Siena Dr. final bill on Siena Dr. - 408 & 410 packing, moving & storage of all contents in units $800

408 Siena Drive Total $23,763

7/31/14 CHARLES HILTON 409 Siena 409 Siena-foundation-foundation investigation/scheduling/discussion/etc. $140

9/11/14 CHARLES HILTON 409 Siena 409-411 SIENA-FOUNDATION REPAIRS $70

10/2/14 POWER LIFT 409 Siena Dr 409/411 Siena Dr- 14 Steel Piers/6 concrete demos/mud jacking $8,350

409 Siena Drive Total $8,560

Page 6 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

10/5/05 CHARLES HILTON 410 Siena 410 SIENA-INSPECT. SLAB/FOUNDATION ELEV. MEASURE. $135

10/12/05 CHARLES HILTON 410 Siena 408/410 SIENA-EVAL. SLAB/FLOOR/FOUND PROB. $45

11/22/05 CHARLES HILTON 410 Siena 410-408 SIENA-PREP. WORK FOR FOUND./SLAB REPAIRS $90

12/8/05 CHARLES HILTON 410 Siena 408/410 SIENA-FOUNDATION REPAIRS $315

12/8/05 CHARLES HILTON 410 Siena 408/410 SIENA-PREP FOR FOUND. WORK-REMOVE DECK $68

12/15/05 H & T Carpets, Inc. 410 Siena 410 SIENA-carpet work due to slab raising by PowerLift $75

12/15/05 CHARLES HILTON 410 Siena 410 SIENA-SLAB SETTLING REPAIRS TO INTERIOR $878

12/21/05 POWER LIFT 410 Siena 410 SIENA-7 REG. PEIRS & 1/2 DAY MUDJACKING $7,925

12/21/05 H & T Carpets, Inc. 410 Siena 410 SIENA-carpet work due to slab raising by PowerLift $140

12/28/05 CHARLES HILTON 410 Siena 410 SIENA-SLAB FOUNDATION WORK $199

2/12/15 CHARLES HILTON 410 Siena408-410 Siena-foundation issues/scheduing of observation, measurements,

discussions, & obtaining...$72

2/26/15 CHARLES HILTON 410 Siena 408-410 Siena-floor/foundation- discussions, scheduling, etc. $72

3/5/15 CHARLES HILTON 410 Siena 408-410 Siena-foundation repairs $105

3/12/15 CHARLES HILTON 410 Siena 408-410 Siena- foundation, floors, moving, etc. $45

3/19/15 CHARLES HILTON 410 SienaMisc Labor & Services: foundations, floors, cosmetic: 206 Miles, 408 Siena, 410

Siena$54

3/25/15Summit Property

Restoration, LLC410 Siena

408 & 410 Siena-pack & move deposit- packing, moving, storage of all contents of

units (for foun...$2,800

4/2/15 CHARLES HILTON 410 Siena 408-410 Siena- foundation repairs $62

4/9/15 CHARLES HILTON 410 Sienafoundation repair/final elevation measurements: 206 Miles, 288 Cana, 426 Siena,

408 Siena, 410 S...$25

4/9/15 CHARLES HILTON 410 Siena 408-410 Siena- foundation repair-interior $32

4/16/15 CHARLES HILTON 410 Siena 408-410 Siena- foundation repairs-interior $33

5/14/15 H & T Carpets, Inc. 410 Siena Dr 410 Siena Dr - qick step laminate labor take up flooring $4,874

5/20/15 Irwin & Irwin 410 Siena410 Siena-interior-reset front door, back door, garage entry & planed coat closet

door & paint/ ...$4,915

5/20/15 CHARLES HILTON 410 Siena 408-410 Siena- flooring install, drywall repairs, painting, etc $80

6/4/15 CHARLES HILTON 410 Siena 408-410 Siena-foundation related repairs, etc. $37

4/9/15 POWER LIFT 410 Siena Dr. 410 Siena Dr.- 41 steel piers, 13 steel piers, mud-jacking, rock demo $50,900

