The benefits of a compositional thermal hydraulic integrated production model when investigating subsea processing Yenny Rojas 1 , Martin Watson 2 , Silvere Barbeau 1 , Ross Waring 1 1 FEESA-IPM Pty Ltd, Perth, Australia 2 FEESA Ltd, Hampshire, United Kingdom ABSTRACT Subsea processing has become a promising technology for the offshore upstream oil and gas industry, which could solve many current and future field development challenges. Some authors are predicting a fivefold increase in annual spending on subsea processing from 2013 to 2020. It is becoming more common for offshore field development planners to consider subsea processing during conceptual design. However, like most production technologies, it is not appropriate for all projects at all points in their field life and hence should be looked at thoroughly when being considered. In this paper it is argued that many of the simplifications made in traditional Integrated Production Models (IPM) can lead to errors in the production forecast, particularly for subsea processing systems. Worse still, simple IPM lead to the slowing down of the design process, such that many of the cost and operability advantages and disadvantages of subsea processing are not investigated until the concept has already been selected. This paper discusses the benefits of compositional, thermal hydraulic integrated production models for the evaluation of subsea processing, illustrating many of the points with two case studies based on real projects; a subsea separation and a subsea compression study. 1. INTRODUCTION The emerging innovations in subsea technology have mainly been driven by the need to access some of the world’s most remote locations and extreme environments, minimising costs by reducing the size and number of surface facilities, and reducing/eliminating the need for platform changes to accommodate additional equipment, such as separation, water-handling, and compression facilities (11). Furthermore, numerous production benefits are associated with subsea processing, which can include increased recovery factors, accelerated production, improved flow assurance, reduced CAPEX over use of conventional technology (e.g. second pipeline), phase investment and increased revenue, operational flexibility, longer tie-back distances, reduced OPEX, and HSE benefits (i.e. fewer offshore personnel, materials, emissions, less to decommission) (9,11). Some authors (17) are predicting subsea processing spend to be over $130 billion in 2020; five times higher than 2013 figures. Subsea processing consists of a range of technologies for separation, pumping, and compression. Successful implementations of subsea pumping and/or compression have enabled new subsea field developments that were not economic with traditional production technologies. Subsea separation may be required with one of these subsea boosting options, though for the right development, it could be a preferred development concept on its own as it makes it possible to send gas and liquid to different locations with different processing capacities. Also, Subsea water treatment technology allows separated water to be injected in the reservoir for pressure maintenance (6). Subsea processing is generally considered to include the following existing or developmental functional capabilities;

Transcript of The benefits of a compositional thermal hydraulic ... production model when investigating ... of...

The benefits of a compositional thermal hydraulic integrated production model when investigating subsea

processing

Yenny Rojas 1, Martin Watson 2, Silvere Barbeau 1, Ross Waring 1

1 FEESA-IPM Pty Ltd, Perth, Australia 2 FEESA Ltd, Hampshire, United Kingdom

ABSTRACT Subsea processing has become a promising technology for the offshore upstream oil and gas industry, which could solve many current and future field development challenges. Some authors are predicting a fivefold increase in annual spending on subsea processing from 2013 to 2020. It is becoming more common for offshore field development planners to consider subsea processing during conceptual design. However, like most production technologies, it is not appropriate for all projects at all points in their field life and hence should be looked at thoroughly when being considered. In this paper it is argued that many of the simplifications made in traditional Integrated Production Models (IPM) can lead to errors in the production forecast, particularly for subsea processing systems. Worse still, simple IPM lead to the slowing down of the design process, such that many of the cost and operability advantages and disadvantages of subsea processing are not investigated until the concept has already been selected. This paper discusses the benefits of compositional, thermal hydraulic integrated production models for the evaluation of subsea processing, illustrating many of the points with two case studies based on real projects; a subsea separation and a subsea compression study. 1. INTRODUCTION The emerging innovations in subsea technology have mainly been driven by the need to access some of the world’s most remote locations and extreme environments, minimising costs by reducing the size and number of surface facilities, and reducing/eliminating the need for platform changes to accommodate additional equipment, such as separation, water-handling, and compression facilities (11). Furthermore, numerous production benefits are associated with subsea processing, which can include increased recovery factors, accelerated production, improved flow assurance, reduced CAPEX over use of conventional technology (e.g. second pipeline), phase investment and increased revenue, operational flexibility, longer tie-back distances, reduced OPEX, and HSE benefits (i.e. fewer offshore personnel, materials, emissions, less to decommission) (9,11). Some authors (17) are predicting subsea processing spend to be over $130 billion in 2020; five times higher than 2013 figures.

Subsea processing consists of a range of technologies for separation, pumping, and compression. Successful implementations of subsea pumping and/or compression have enabled new subsea field developments that were not economic with traditional production technologies. Subsea separation may be required with one of these subsea boosting options, though for the right development, it could be a preferred development concept on its own as it makes it possible to send gas and liquid to different locations with different processing capacities. Also, Subsea water treatment technology allows separated water to be injected in the reservoir for pressure maintenance (6).

Subsea processing is generally considered to include the following existing or developmental functional capabilities;

For oil systems, subsea oil pressure boosting systems, subsea oil processing, bulk water separation, sales quality oil polishing, and subsea raw seawater injection for reservoir pressure support.

For gas systems, subsea gas compression, bulk water removal, subsea gas dew pointing/dehydration, capabilities for flow assurance and for sales quality (1).

