The 3D Model Information Platform Management Technology for
NI Construction
Jiayou, CAI (Joy)蔡加友
China Nuclear Engineering Group Corporation (CNEC)
6/22/2015 18:41 p2
Mapping of NPPs Built by CNI-HXCC
• Pakistan: 6 Units: 2+4 • China: 32 Units: 15+17/30
VVER1000 2 Units
CAP1400 2 Units
CPR1000+ 2 Units
CPR1000+ 4 Units
ACP300 2 Units ACP1000 2 Units
CPR1000+ 2 Units
CPR1000+ 4 Units
EPR 1 Unit
6/22/2015 18:41 p3
3D PDMS Model
6/22/2015 18:41 p4
1. Briefing
3. Establishment
2. Framework C O N T E N S
4. Function
5. Application
6/22/2015 18:41 p5
1. Briefing of 3D Model Virtual Information Platform Management Technology
—— Based on PDMS(Plant Design Management System) and P6
—— Integration of 3D Model with schedule(4D)
—— Integration of Construction Information
—— Visualized Construction Simulation
—— Multiple Specialization Construction Coordination
6/22/2015 18:41 p6
3D Model
Schedule & Progress
Construction Information
Integration of Schedule with 3D
model (4D)
Integration of Constr.
Information
Resources Balance & loading
3D PDMS Platform
2. Framework of 3D Model Information Platform
6/22/2015 18:41 p7
Subsection of Structural wall and slab WBS Coding System Developing Building Structure 3D
Model Based on PDMS Construction information Loading Scheduling, Integration Schedule with
3D Model(4D)
3. Establishment of 3D Model Information Platform
6/22/2015 18:41 p8
Data search Scheduling Visualized Construction
Arrangement General Progress Control
4. Function of 3D Model Information Platform
6/22/2015 18:41 p9
Construction Information Integration:
Training
Technical Preparation
Safety Management
QA/QC
Lessons Learned
5. Application of 3D Model Information Platform
6/22/2015 18:41 p10
5. Application of 3D Model Information Platform
Scheduling 4D Management:
Schedule Analysis
Construction Logic Analysis
Monthly Milestone Setup
Progress Compare
Visualized Milestone Progress Control
Room Turnover
6/22/2015 18:41 p11
5. Application of 3D Model Information Platform(1)
Resources Loading:
Planned Quantities, BOM, etc.
Actual manpower, material, Equipment and Tools
Resources Balance
6/22/2015 18:41 p12
5. Application of 3D Model Information Platform(2)
Developed: CPR1000+, based on 14 units experiences
Being Developed: EPR, based on Taishan experiences
Being Developed: AP1000, based on Sanmen and Haiyang
To be Developed: CAP1400
6/22/2015 18:41 p13
Thanks!