410 Siena Drive Total $73,975

9/11/14 CHARLES HILTON 411 Siena 409-411 SIENA-FOUNDATION REPAIRS $70

10/2/14 POWER LIFT 411 Siena Dr 409/411 Siena Dr- 14 Steel Piers/6 concrete demos/mud jacking $8,350

411 Siena Drive Total $8,420

Page 7 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

2/1/06 CHARLES HILTON 412 Siena 424/412 SIENA-SLAB/FOUNDATION/TERMITES $68

2/9/06 CHARLES HILTON 412 Siena 412/424 SIENA-SLAB/FOUNDATION W/POWER LIFT $45

6/21/06 CHARLES HILTON 412 Siena FOLLOW UP W/POWER LIFT-209 CANA,412 SIENEA,424 SIENA $45

6/28/06 CHARLES HILTON 412 Siena 412,424 SIENA/219 CANA-SLAB SETTLING-MET W/STRUCT.ENGINEER $45

7/5/06 CHARLES HILTON 412 Siena 209 CANA,412 & 424 SIENA-SLAB/FOUNDATION REPAIRS $75

8/16/06UNITED STATES

TREASURY412 Siena 412 SIENA-SLAB/FOUNDATION REPAIR $287

8/22/06UNITED STATES

TREASURY412 Siena 412 SIENA-WORK ASSOC. W/SLAB & FOUNDATION REPAIRS BY POWERLIFT $360

8/22/06UNITED STATES

TREASURY412 Siena

412 SIENA-RESET DOOR JAMBS/REHANG STORM DOOR DUE TO SLAB

WORK$142

8/30/06UNITED STATES

TREASURY412 Siena 412 SIENA-SLAB/FOUNDATION REPAIR $90

8/30/06 H & T Carpets, Inc. 412 Siena 412 SIENA-carpet work due to slab work $75

9/6/06DALE'S REPAIR

SERVICE412 Siena 412 SIENA-MOVE CONDENSING UNIT TO $380

9/14/06BELLE MEADE

CONTRACTORS412 Siena 412 SIENA-GRADING/CLEANUP DUE TO SLAB SETTLING WORK $4,310

10/12/06UNITED STATES

TREASURY412 Siena 412 SIENA-FOUNDATION REPAIRS $90

10/18/06UNITED STATES

TREASURY412 Siena 412 SIENA-SLAB/FOUNDATION/COSMETIC DAMAGE REPAIRS $75

11/1/06 H & T Carpets, Inc. 412 Siena 412 SIENA - TAKE UP THIN SET, TILE REPAIR, $250

11/1/06 H & T Carpets, Inc. 412 Siena 412 SIENA & 213 CANA-carpet work due to slab work $45

11/9/06UNITED STATES

TREASURY412 Siena 412 SIENA-SLAB/FOUNDATION WORK $90

11/9/06 POWER LIFT 412 Siena412 SIENA- (SLAB) 15 EXT. PIERS/4 INT. PIERS/MUD-

JACKING/EXCAVATION/BACKFILL$23,300

11/9/06 POWER LIFT 412 Siena412 SIENA- (SLAB) BACKHOE CONCRETE DEMO/EQUIPMT RENTAL/LABOR-

CONCRETE DEMO$8,700

1/25/07 CHARLES HILTON 412 Siena 412 SIENA-INTERIOR DAMAGE REPAIR FROM FOUND. SETTLING/REPAIR $230

1/25/07 Irwin & Irwin 412 Siena412 SIENA-INTERIOR REPAIR WORK DUE TO UNIT MOVING ON

FOUNDATION:$4,510

7/15/10 CHARLES HILTON 412 Siena FOUNDATION/SLAB-POWER LIFT: 208-210 CANA, 413 SIENA, 412 SIENA $33

Page 8 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

7/28/10 CHARLES HILTON 412 Seina412 SEINA--FOUNDATION REPAIR (INSPECT/SCHED.REPAIRS/OBTAINED

ESTIMATE)$140

6/6/13 CHARLES HILTON 412 SienaFoundation, floor, wall, ceiling investigation/measurement/observation w/PowerLift:

