The Big Picture Brand-new library / media center building Brand-new kinder classroom building...

download The Big Picture Brand-new library / media center building Brand-new kinder classroom building Brand-new kinder playground and covered pavilion Renovated

of 12

  • date post

    01-Apr-2015
  • Category

    Documents

  • view

    212
  • download

    0

Embed Size (px)

Transcript of The Big Picture Brand-new library / media center building Brand-new kinder classroom building...

  • Slide 1

Slide 2 The Big Picture Brand-new library / media center building Brand-new kinder classroom building Brand-new kinder playground and covered pavilion Renovated administrative office building Relocated front of the school Renovated and improved parent/staff parking lot Central drop-off and pick-up lanes Brand-new covered breezeway and walkway and sitting areas through campus Slide 3 View of the Big Picture Slide 4 The New Library/Media Center Greatly expands library and computer lab capacity Computer lab = computer classroom Steps to building = amphitheatre outdoor seating Slide 5 The New Kinder Building Brings much-needed symmetry to kinder buildings Increases curb appeal in our most visible area Upgrades and improves classroom space Slide 6 The New K Playground/Pavilion Upgrades and expands play area Increases curb appeal Creates covered pavilion area between the buildings Slide 7 The Renovated Front of the School Brings admin. building to central location Brings main parking area to the front of school Expands and centralizes the drop-off and pick-up lane Slide 8 The New Breezeway, Walkway and Sitting Areas Creates central, covered corridor through campus Beautifies central areas with trees and benches Transforms auxiliary area into focal point Slide 9 The View From Above Slide 10 The Timeline Sept. 27 - Authorization to bid goes to Board Oct. 3 & Oct. 10 Bids advertised Oct. 19 @ 10 a.m. Potential contractors, PSA officials, architects, district officials, principal, construction management officials to meet and walk the site Nov. 7 @ 2 p.m. - Bidding process officially opens Nov. 16 Bids submitted for Board approval Nov. 17 Notice to proceed submitted Nov. 28 Pre-construction meeting on site December Start project!! Slide 11 Frequently Asked Questions How long will project take? Estimated to take 16 months. When will it begin? Could start as soon as Nov. 28, but probably wont break ground until Dec. 2011 Which buildings will be done first? The actual phasing has yet to be planned, but the Library and Kinder buildings will break ground simultaneously. The project will be phased so that all vital areas/functions on site will not be impacted. New areas will not be relocated until the new facility is open and ready. Will heavy/loud work happened during school hours? It is inevitable, yes. The management company in charge is very experienced at school construction. They will know how to do the work in a way that minimizes impact on instruction. Slide 12 Frequently Asked Questions (page 2) How will student safety be maintained during construction? All work areas will be fenced off and clearly marked. Workers will have their own office, break and restroom areas. They will have no contact with students during construction. How can the school and community be involved with the project? Mr. Chan will meet with the construction manager on a weekly basis. Mr. Chan will form a committee of staff members and parents who will meet with the project manager at regular intervals.