Subsea processing also covers the challenges in handling and treating produced water at the seabed between 1.5 and 2.5 km water depth (11). Table 1 summarises the technical status of the subsea processing technologies based on both completed development and qualification activities as well as on experiences from subsea applications (5).

Table 1 Technology maturity overview of the main subsea process technology alternatives (5).

Subsea Process Status Experience Multiphase Boosting Mature technology Several successful

applications Gas-liquid separation and liquid boosting

High technical maturity level

Subsea operational experience

Bulk water separation High technical maturity level

Subsea operational experience

Complete water separation Some further technology maturing required Gas compression Extensive further technology maturing required Some of the most recent subsea processing applications include the following developments;

Hydrocarbon boosting on the Lufeng field offshore China; Separation at the Troll pilot project and separation and boosting at the Tordis

project, both offshore Norway; Separation on Pazflor in Angola; Raw seawater injection at the Norwegian Tyrihans development; and Compression at the Gullfaks, Åsgard and Ormen Lange pilot project offshore

Norway. See References 9, 11, 15 and 18 for further details.

The expanding and diversifying global demand for energy is accelerating the multifaceted advancements in subsea processing technology. However, subsea processing is not without cost. Beyond the immediate costs of the hardware are the costs associated with the additional complexity of the system, which include operating expenses and potentially reduced uptime. In order to rate a subsea production technology against a conventional one, engineers must compare these costs against the additional benefits to production. 2. PREDICTING THE INCOME (PRODUCTION PROFILE) The effect of hardware on a development’s production profile (i.e. the rate of production through life) is best forecasted by an Integrated Production Model (IPM). These are typically models of the production system from reservoir to some point in the network where a constant arrival pressure can be assumed. Such models predict the flow rate as a function of the resistances in the network and the arrival and inlets (reservoir) pressures. As the reservoir pressure(s) and fluid composition changes through time, the resistances and hence flow rates change, subject to constraints imposed by the user to represent processing and reservoir management constraints.

Most of the resistances to flow in a tieback are usually the multiphase pressure drops. Typical IPM tools represent these multiphase resistances as lift curve tables; tables of inlet pressure versus flow rate for a range of gas/oil ratio and water/liquids ratios at stock tank conditions and arrival pressure. Such models assume that the compositional variations each branch in a tieback might see through life can be represented by the gas/oil ratio and watercut alone. This is not generally true, especially not in systems where fluids from multiple reservoirs are blended. To illustrate this, a simulation of a deepwater gas condensate tieback was performed for a range of compositions, all of which had the same condensate to gas ratio (CGR) and watercut (WC); 1stb/MMscf and 1%, respectively. The results are plotted in Figure 1, in terms of predicted flow rate for a range of pressure drops.

Figure 1 Rate vs pressure drop for a range of compositions with same CGR & WC

As can be seen, though each composition had the same CGR and WC, and all used the same three phase multiphase flow model, significantly different flow rates are predicted; a scatter of more than 20% in predicted flow rates at pressure drops of less than ~55bar.

Figure 2 Rate vs pressure drop for a range of inlet temperatures

Similarly, such lift curve tables take no account of inlet temperature changes. Figure 2 plots the rate versus pressure drop curve for one of the compositions in Figure 1 for a range of inlet temperatures (10, 20 and 30°C). Though the change is more modest than the compositional error, it is still noticeable. Hence, even if the look-up tables are generated using the same three phase multiphase flow model, significant errors (>10%)

0

10

20

30

40

50

60

70

80

90

0 10 20 30 40 50 60 70 80 90 100

Pred

icte

d Fl

ow R

ate

(MM

scfd

)

Pressure Drop (bar)

Composition A

Composition B

Composition C

Composition D

Composition E

>20% difference in predicted rate

0

20

40

60

80

100

120

140

0 10 20 30 40 50 60 70 80 90 100

Pred

icte

d Fl

ow R

ate

(MM

scfd

)

Pressure Drop (bar)

10°C inlet

20°C inlet

30°C inlet

20% difference in pressure drop

~5% difference in predicted flow rate

can creep incompositionmultiple res

For subsea greater erroseparator onwater comptime as the ris the operahydraulic an(quality) vatemperatureconstant sepstream of 20

F Such a largedirect impacthe back prethat determihence what reasonable eand will gengas velociticreate an adexport pipelMaximus v4another withpipeline verLGR througthe hold-up low flow raoperated. It the pipeline or even smachange operabandonmen

nto production ns and temperaervoir tiebacks

processing exors in the forecn one of the daosition (hence reservoir pressuating envelope nd compositionaries significante wrong by 10°Cparation efficien0 to 50%, depen

Figure 3 Phase

e error in liquidct on the forecaessure from theines the operatiflow rate can

efficiency, the nerally have littes. However, a

dditional back pline system from4.14 for two dh an LGR of

rsus flow rate. Tghout the range

is relatively smates, the liquid

is typical to hawill not be ope

all changes in rarating procedurnt or (in this ca

forecasts basedatures vary thro.

amples, simplicast. Figure 3 pays of productiophase envelopeure drops; this ppredicted for t

nal IPM tool. Atly with both pC would lead tncy, could meanding on time in

envelope of th

d carry over intast estimate, the wet gas pipeling pressure of be achieved frmass flow ratetle impact on that low velocitiressure on the wm Reference 2

different compo1.5stb/MMscf.

