THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision...

44
THE AIRPORT DECISION Key to London’s Growth Strategy Professor Sir Peter Hall Shaping a Growing London: The Place of an Airport Stratford Wednesday 18 th June 2014

Transcript of THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision...

Page 1: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

THE AIRPORT DECISION

Key to London’s Growth Strategy

Professor Sir Peter Hall

Shaping a Growing London:

The Place of an Airport

Stratford

Wednesday 18th June 2014

Page 2: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: London’s People

Page 3: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: London’s People

Page 4: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: London’s People

Page 5: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: London’s People

Page 6: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

London house prices rise 18% in year fuelling fears of bubble Nationwide's figures put London house prices above pre-crisis peak at an average £362,699, as

gap widens with rest of UK Hilary Osborne

The Guardian, Wednesday 2 April 2014 07.42 BST

London’s People: A Basic Dilemma

Page 7: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

London’s People: A Basic Dilemma

Page 8: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

London’s People: A Basic Dilemma

Page 9: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

London’s People: A Basic Dilemma

Page 10: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

London’s People: A Basic Dilemma

Page 11: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

On this basis, the central projection in the SHMA indicates that London will require between approximately 49,000 (2015-2036) and 62,000 (2015-2026) more homes a year. This range incorporates different levels of population change over the period, the time taken to address current need (backlog) and the anticipated under delivery between 2011 and 2015. The 2015-2036 figure of 49,000 additional homes a year provides the basis for the detailed housing need figures set out in this Plan. In light of the projected higher need, especially at the start of the plan period, this figure should be regarded as a minimum.

Page 12: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: London’s Economy

Page 13: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: London’s Economy

Page 14: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: London’s Economy

Page 15: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: Social Makeup

Page 16: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014:London’s Transport

Page 17: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Plan 2014: Key Diagram

Page 18: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Headlines: London 2020

• Zone 1: All the Advanced Service Jobs (Mega-

Agglomeration Economies – but Big Capital

pushes out Creative Startups?)

• Zone 2: Über-Middles (and displaced startups?)

• Zone 3: Displaced Cling-Ons (Chattering Classes)

– especially Zone 3 East (Victoria Line,

Overground) - Critical role of Opportunity Areas,

especially Stratford/Royals

• Zones 4/5: The big dilemma

• Thames Gateway: unique: major opportunity sites

close to London (elsewhere: NIMBY frontier)

Page 19: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Big Question: Where will the People Go?

• They can’t fit in London

• The figures don’t add up!

• They can’t go next to London:

• The “sacred” Abercrombie plan

• Plus: Massive NIMBYism

• Must go much further out

• Beyond the NIMBY frontier

• So: 50-80-mile ring

• Except: Thames Gateway:

growth welcome here!

Page 20: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

1998 / 2014: “Sociable Cities”

• At edge of Greater

South East

• 50-80 miles (80-

130 km.) from

London

• On high-speed rail

lines – fast travel

to London for

those who need

• Clusters of Garden

Cities – Howard’s

Social City

Page 21: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

1998 / 2014: “Sociable Cities”

• At edge of Greater

South East

• 50-80 miles (80-

130 km.) from

London

• On high-speed rail

lines – fast travel

to London for

those who need

• Clusters of Garden

Cities – Howard’s

Social City

Page 22: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

1998 / 2014: “Sociable Cities”

• At edge of Greater

South East

• 50-80 miles (80-

130 km.) from

London

• On high-speed rail

lines – fast travel

to London for

those who need

• Clusters of Garden

Cities – Howard’s

Social City

Page 23: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Thames Gateway Visions: 1995, 2003

Page 24: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Thames Gateway Visions: 1995, 2003

Page 25: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Thames Gateway:

Stratford 1999, 2012, 2020

Page 26: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Thames Gateway:

Stratford 1999, 2012, 2020

Page 27: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Thames Gateway:

Stratford 1999, 2012, 2020

Page 28: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Barking Riverside: “Stuck Site” –

at last Unstuck?

• Long in gestation

• Little development

• Poor quality

Page 29: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Barking Riverside: “Stuck Site” –

at last Unstuck?

• Long in gestation

• Little development

• Poor quality

• Density controversy

• Higher density:

Needs Rail (DLR,

now Overground)

• Some progress?

Page 30: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Barking Riverside: “Stuck Site” –

at last Unstuck?

• Long in gestation

• Little development

• Poor quality

• Density controversy

• Higher density:

Needs Rail (DLR,

now Overground)

• Some progress?

Page 31: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Barking Riverside: “Stuck Site” –

at last Unstuck?

• Long in gestation

• Little development

• Poor quality

• Density controversy

• Higher density:

Needs Rail (DLR,

now Overground)

• Some progress?

Page 32: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Barking Riverside: “Stuck Site” –

at last Unstuck?

• Long in gestation

• Little development

• Poor quality

• Density controversy

• Higher density:

Needs Rail (DLR,

now Overground)

• Some progress?

Page 33: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Barking Riverside: “Stuck Site” –

at last Unstuck?

• Long in gestation

• Little development

• Poor quality

• Density controversy

• Higher density:

Needs Rail (DLR,

now Overground)

• Some progress?

Page 34: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

City of Kent:

Ebbsfleet: Stuck Site truly Unstuck?

Page 35: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

City of Kent:

Ebbsfleet: Stuck Site truly Unstuck?

Page 36: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

City of Kent:

Ebbsfleet: Stuck Site truly Unstuck?

Page 37: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

City of Kent:

Ebbsfleet: Stuck Site truly Unstuck?

Page 38: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

City of Kent:

Regenerating the East Kent Coast?

Page 39: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

City of Kent:

Regenerating the East Kent Coast?

Page 40: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

City of Kent:

Regenerating the East Kent Coast?

Page 41: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

Mayor’s Estuary Airport (Isle of Grain)

• Agricultural/reclaimed land

• Compatible with Thames Gateway strategy

• Noise: Impact less than 5% Heathrow equivalent

• Connections: New HSL (just over 30 mins); Crossrail extension; HS1

• Faster than LHR from many Central London locations

• Need to widen M25 – but compatible with current options

• Can be connected to HS2

• Some biodiversity and habitats impacts – but precedents for habitat migration

Page 42: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

21st-Century Garden City:

Shelter’s Wolfson Prize Vision

Page 43: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

21st-Century Garden City: Mayor’s Vision

• “Heathrow City”: New

residential quarter,

round transport hub

• Terminal buildings for

retail, town and

convention centre

• Focus on education

and commercial

research

• 80k homes, 90k jobs

• Value: £7.5bn a year

Page 44: THE AIRPORT DECISION - Transport for London · 21st-Century Garden City: Mayor’s Vision •“Heathrow City”: New residential quarter, round transport hub •Terminal buildings

So: Today’s Key Question!

• 2030: Short-

Term Airport

Fix for

London?

• 2050:

Strategic

Vision for

the Greater

South East?