The AlpTransit Gotthard Project
Enginyers Industrials de Catalunya15 october 2014
Dr. Renzo SimoniCEO
AlpTransit Gotthard Ltd
2
AlpTransit Gotthard AG
LZ01
-453
742
Final breakthrough
3
AlpTransit Gotthard AG
LZ01
-453
742
Contents
1. Project overview
2. Challenges
3. Reminiscences from the construction period
4. The project today
4
LZ01
-453
742
1. Project Overview
5
AlpTransit Gotthard AG
LZ01
-453
742
Transalpine goods traffic
6
AlpTransit Gotthard AG
LZ01
-453
742
Journey times Zurich - Lugano / Basel - Lugano
7
AlpTransit Gotthard AG
LZ01
-453
742
NRLA decision 1991
8
AlpTransit Gotthard AG
LZ01
-453
742
A flat railway route through the Alps
9
AlpTransit Gotthard AG
LZ01
-453
742
Key features of the only flat railway route through th e Alps
• Newly constructed twin-track route• Mixed operation• Maximum speed passenger trains: 250 km/h• Maximum speed goods trains: 160 km/h• 50 – 80 passenger trains per day• 220 – 260 goods trains per day• Loaded vehicles: max. height 4.2 m• Max. gradient: ≤≤≤≤ 12.5 ‰• Min. radius: ≥≥≥≥ 5,000 metres• Useful life: 100 years• Max. temperature: 40 °°°° C
10
LZ01
-453
742
2. Challenges
11
AlpTransit Gotthard AG
LZ01
-453
742
Challenge – implementation organisation
• Direct management, simple control
• Transparency through direct parliamentary control
• Clear allocation of responsibilities, best governance
• Efficiency thanks to lean organisation (short paths, simple decision processes)
12
AlpTransit Gotthard AG
LZ01
-453
742
Challenge planning and processes
13
AlpTransit Gotthard AG
LZ01
-453
742
Allocation of Public Transport Financial Fund (FinöV)
Heavy road vehicletax (64%)
Heavy road vehicletax (64%)
Oil tax(23%)
Oil tax(23%)
Value added tax(VAT) (13%)
Value added tax(VAT) (13%)
Fund for the financing of public transport
Fund for the financing of public transport
NRLA (45%)New Rail Link through the Alps
NRLA (45%)New Rail Link through the Alps
Rail 2000 Phase 1and ZEB (44%)ZEB: Future Development of the Railway Infrastructure
Rail 2000 Phase 1and ZEB (44%)ZEB: Future Development of the Railway Infrastructure
HSR (4%)European High-Speed Rail Network
HSR (4%)European High-Speed Rail Network
Noise mitigation (7%)
Noise mitigation (7%)
14
AlpTransit Gotthard AG
LZ01
-453
742
Swiss Government Decision
c. Gotthard route 13 157
Total 19 100
15
AlpTransit Gotthard AG
LZ01
-453
742
Development of final cost and risk potential
16
AlpTransit Gotthard AG
LZ01
-453
742
Erstfeld Amsteg Sedrun Faido Bodio
Access adit
Ventilation shaft
Shafts I & II
MFS Sedrun
MFS Faido
Access adit
Cable tunnel
Access adit
Waste airFresh air
Challenge safety
17
AlpTransit Gotthard AG
LZ01
-453
742
Challenge geology I
18
AlpTransit Gotthard AG
LZ01
-453
742
Challenge geology II
19
AlpTransit Gotthard AG
LZ01
-453
742
Time-lapse - execution
20
LZ01
-453
742
3. Reminiscences from the construction period
21
AlpTransit Gotthard AG
LZ01
-453
742
Challenges – for example the Piora Syncline
22
AlpTransit Gotthard AG
LZ01
-453
742
Faido 1996: exploratory bores, Piora
23
AlpTransit Gotthard AG
LZ01
-453
742
Sedrun 1998: tunnel constructors in shaft
24
AlpTransit Gotthard AG
LZ01
-453
742
Sedrun 2003: deformable steel inserts
25
AlpTransit Gotthard AG
LZ01
-453
742
Lakefill Uri: 2003 - 2006
26
AlpTransit Gotthard AG
LZ01
-453
742
Erstfeld 2006: preliminary cut, view towards portal
27
AlpTransit Gotthard AG
LZ01
-453
742
Faido East 2008: rock-pressure damage
28
AlpTransit Gotthard AG
LZ01
-453
742
Amsteg 2009: surface installations site
29
LZ01
-453
742
4. The Project Today
30
AlpTransit Gotthard AG
LZ01
-453
742
Installation progress railway technology, September 1, 2014
31
AlpTransit Gotthard AG
LZ01
-453
742
Bodio: laid ballastless track, catenary, GSM-R cable
32
AlpTransit Gotthard AG
LZ01
-453
742
Faido-Bodio: start of pilot operation
33
AlpTransit Gotthard AG
LZ01
-453
742
Commissioning
34
AlpTransit Gotthard AG
LZ01
-453
742
Vision
•• Commercial openingCommercial openingGotthard Base Tunnel:Gotthard Base Tunnel:December 2016December 2016
•• Commercial openingCommercial openingCeneri Base Tunnel:Ceneri Base Tunnel:December 2019December 2019