The liquid conteof operation (5

mall and so thecontent domin

ave a minimumerated for fear ate. To operate res, such as rease) switch fro

d on lift curveough field life,

ifications of thplots the phaseon. It should bee) of the fluids plot is just for ithe subsea sep

As shown, the gpressure and temo an error in qu

an an error in lin field life.

e composition

to the “wet gashough it dependline and the subthe subsea sepa

rom the wells. e of liquid will he pressure droes, liquids can wells. To illustr1 was simulateositions; one w

Figure 4 plotent is increased500 to 2000MMe increase has lnates the pressum operating rate

of creating excbelow this rate

egularly pig them twin to sing

s. This is parti, which is gen

he thermal hyde envelope of fe noted that thein this separat

illustration. Alsarator through

gas mass fractiomperature. Getuality of ~1%, iquid carry ove

in a subsea sep

s” stream may ds on the systebsea compressoarator, the wellHowever, if thbe relatively lo

op in the wet gan accumulate inrate this, the ~1

ed using LedaPMwith an LGR of

s the total liqud by ~40% by th

Mscfd), howeverlittle impact on ure drop and hoe for such pipelcessive surges o safely, the Opee line, drop the

gle line product

icularly true if nerally the case

draulics can cafluids entering e hydrocarbon aor change throuso show in the p

life by a thermon in the separatting the separawhich assumin

er rate into the

parator

or may not havm. Typically, ior (if there is olhead pressure ahe separator haow (even +/-50as pipeline at hn the pipeline a50km twin 36inM 3 phase v1.2f 1stb/MMscf auid content of he 50% increaser at high flow rapressure drop.

ow the pipelineines, below wh

on restart, ramperator may neede arrival pressution mode. Any

the e in

ause the and ugh plot mal ator ator ng a gas

ve a it is one) and as a 0%) high and nch 2 in and the

e in ates At e is hich -up d to ure, y of

these operating modes will change the resistance to flow through the export pipeline and hence production profile. The value of this minimum flow rate depends on the liquid content in the pipeline, the surge volume in the slug catcher and the restart and ramp-up strategies. However, on a like for like basis (e.g. no more than 10,000m³ of liquid in the pipeline; dotted line in Figure 4) the decision to change operating mode would occur at ~100MMscfd higher rates with a 50% higher LGR.

Figure 4 Sensitivity of the liquid content of a long distance wet gas trunkline to LGR This is a typical problem of deepwater gas systems late in life and can be the reason why they drop off plateau sooner than predicted by simpler IPM tools.

Some engineers (3) have been so concerned by the errors associated with simple IPM tools (GAP, in their case) that they developed bespoke tools for some of their projects in order to tune their IPM to results from a more rigorous simulator (OLGA, in their case) during runtime. Figure 5 shows a flow diagram of how their bespoke “Integrated Flow Assurance Modelling Tool” worked. It is not reported how long it took to build such a system for each project, but it is not expected to be very practical for conceptual design of a multiple drill centre development, when a wide range of network configurations should be investigated. Other engineers (8, 19, 20 and 21) have developed commercially available IPM tools that can solve the molar and energy balance from reservoir to reception facility in one tool at the same time as the momentum (i.e. pressure) balance. This speeds up the model build and analysis time and reduces the likelihood of model build errors.

Figure 5 Schematic of a bespoke “Integrated Flow Assurance Modelling Tool” (3)

0

5000

10000

15000

20000

25000

30000

35000

40000

0 200 400 600 800 1000 1200 1400 1600 1800 2000

Tota

l Liq

uid

Cont

ent

(m³)

Gas Rate (MMscfd)

1.5 bbl/MMscf LGR

1.0 bbl/MMscf LGR

In most subpump if themajority of when tryingperformanceso is its oper

Figure For exampledifferent combe seen, the from the otoperate (thealmost inope

Clearly, if tto be properthroughout lcarbon diox 3. MANA The case ofsimulators compared tolong run, it of the reserdescribed hoand investigassumptionsslows the primprove thequantify the

Traditionallymargins befdeterminingbetween dispossible or i

bsea processingere isn’t a comfield life. Henc

g to predict the e of a compressrable range.

6 An example

e, Figure 6 (12mpositions (witperformance c

ther, but moree surge and theerable with the

the production rly estimated, thlife, which mig

xide concentratio

AGING RESER

ften made for is that the er

o the economic can be risky forvoirs during tow rigorous thegate potential s. As these paprocess of optime workflow bete subsurface risk

y, facilities engfore and after tg these design csciplines. This if their current s

g systems, the mpressor) is the

ce modelling thfuture revenue

sor a strong fun

of how compr

) is a plot of thth average mol

curve for the leae importantly, e choke limits)leaner gas com

enhancing capahe forecast mus

ght be significanons, for exampl

RVOIR RISK

simpler (i.e. lirrors associated

uncertainties, sor the project tothe design of ermal hydraulicopportunities (

pers show, rathemising the systetween engineeriks to the faciliti

gineers try to stheir work to coases is arbitrarycan lead to p

solution is robu

performance omain constrain

he performancees from such synction of compo

ressor limits ch

he operating enecular weights aner gas (36.2 kthe limits with) have shrunk

mposition.

abilities of a sust capture the efnt if fluids vary le.