412 Siena,$110

9/5/13 CHARLES HILTON 412 Siena 412 Siena-floor/Power lift $90

9/26/13 CHARLES HILTON 412 Siena412 SIENA-POWER LIFT-BRUCE LITTLE, BELLE MEADE LANDSCAPES-JR

VAUGHN, H&T CARPET- WILLIE HODGES$140

10/3/13 CHARLES HILTON 412 Siena 412 Siena-foundation work-discussed,sched,ck progress,completion of floor repairs $210

10/3/13 CHARLES HILTON 412 Siena412 Siena-foundation work-sched & ck carpet removal, sched & ck furniture

relocation$90

10/10/13 POWER LIFT 412 Siena 412 Siena-Pier placement at interior columns (10) $12,500

10/31/13 CHARLES HILTON 412 Siena 412 Siena-cleared debris/duct/etc from basement floor slab/sched & ck install $140

10/31/13 CHARLES HILTON 412 Siena 412 Siena-sched/assisted/ck reinstall/repositioning of a/c condensor & a/c heat $105

412 Siena Drive Total $56,770

2/23/11 CHARLES HILTON 413 Siena Dr413 SIENA DR--INITIAL INSPECTION/MEASUREMENTS WITH POWERLIFT

LAST FALL/ FOLLOWUP INSPECTION/MEAS...$140

2/24/11 CHARLES HILTON 413 Siena Dr413 SIENA DR--INITIAL INSPECTION/MEASUREMENTS WITH POWERLIFT

LAST FALL/ FOLLOWUP INSPECTION/MEAS...$0

7/15/10 CHARLES HILTON 413 Siena Dr- FOUNDATION/SLAB-POWER LIFT: 208-210 CANA, 413 SIENA, 412 SIENA $34

413 Siena Drive Total $174

8/23/07 GLADYS E. BRYANT 418 Siena 418 SIENA-CLEAN INTERIOR AFTER PLUMBING WORK $150

418 Siena Drive Total $150

6/11/15Summit Property

Restoration, LLC419 Siena Dr. final bill on Siena Dr. - 408 & 410 packing, moving & storage of all contents in units $800

