The boss

10
10.07.2015 Parents day

Transcript of The boss

Page 1: The boss

10.07.2015

Parents day

Page 2: The boss

2ITQ GmbH

1. Team

2. Methodology

3. Weekly development

Agenda

Page 3: The boss

3ITQ GmbH

■ The Boss:■ David

■ Jordi

Team

Page 4: The boss

4ITQ GmbH

Mission idea

Mission

System-integration

First exercise Second exercise

Third exerciseInitialphaseTesting & Parents

presentation

Week development

6th

7th

8th

9th

10th

Page 5: The boss

5ITQ GmbH

Initial phase: Design pusher wheel Construction

First day

Page 6: The boss

6ITQ GmbH

Programming Move wheel pushing Stop wheel pushing

Start second model

Second day

Page 7: The boss

7ITQ GmbH

First Design line follower

Start construction

Third day

Page 8: The boss

8ITQ GmbH

Fourth day

Finish Construction

Programming Line follower Stop in red color

Modify design Ultrasonic sensor

Construction

Page 9: The boss

9ITQ GmbH

Fifth day – Final robot

Arm modification Design Construction Programming

Page 10: The boss

10ITQ GmbH

Puntuation : 72 points

Evaluation system

Design 3Functionality 10