S

ift curve) basedd with the simsuch as reserveo be over relianthe facilities. Hc IPM can be u(Case Study 1er than being anem, if done coring groups andies design.

tick to “designover unquantifiy and can lead tprojects not knust against reser

of the subsea cnt to the produe of such equipystems. Not onlosition, tempera

hange with com

nvelop for a comof 55 and 36.2

kg/kmol) is signhin which the so much that

ubsea (or topsidffect of the chan

y significantly in

d IPM tools omplistic assum

es size and pricent on one assumHowever, prevused to manage; Ref 19) of dn unnecessary lrrectly, rigorousd help them und

n cases” for thefied uncertaintieto snowballing nowing if a chrvoir uncertaint

ompressor (or uction rate for pment is importly is the hydrauature and pressu

mposition (12)

mpressor with t2 kg/kmol). As nificantly differ

compressor mthe compressor

des) compressonging compositn hydrocarbon a

ver more detaimptions are sme of oil, etc. In med representatvious papers he such risks (8,different reservlevel of detail ts IPM models derstand and ev

eir studies and aes. The processof design marg

heaper solutionties.

the the

tant ulic ure,

two can rent

must r is

r is tion and

iled mall

the tion ave 10)

voir that can ven

add s of gins n is

By modelling the reservoirs in the thermal hydraulic simulator, facilities engineers can do life of field sensitivity studies on the key uncertainties, such as “what if this reservoir was 10°F cooler?” or “what if the cold reservoir in this network ends up being much larger than currently thought” and see if these potential risks could change their opinion of the choice of insulation, etc. 4. PREDICTING THE COSTS Rigorous thermal hydraulic IPM tools have a major advantage over lift curve based models when it comes to the assessment of the costs of a development. In deepwater tiebacks, subsea costs (wellheads to risers, umbilicals, etc) can be up to a third of the costs of the entire project (drilling, processing facility, etc). Though subsea processing can offer lower subsea CAPEX solutions, its greatest benefits are generally in terms of improved production, which may increase subsea costs such as additional kit, power and chemicals requirements, etc.

If the costs or savings of subsea processing are not adequately quantified in concept design, the project may enter Front End Engineering Design with a sub-optimal design that may necessitate costly “value enhancement” studies to change the concept, be it to or from a subsea processing solution. Late changes to concepts can cause delays in projects being sanctioned and hence “lost production”, as production from year 1 gets effectively delayed until several years later.

Whist a simple IPM tool could give an idea of the required diameter of a pipeline, they do not give reliable thermal hydraulic or compositional data (3). The total cost of the subsea tieback requires estimates of the pipeline diameters, wall thickness (including corrosion allowance), installation, insulation, umbilical and power cable requirements and remedial measures for any pipeline seabed stability or thermal expansion issues, etc. These require a significant amount of compositional and thermal hydraulic results (pressure, density and temperature profiles, carbon dioxide fugacities, phase velocities etc) throughout the production network and throughout time; as in general they vary significantly with the production profile.

Therefore, if the project has used a simple “lift curve” type IPM tool, a good understanding of the CAPEX of the system can only be determined once it has been re-modelled in a thermal hydraulic simulator. This creates an additional step between the revenue forecast and the CAPEX assessment and can slow down the progress of optimising the design. Economically marginal developments often require tens if not hundreds (20) of iterations between the forecast and facilities engineering team to find the right solution as they cannot afford to spend their way out of a technical problem such as using Corrosion Resistant Alloy pipes (19) or high performance insulation.

Given subsea processing capacity can be the main constraint to the production profile and (as discussed in Section 2) lift curve type IPM tools are expected to have greater errors in estimating the hydraulics of such systems; more iterations may be required between “flow assurance” and forecasting before a physically realistic solution is found.

With additional steps between “production” and “CAPEX” forecasts comes the risk of additional and unnecessary design margins to the design and cost estimate. For example, it is typical for thermal hydraulic simulations that following a simple IPM forecast to assume “conservative” flowing well head temperatures (FWHT) rather than simulating the well and Joule Thomson cooling effect across the choke. Choosing a conservative FWHT is not easy, especially as different engineering disciplines have different concepts of what is “conservative”. For example, engineers sizing the insulation to avoid wax deposition may consider low temperatures to be conservative, however as corrosion rate

increases with temperature, corrosion engineers may consider that to be under conservative. Furthermore, in general the prediction of FWHT cannot be decoupled from the hydraulic calculation of the downstream and upstream system.