419 Siena Drive Total $800

8/10/06UNITED STATES

TREASURY424 Seina 424 SEINA-SLAB REPAIR WORK $270

8/11/05 CHARLES HILTON 424 Siena 424 SIENA-MEASURE SLAB ELEVATION & MONITOR FOR PROBS $90

2/1/06 CHARLES HILTON 424 Siena 424/412 SIENA-SLAB/FOUNDATION/TERMITES $67

2/9/06 CHARLES HILTON 424 Siena 412/424 SIENA-SLAB/FOUNDATION W/POWER LIFT $45

2/21/06 CHARLES HILTON 424 Siena 209 CANA /424 SIENA-SLAB/FOUNDATION WORK W/POWER LIFT $45

Page 9 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

6/21/06 CHARLES HILTON 424 Siena FOLLOW UP W/POWER LIFT-209 CANA,412 SIENEA,424 SIENA $45

6/28/06 CHARLES HILTON 424 Siena 412,424 SIENA/219 CANA-SLAB SETTLING-MET W/STRUCT.ENGINEER $45

7/5/06 CHARLES HILTON 424 Siena 209 CANA,412 & 424 SIENA-SLAB/FOUNDATION REPAIRS $75

7/12/06 CHARLES HILTON 424 Siena 424 SIENA-SLAB REPAIR WORK $90

7/26/06UNITED STATES

TREASURY424 Siena 424 SIENA-SLAB REPAIR WORK $175

8/1/06UNITED STATES

TREASURY424 Siena 424 SIENA-SLAB REPAIR WORK $972

8/10/06UNITED STATES

TREASURY424 Siena 424 SIENA-WATER ENTERING UNIT AT BASE OF WALL $142

8/10/06UNITED STATES

TREASURY424 Siena

424 SIENA-DUE TO WATER ENTRANCE-ARRANGE CARPET

REPAIR/RELAYING$75

8/16/06

HANTEL

CONSTRUCTION

COMPANY - LLC

424 Siena 424 SIENA-REMOVE COUNTERTOPS/BASE CABINETS/ $350

8/16/06

HANTEL

CONSTRUCTION

COMPANY - LLC

424 Siena 424 SIENA-REINST. COUNTERTOPS/BASE CABINETS $1,200

8/16/06 GLADYS E. BRYANT 424 Siena 424 SIENA-CLEAN INTERIOR AFTER SLAB WORK $180

8/22/06 H & T Carpets, Inc. 424 Siena 424 SIENA-carpet work due to slab work $95

8/30/06UNITED STATES

TREASURY424 Siena 424 SIENA-SLAB/FOUNDATION REPAIR $90

9/6/06 H & T Carpets, Inc. 424 Siena 424 SIENA-carpet work due to slab work $90

9/6/06UNITED STATES

TREASURY424 Siena 424 SIENA-DUE TO SLAB RAISING-INTERIOR/COSMETIC REPAIRS $603

9/14/06UNITED STATES

TREASURY424 Siena 424 SIENA-SLAB REPAIR WORK $45

9/21/06CORLEW & PERRY,

INC.424 Siena 424 SIENA-KITCHEN-NEW CONCRETE- $380

11/9/06 POWER LIFT 424 Siena 424 SIENA- (SLAB) 50 SQ.FT. CONCRETE DEMO $538

11/9/06 POWER LIFT 424 Siena 424 SIENA- (SLAB) 256 SQ.FT. CONCRETE DEMO $2,752

424 Siena Drive Total $8,459

Page 10 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

10/23/14 CHARLES HILTON 426 Siena426 Siena-foundation/investigation, determination of extent of problem, needed

repairs, scheduli...$105

11/13/14 CHARLES HILTON 426 Siena426 Siena- foundation repairs: review, discussion & distribution of contractors

estimate/proposa...$90

2/19/15 CHARLES HILTON 426 Siena426 SIENA-FOUNDATION-SCHEDULED, INPRCESS INSPECTION/REVISIONS,

FINAL APPROVAL/INSPECTION$130

4/9/15 CHARLES HILTON 426 Sienafoundation repair/final elevation measurements: 206 Miles, 288 Cana, 426 Siena,

408 Siena, 410 S...$25

4/1/15 POWER LIFT 426 Siena Dr. 426 Siena Dr.- 22 Steel Piers, 5 concrete demos, 1 additional concrete demo $21,800

426 Siena Drive Total $22,150

10/13/16 1433 POWER LIFT 435 Siena 435 Siena- 6 steel piers, floor bracing, support

435 Siena Drive Total $9,200

8/1/06PROFESSIONAL

CARPET SYSTEMS452 Siena 452 SIENA-EMERG.WATER EXTRACTION DUE TO DRAINAGE PROBLEMS $140

452 Siena Drive Total $140

7/3/14 CHARLES HILTON 501 Loyola 503 & 501 Loyola -PowerLift/Bruce Little $53

501 Loyola Drive Total $53

7/10/14 CHARLES HILTON 503 Loyola503 Loyola-follow up w/Bruce Little extended discussion of problem & proposal,

request for preli...$0

7/10/14 CHARLES HILTON 503 Loyola503 Loyola-follow up w/Bruce Little extended discussion of problem & proposal,

request for preli...$105

7/31/14 CHARLES HILTON 503 Loyola 503 Loyola-foundation, etc. continuing $90

8/7/14 CHARLES HILTON 503 Loyola 503 Loyola-foundation etc. continuing $90

7/3/14 CHARLES HILTON 503 Loyola 503 & 501 Loyola -PowerLift/Bruce Little $52

9/4/14 POWER LIFT 503 Loyola 503 LOYOLA - 5 STEEL PIERS $4,500

503 Loyola Drive Total $4,837

7/3/12 CHARLES HILTON 505 Loyol 505-507 Loyola-foundations-began foundation repairs $116