Figure 7 FWHT vs rate, reservoir pressure and FWHP

For example, Figure 7 is a plot of FWHT versus flow rate for a well with different reservoir pressures and flowing wellhead pressures (FWHP), covering the range that is typical throughout the life of a high pressure high temperature (HPHT) reservoir. As can be seen, the FWHT (i.e. the temperature into the pipeline) is a function of the back pressure from the pipeline (i.e. the WHFP) and hence to decouple the FWHT calculation from the pipeline thermal hydraulics would require iteration between a pipeline and a well simulator. Traditionally, engineers have a choice of picking a conservative design case from plots like Figure 6 or developing some sort of bespoke IPM simulator that uses spreadsheets, look-up tables, correlations and/or bespoke software such as that described in Reference 2, 3, 13 and 16 to ensure a reasonable FWHT is used. However, such bespoke methods are difficult to check and hence easy to make mistakes in. 5. FLOW ASSURANCE CASE STUDIES The following case studies are simplified versions of real studies carried out by the authors. They help illustrate some of the typical flow assurance issues found in subsea processing systems and how they can be evaluated in a compositional, thermal hydraulic Integrated Production Model. 5.1 A Deepwater Oil Gas/Liquid Subsea Separation Systems Subsea separation ranks as the most targeted technology for rapid development and application due to its huge potential for cost savings by moving some of the traditional topsides fluid processing to seabed (11). An overview of available technologies for gas/liquid separation in deep water is given in Reference 6. A summary of the subsea separation installations can be found in Reference 11. Some subsea separation concepts include water removal for reinjection into the reservoir to aid pressure support and to enable increased production to a water processing bottlenecked facility. However, subsea water removal was not considered for this project as the Operator’s subsurface engineers were concerned about the effect of trace quantities of oil in the injection water reducing the injectivities of the water injection wells.

0

20

40

60

80

100

120

140

0 10 20 30 40 50 60 70 80 90 100

Wel

l Hea

d Te

mpe

ratu

re d

/s o

f Ch

oke

(°C)

Flow Rate (MMscfd)

Pres=1200bara, FWHP=90bara

Pres=700bara, FWHP=90bara

Pres=200bara, FWHP=90bara

Pres=1200bara, FWHP=60bara

Pres=700bara, FWHP=60bara

Pres=200bara, FWHP=60bara

Pres=1200bara, FWHP=30bara

Pres=700bara, FWHP=30bara

Pres=200bara, FWHP=30bara

Figure 8 Typical system used for modelling two-phase separator life of field

production profile forecasting simulation Figure 8 shows a two well subsea separator system for illustrative purposes. The reservoirs were modelled as “Table Models”; which in this case are tables of reservoir pressure, completion productivity index, fluid GOR and watercut versus cumulative oil production. These curves were obtained from a reservoir simulation for a more simplified assumption of the network; in this case a fixed wellhead pressure. Such tables have their limitations and need to be updated if the production profile is grossly different from the one that generated the original table. However, they enable the facilities teams to have a representation of the reservoir whilst quickly investigating many hundreds of permutations of the subsea system. In later stages of design, when the concept has been selected and more time can be spent on each simulation, a dynamic link between the IPM and reservoir simulator may be more appropriate.

Also specified in the reservoirs is a base composition; in this case a characterised composition based on lab analysis of a sample. At each timestep, the IPM interfaces with a thermodynamic simulator (in this case InfoChem’s Multiflash) to flash and recombine this base composition to achieve the GOR and watercut as specified by the table. This composition and Multiflash are then used to calculate the phase flow rates and transport properties for the thermal hydraulic simulation of the flow path to the seabed (marked Tubing in Figure 8). The energy balance in the thermal hydraulic simulation takes into account the heat loss to the environment, kinetic and gravitational energy gains to obtain an accurate flowing wellhead temperature. A molar balance determines the composition in the rest of the network and this composition is used (with Multiflash) to predict the thermal hydraulics of the rest of the network. As discussed earlier, the operating temperature of the separator can impact on the rates from each well and the split between the two outlets.

The separator model requires the user to input the separator efficiencies, i.e. what proportion of each phase goes to each outlet. These have been fixed, but can be made a function of flowing parameters based on information from subsea separator vendors.

In this case, the arrival pressure of the wet gas pipeline was fixed at a value commensurate with the stage of compression it was routed to on the topsides facilities, as was the liquids pipeline arrival pressure; which could be routed to a different stage of separation. The wet gas tieback and the liquids pipeline cannot both determine the separator operating pressure as they will not necessarily have the same inlet pressure; one must be choked or boosted to match the other. In this case, it was decided that the wet gas pipeline would determine the operating pressure and that this would be lower than the operating pressure of the liquids pipeline, requiring the liquids from the separator to be pumped into the liquids pipeline. The main alternative would be to operate the separator

at the liquids pipeline inlet pressure and choking upstream of the wet gas pipeline; this would not require a subsea pump, but it was quickly shown that this cost saving was small compared to the lost production due to the increased back pressures on the wells. Hence, as described earlier, the subsea separator temperatures and pressures were uncontrolled and allowed to “float”.

The main flow assurance concerns of this particular system were: Issue 1. The back pressure on the wells, particularly in late life. Issue 2. The size of pump required to achieve the preferred mode of operation. Issue 3. The hydrate management strategy of the Wet Gas Pipeline (MEG injection). Issue 4. The hydrate management of the liquids pipeline (insulation and blowdown). Issue 5. Wax management in the liquids pipeline (insulation). Issue 6. Wax management in the wet gas pipeline. Issue 7. Restart, pigging and ramp-up surges in the wet gas pipeline (surge volume). Issue 8. Restart, pigging and ramp-up surges in the liquids pipeline (operating above the bubble point plus surge volume for liquid/liquid surges). Issue 9. Corrosion in the wet gas pipeline. Issue 10. Corrosion in the liquids pipeline (corrosion inhibitor).

Issues 1, 3, 7 and 9 are typical issues for a wet gas pipeline that, as discussed earlier, benefit from an accurate thermal hydraulic and compositional simulation of the system. The added complexity here is that the system is conjoined to a liquids system via a separator with an unspecified pressure; hence pressure surges in one will affect the other. A quick study of the transient issues using steady state IPM results (using methods described in 4) concluded that both the wet gas and the liquids pipelines needed to be routed to the same slug catcher; meaning that the potential benefits of routing them to different stages of compression could not be exploited.

Issues 2, 4 and 8 required the oil and water flow in the liquids pipeline to be modelled accurately, in particular;

The effect of the pump shear; type of dispersion formed, residence time taken to break and for slip to occur between the liquids, what is the effect of the choice of corrosion inhibitor (injected to solve issue 10) on this? What are the benefits of emulsion breakers?

The water hold-up in the liquids pipeline if slip does occur between the liquid phases.

Issue 6 was investigated without selecting a separator vendor by investigating a range of separator efficiencies to determine the critical efficiency, above which negligible wax components are expected to enter the wet gas pipeline. This critical efficiency and life of field thermal hydraulic results can then be used as a sizing case for the separator manufacturer.

In this example, commercially available three phase flow models were used to simulate the pipelines (OLGAS 7.2 and LedaPM 1.2). It was found that OLGAS and LedaPM gave approximately the same resistances in the wells and wet gas pipelines for this particular system, which resulted in near identical production profiles. Figure 9 plots the calculated liquids pump power requirement for the first 10 years of production life. For reference, also plotted is a case called “Woelflin (1942)”; this is an identical model to the OLGAS 7.2 case except a homogeneous flow model is selected for the liquids pipeline and riser, using the Woelflin (1942) “loose emulsion” viscosity correlation (22).

As can be seen, though the separator pressure profiles and liquids rates were very similar between the three cases, the peak power requirement was highest for the OLGAS 7.2 case, closely followed by the Woelflin case. In this case, the OLGAS 3 phase model

predicted homogeneous flow for the liquids pipeline throughout life, this explains why it matches the Woelflin case, which presumably has a similar effective viscosity correlation under these conditions. The phase inversion point for both models was set to 60% water volume fraction, which occurs in year 8.2 for both models.

Figure 9 Pump Power Requirement

The LedaPM model predicts an oil/water slip ratio of up to 1.2 in the liquids line in early life (low watercuts) which gradually changes to 0.88 in late life, when the watercut is greater than 80%. LedaPM model predicts a slightly lower peak power requirement than the OLGA version (0.97 rather than 1.06MW) but this is considered to be well within the margin of error and hence are practically the same with regards pump sizing criteria. Power requirement can be a constraint to production; either at the supply, the power cables or the pump itself. Following such a study, the detailed results from this “unconstrained” pump can be discussed with Topsides Electrical Engineers as well as pump and subsea cable manufacturers to see if this is the case and whether or not such constraints need to be added to the model and if necessary, pump curves can be added in which the pump’s expected efficiency and pressure gain can be made a function of the volumetric flow rates, fluid densities and viscosities based on tests done by the manufacturer.

The accuracy of liquid/liquid multiphase models was a concern and though lab work could be done to investigate emulsion viscosity and stability versus shear history, etc. They are usually at conditions significantly different to those expected in the liquids pipeline (i.e. small diameters, dead oil rather than live, etc.) and it is not obvious how they can best be extrapolated back to live conditions. As subsea gas/liquid separation takes off in larger developments of distributed drilling centres, networks of wet gas pipelines and liquid/liquid pipeline systems may become commonplace. Therefore, better mixing rules for liquid/liquid blends (of different watercuts and shear histories) will be required if these systems are to be properly sized and operable. 5.2 Subsea Compression System One fast-growing technology for large fields requiring pressure boosting is subsea gas compression technology, which improves production and recovery from the reservoir by reducing back pressure on the wells. Subsea compression can be used to extend production from mature fields or provide initial support for production for remote fields with long tiebacks (14). Adding energy to the production fluid via compressors to

0

0.2

0.4

0.6

0.8

1

1.2

0 2 4 6 8 10 12

Pum

p Po

wer

(M

W)

Year

LedaPM 1.2

OLGAS 7.2

Woeflin (1942)

produce more hydrocarbons, more quickly; enabling long distance gas tiebacks and avoiding topside facilities are the value drivers of this technology (6).

A screenshot of a greatly simplified version of a recent subsea compressor IPM study is shown in Figure 10. The performance of the reservoirs, wells and pipelines are modelled; the fluids leaving the reservoir are assumed to be saturated with water at bottom hole conditions; due to the shape of the water saturation curve, this means that the concentration in the produced fluids increases as the reservoir pressure drops. This is simulated with the CPA model in InfoChem’s Multiflash, as was the process of the hydrocarbon composition becoming more “lean” through time as the reservoir pressure declines into the two phase region and the heavier liquid hydrocarbons are left in the reservoir (21).

 Figure 10 Subsea gas compression modelling system

The compressor can be bypassed, act as a conventional gas/liquid separation and compression system (with the liquids either rejected downstream of the compressor or pumped into another pipeline) or act as a wet gas compressor (7).

The key flow assurance issues of this system were: Issue 1. When the subsea compressor was required. Issue 2. Hydrate avoidance in the export pipelines. MEG injection was chosen. Issue 3. Top of well erosion due to low suction pressures into the compressor. Issue 4. Top of line corrosion due to high inlet temperatures into the uninsulated wet gas pipeline. Cooling spools were selected. Issue 5. Restart, pigging and ramp-up surges in the wet gas pipeline. LNG plant surge volume requirement.