6/13/12 CHARLES HILTON 505 Loyola505 Loyola-interior/exterior defects/inspection/examine w/Power Lift, preliminary

report/ formal...$90

7/11/12 CHARLES HILTON 505 Loyola505-507 Loyola-foundation repairs/removed columns at front entrance as needed to

allow piering o...$80

7/19/12 CHARLES HILTON 505 Loyola505 Loyola-foundation repairs-reset latch side door jamb/casing on master bedroom

door$68

8/29/12 CHARLES HILTON 505 Loyola 505 Loyola-foundation repair related repairs $116

Page 11 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

9/20/12 POWER LIFT 505 Loyola 505 LOYOLA-30 STEEL PIERS/1 CONCRETE DEMO $28,500

505 Loyola Drive Total $28,970

8/4/10 CHARLES HILTON 506 Loyola506 LOYOLA--WATER ENTRANCE/SLAB CRACK SEALED ACROSS LENGTH

OF LIVING ROOM/DINING ROOM$118

506 Loyola Drive Total $118

7/3/12 CHARLES HILTON 507 Loyola 505-507 Loyola-foundations-began foundation repairs $117

7/11/12 CHARLES HILTON 507 Loyola505-507 Loyola-foundation repairs/removed columns at front entrance as needed to

allow piering o...$80

507 Loyola Drive Total $197

7/25/12 CHARLES HILTON 700 Mt.Carmel700 Mt.Carmel-foundation/doors/wall-initial observ/sched PowerLift for further

inspection & prop...$90

700 Mt Carmel Total $90

5/17/12 CHARLES HILTON 702 Mt.Carmel702 MT.CARMEL-FLOOR/FOUNDATION-OBSERV/MEASUREMENTS/SCHED

SITE VISIT/OBSERV/MEASURE W/POWER LIFT$175

5/23/12 CHARLES HILTON 702 Mt.Carmel 702 Mt.Carmel-foundatioin repairs/scheduling found repairs and interior repairs $180

702 Mt Carmel Total $355

3/14/13 POWER LIFT707 Mt. Carmel

Pl. 707 MT. CARMEL PL. - 9 STEEL PIERS $8,100

1/17/13 CHARLES HILTON 707 Mt.Carmel707 Mt.Carmel-foundation-sched inspection/measurement of floor/foundation

w/Bruce Little of Powe...$105

1/30/13 CHARLES HILTON 707 Mt.Carmel 707 Mt.Carmel-floor foundation-Power Lift, measurements, confirmation, etc. $90

2/7/13 CHARLES HILTON 707 Mt.Carmel707 MT.CARMEL-FLOOR/FOUNDATION-RESEARCH,REVIEW,NOTIF.,

DISCUSS$60

2/14/13 CHARLES HILTON 707 Mt.Carmel707 Mt.Carmel-floor/foundation-ck completed floor/foundation repairs, Adjusted rear

storm door$140

707 Mt Carmel Total $8,495

7/8/09 POWER LIFT 709 Mt. Carmel 709 & 711 MT. CARMEL- 3 PERIMETER STEEL PIERS $1,325

709 Mt Carnel Total $1,325

11/16/10 CHARLES HILTON 711 Mt CarmelWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

7/8/09 POWER LIFT 711 Mt. Carmel 709 & 711 MT. CARMEL- 3 PERIMETER STEEL PIERS $2,650

Page 12 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

4/1/09 CHARLES HILTON 711 Mt.Carmel711 MT.CARMEL-CK.WALLS/CEILINGS DUE TO POSSIBLE FOUNDATION

PROB. (POWERLIFT CONTACTED)$90

6/2/09 CHARLES HILTON 711 Mt.Carmel 711 MT.CARMEL-FOUNDATION REPAIR SCHEDULING $95

6/11/09 CHARLES HILTON 711 Mt.Carmel 711 MT.CARMEL-FOUNDATION REPAIRS-MEETINGS/SCHEDULINGS $70

7/22/09 CHARLES HILTON 711 Mt.Carmel711 MT.CARMEL-DUE TO FOUNDATION REPAIR-REPAIR CLOSET DOOR TO

PERMIT CLOSING$35

6/19/09 CHARLES HILTON 711 Mt.Carmel711 MT.CARMEL--FOUNDATION REPAIRS (SCHEDULED/OBSERVED

EXCAVATION FOR & INST. OF 3 STEEL PIERS AT$105

711 Mt Carmel Total $3,065

3/20/14 CHARLES HILTON 717 Mt.Carmel717 Mt.Carmel-first level flooring/basement floor-ck living level engineered flooring