To assess items 1 and 5 throughout life requires a three phase simulator and as discussed above, such models are only being used properly when the correct phase flow rates and properties are being used (i.e. a compositional simulation). Item 2, 4 and 5 require knowledge of the composition from the reservoir (particularly water content) and the thermal hydraulics of the pipelines to predict the water condensation rates throughout the network throughout field life. Item 4 is affected by the discharge temperature from the compressor and the MEG injection rate, which typically increases the water flow rate by ~50wt%. Hence to some extent many of the first four items are interdependent; i.e. may require numerous iterations to find a solution for all issues. With a compositional and thermal hydraulic IPM, the speed at which these issues are solved increases and some can be done simultaneously within the tool. For example, on a typical subsea compression study with such a tool, the above flow assurance issues are addressed like this;

Issue 1; Determine the date when compression was required, by adding events to the model to bypass the compressor until the system was about to drop off plateau. Issue 2; Add logic to control the rate from wellhead MEG injection points (see Figure 10) to track the condensed water rates in the flowlines through time to ensure the fluids were sufficiently dosed to avoid hydrates (see Figure 11 as example results).

Issue 3;monitorsimulatoIPM disvelocitycompresIssue 4;IPM, thlength. spool wthe IPMIssue 5turndowgenerallpossiblesimulatotransien

Figure 11 M 6. CONC Representinof sale in managing thfacilities. Hsufficient dethe system noptimising particularly multiple iteeconomic soto significanmultiple reapplicationssubsea proceproduction forecast. Thand inlet teprocessing cmany key flto a re-evaluconcept late

; As API 14E Rred by exportinor. Though thissciplines, in thiy which was addssor speed) in o; Similarly, tophough this quic

This was not uwas of sufficientM ensured that th

; Life of fieldwn scenarios froly sufficient fore within a reasoor studies in l

nt simulations re

MEG injection

CLUSIONS

ng the key resistone model (i.he interdepende

However, most ietail that they cneeds to be remthe design ofpertinent to ecorations betweeolution. It is alsnt errors in theservoirs netwo

s. In most subsessing kit (sepaand hence if n

he performance emperatures ancan lead to a flow assurance iuation of the C

er in design. Th

RP was not deeg fluid velocitys could have les, like many otded to logic in

order to avoid thp of line corrosckly concludedused to trigger et length that cohe cooling spood liquid steady om the IPM canr conceptual denable time framlater stages ofequired by an or

n rate through

tances to flow ine. an Integrateency of the hydintegrated prodcan generate tr

modelled in a mof a system wionomically marn the productioso argued that te production foorks with diffsea processing arator and/or conot representedof processing end pressures.

false understandissues. If these

CAPEX of a suhe paper gave t

emed to be sufy and density red to many itether projects, it the IPM to trig

he problem. ion was model

d with a maximevents, but as auld be seen dur

ol was sufficientstate hold-up

n be used to estesign; proving tme and can be uf design; potenrder of magnitu

time for the su

n the system beed Production draulic modellinduction modellinrustworthy estimore detailed simith respect to rginal developmon forecast andthe simple methorecast, particulferent composi

applications, aompressor and/od properly can equipment is strWorse still, p

ding of the opee are not resolvubsea processintwo case studie

fficient for this results to a morerations betweet concluded witgger events (su

lled offline usinmum condensaa measure of w

uring runtime. Atly long throughresults at normtimate surge vothat such transiused to focus trantially reducinude or more.

ubsea gas comp

etween the reserModel) is an

ing of the subsung tools do notmates of tempe

mulator. This slorevenue and

ments where thed CAPEX estihods in many Ilarly in gas coitions and/or sat some criticaor pump) is the

lead to a falsrongly dependepoor IPM moderability of the ved early in desng project, or wes based on rea

case, erosion wre detailed erosen the erosion ath a maximum ch as reducing

ng results fromation rate per u

whether the coolA few iterationshout life. mal operating aolumes (4). Thiient operations ansient multiph

ng the number

pression examp

rvoir and the poefficient way

urface and surft model systemseratures and heows the processCAPEX. This

ere may need tomation to find

IPM tools can londensate systesubsea processal point in life

main constrainse estimate of ent on compositdelling of subsystem, includ

sign, they can lworse, a changeal projects to sh

was sion and gas the

m an unit ling s of

and s is are

hase of

 ple

oint of

face s to nce s of s is o be

an ead ms,

sing the

nt to the

tion bsea ding ead e of how

how a compositional, thermal hydraulic Integrated Production Model can be used to get a much better picture of the feasibility of a subsea concept. With such a tool, conclusions of the techno-economic feasibility of a subsea processing concept can be drawn much earlier in design, leaving fewer surprises for later stages of design.

If subsea processing is to take off as expected, liquid/liquid pipelines will become more common place in upstream production. The accuracy of commercially available three phase models in liquid/liquid systems is unknown to the authors. However, it is expected that more will be expected of liquid/liquid hydraulic models in the near future. Better mixing rules for liquid/liquid blends (of different watercuts and shear histories) will be required if networks of subsea separation systems are to be properly sized. 7. NOMENCLATURE CAPEX Capital Expenditure CGR Condensate Gas Ratio at stock tank conditions CPA Cubic Plus Association FWHP Flowing Wellhead Pressure FWHT Flowing Wellhead Temperature GOR Gas Oil Ratio at stock tank conditions HSE Health and Safety Essentials IPM Integrated Production Modelling LedaPM Steady State Multiphase flow model from Kongsberg LGR Liquid Gas Ratio at stock tank conditions LNG Liquefied Natural Gas MEG Mono Ethylene Glycol MMscf Million Standard Cubic Feet MMscfd Million Standard Cubic Feet per day Mstb/d Thousands of stock tank barrels per day MW Mega Watts OLGAS Steady State Multiphase flow model from Schlumberger OPEX Operational Expenditure stb Stock tank barrel WC Watercut REFERENCES 1. Bass, R. Subsea Processing and Boosting – Technical Challenges and Opportunities.