(separatio...$130

6/11/15 CHARLES HILTON 717 Mt.Carmel 717 Mt.Carmel - foundation related records investigations, etc $105

717 Mt Carmel Total $235

3/29/06 CHARLES HILTON 801 Marquette 801 MARQUETTE-MONITOR SLAB/FOUNDATION PROBLEMS $135

801 Marquette Drive Total $135

11/16/10 CHARLES HILTON 802 MarquetteWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

12/28/11 CHARLES HILTON 802 Marquette802 MARQUETTE-CK COMPLAINT OF SLAB SETTLING/MADE & RECORDED

FLOOR MEASUREMENTS, ELEVATION, DEVIA...$130

1/5/12 CHARLES HILTON 802 Marquette802 MARQUETTE-POWERLIFT;EXAMINATION,MEASURE,DISCUSS,REUQEST

PROPOSAL-FLOOR/FOUNDATION$60

1/19/12 CHARLES HILTON 802 Marquette 802 Marquette-sewer investigation & variance request investigation $198

2/1/12 CHARLES HILTON 802 Marquette 802 Marquette-disconnect/remove a/c & installation of foundation piers $260

3/1/12 POWER LIFT 802 Marquette 802 Marquette - 5 perimeter steel piers $4,650

802 Marquette Drive Total $5,318

10/16/08 CHARLES HILTON 803 Marquette 803 MARQ.-RETAINING WALL/WATER THROUGH SLAB JOINT INTO GARAGE $135

11/16/10 CHARLES HILTON 803 MarquetteWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

803 Marquette Drive Total $155

11/16/10 CHARLES HILTON 804 MarquetteWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

804 Marquette Drive Total $20

Page 13 of 14

THE CLOISTER OWNERS ASSOCIATION

Slab Raising Capital Expenditure History January 2005 through September 2016

11/16/10 CHARLES HILTON 805 MarquetteWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

805 Marquette Drive Total $20

7/1/09 CHARLES HILTON 808 Marquette 808 MARQUETTE-INSPECT/CONTACT POWERLIFT/ETC. RE:FOUNDATION $135

7/16/09 CHARLES HILTON 808 Marquette808 MARQUETTE-EVALUATION/DISTRIBUTION OF PROPOSAL FOR

FOUNDATION REPAIR$45

9/2/09 CHARLES HILTON 808 Marquette-808 MARQUETTE-FOUNDATION REPAIR-POWERLIFT-ELEVATION

MEASUREMENTS/ADJUSTED REAR ENTRANCE DOOR LOC...$140

10/28/09 POWER LIFT 808 Marquette- 808 MARQUETTE--6 PEREMITER STEEL PIERS $6,695

808 Marquette Drive Total $7,015

11/16/10 CHARLES HILTON 811 MarquetteWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

811 Marquette Drive Total $20

11/16/10 CHARLES HILTON 813 MarquetteWALL RECAP PROJECT: 802-804, 811-813,803-805 MARQUETTE/278-280

CANA/711 MT.CARMEL-FRONT STOOP/TH...$20

813 Marquette Drive Total $20

7/25/12 CHARLES HILTON 904 Glenmary904 Glenmary-foundation/doors/wall-initial observ/sched PowerLift for further

inspection & propo...$90

8/23/12 CHARLES HILTON 904 Glenmary scheduled foundation repairs: 210, 300, 302 Cana & 904 Glenmary $23

9/20/12 POWER LIFT 904 Glenmary 904 GLENMARY-8 STEEL PIERS/3 CONCRETE DEMO/1 MASONRY REPAIR $7,750

904 Glenmary Court Total $7,863

Total Miscellaneous $6,267

Total $450,061