2006. OCT Offshore Technology Conference, Houston, TX, USA, May 1-4. OCT 18261.

2. Correa Feria, C. 2010. Integrated Production Modeling: Advanced but, not Always Better. SPE Latin American and Caribbean Petroleum Engineering Conference, Lima, Peru, December 1-3. SPE 138888.

3. Di Lullo, A., Mantagazza, T., Omarini, P., Rossi, R. and Ursini, F., 2011, From Integrated Asset Model to Integrated Flow Assurance Model: A Step Forward in the Desgn of Complex O&G Fields, Offshore Mediterranean Conference and Exhibition, 23-25 March, Ravenna, Italy, OMC-2011-048.

4. Fan, Y. and Danielson T.J., Use of Steady State Multiphase Models To Approximate Transient Events, 2009, SPE Annual Technical Conference and Exhibition.

5. Fantoft, R. Subsea Gas Compression – Challenges and Solutions. 2005. OTC Offshore Technology Conference, Houston, TX, USA, May 2-5. OCT 17399.

6. Hannisdal, A., Westra, R., Akdim, M. et al. 2012. Compact Separation Technologies and Their Applicability for Subsea Field Development in Deep Water. Offshore Technology Conference, Houston, Texas, USA, 30 April–3 May. OTC 23223.

7. Hassan, Z. Subsea Field Development Methodology, Drivers and Future Trends. 2013. Subsea Australasia Conference. February 20-22.

8. Johnson, A. E., Bellion, T., Lim, T., Montini, M. and Humphrey, A I., “Managing flow assurance uncertainty through stochastic methods and life of field multiphase simulation”, 16th International Conference on Multiphase Production Technology, Cannes, France, June, 2013.

9. Jordan, D. 2009. A Global Perspective on the Future of Subsea Technology. SUT Subsea Technical Conference, Perth, Western Australia. February 17-19.

10. Montini, M., Humphrey, A., Watson, M, et al. 2011. A Probabilistic Approach to prevent the Formation of Hydrates in Gas Production Systems. In Proceedings of the 7th International Conference on Gas Hydrates (ICGH 2011), Edinburgh, Scotland, United Kingdom, July 17-21.

11. Parshall, J. 2008, Evolving Subsea Technology Tackles Huge New Risks of Today’s Projects. Journal of Petroleum Technology, May, pp. 40-47.

12. Pike, R., Gill, J. and Karuppuppasamy, A., “North Sea Platform Production Enhanement – Integrated Design Approach to Flash Gas Compression Re-rating”, 2013 GPA 30th Annual Conference, Edinburgh,

13. Rotondi, M., Cominelli, A., Di Giorgio, C. et al. 2008. The Benefits of Integrated Asset Modelling: Lessons Learned from Field Cases. SPE Europec/EAGE Annual Conference and Exhibition, Rome, Italy, June 9-12. SPE 113831-MS.

14. Subsea Separation Emerges as the Best Subsea Technology in Demand. 2013. http://www.oilandgasforum.com.ng/oil-gas-industry/subsea-separation-emerges-as-the-best-subsea-technology-in-demand/. June 7.

15. Thomas, M. Subsea gas compression to boost recovery rates. 2012. http://www.epmag.com/item/Subsea-gas-compression-boost-recovery-rates_104653. August 3.

16. Ursini F., Rossi R., Pagliari, F. 2010. Forecasting Reservoir Management through Integrated Asset Modeling. SPE North Africa Technical Conference and Exhibition, Cairo, Egypt, February 14-17. SPE-128165.

17. Value Walk Article, Six Tech Advancements Which Are Changing Oil & Gas Usage, 17th July 2013, http://www.valuewalk.com/2013/07/six-tech-advancements-which-are-changing-oil-gas-usage/

18. Vinterstø, T. 2013. Subsea Gas Compression Now and in the Future. Lillehammer Energy Claims Conference, Norway, March 6-8.

19. Watson, M. J., Hawkes, N. J., Luna-Ortiz, E. and Pickering, P., Application of advanced chemical process design methods to integrated production modelling, 15th International Conference on Multiphase Production Technology, Cannes, France, June 15 – 17, 2011.

20. Watson, M., Hawkes N., Pickering P., et al. 2006. Integrated Flow Assurance Modelling of the BP Angola Block 18 Western Area. SPE Annual Technical Conference and Exhibition, September 24-27. SPE 101826-PA.

21. Watson, M., Hawkes, N., Pickering, P., et al. 2008. Efficient Conceptual Design of an Offshore Gas Gathering Network. SPE Asia Pacific Oil & Gas Conference and Exhibition, October 20-22. SPE-116593-PP.

22. Woelflin, W. (1942) The viscosity of crude oil emulsions, API Drilling and Production Practice, 148-153.