Thames Gateway
description
Transcript of Thames Gateway
![Page 1: Thames Gateway](https://reader036.fdocuments.net/reader036/viewer/2022081511/5558553bd8b42a943b8b4b9c/html5/thumbnails/1.jpg)
Growth and regeneration in the Thames Gateway
SOUTH ESSEX
NORTH KENT
![Page 2: Thames Gateway](https://reader036.fdocuments.net/reader036/viewer/2022081511/5558553bd8b42a943b8b4b9c/html5/thumbnails/2.jpg)
A 21 ST CENTURY SOLUTION TO THE PROBLEMS OF LONDONS GROWTH. HOUSING, TRANSPORT, INDUSTRY, BUSINESS TO BE ALLOWED TO GROW IN A SECTOR EAST ALONG THE THAMES
![Page 3: Thames Gateway](https://reader036.fdocuments.net/reader036/viewer/2022081511/5558553bd8b42a943b8b4b9c/html5/thumbnails/3.jpg)
THE SCHEME INVOLVES USING GREEN BELT LAND TO THE EAST, DESTROYING THIS AND FRAGILE ENVIRONMENTS LIKE THE SHEARNESS MARSH
A NEW BUSINESS PARK AT BEAM REACH TO HAVE MANUFACTURING , WAREHOUSING, RESEARCH AND HIGH TECH INDUSTRIES
THE NEW LONDON GATEWAY PORT , INDUSTRIAL AND BUSINESS PARK AT SHELLHAVEN
![Page 4: Thames Gateway](https://reader036.fdocuments.net/reader036/viewer/2022081511/5558553bd8b42a943b8b4b9c/html5/thumbnails/4.jpg)
UP TO 100,000 NEW HOMES, MIXED ESTATES, WITH SUSTAINABLE QUALITIESSUCH AS GREENWICH MILLENIUM VILLAGE
INDUSTRIAL AND BUSINESS PARKS
TRANSPORT IMPROVEMENTS INCLUDING A 6 LANE BRIDGE
LINKS TO THE EAST LONDON 2012 OLYMPICS
![Page 5: Thames Gateway](https://reader036.fdocuments.net/reader036/viewer/2022081511/5558553bd8b42a943b8b4b9c/html5/thumbnails/5.jpg)
![Page 6: Thames Gateway](https://reader036.fdocuments.net/reader036/viewer/2022081511/5558553bd8b42a943b8b4b9c/html5/thumbnails/6.jpg)
Beam reach business park
![Page 7: Thames Gateway](https://reader036.fdocuments.net/reader036/viewer/2022081511/5558553bd8b42a943b8b4b9c/html5/thumbnails/7.jpg)
INVOLVES USING GREENFIELD AND BROWNFILED SITES. MARSHKLAND HABITATS AND RARE SPECIES OF BRDS MAY BE ENDANGERED.NEW ROADS AND INDUSTRY BRING POLLUTION, CONGESTIONIS THIS A SUSTAINABLE ANSWER?
![Page 8: Thames Gateway](https://reader036.fdocuments.net/reader036/viewer/2022081511/5558553bd8b42a943b8b4b9c/html5/thumbnails/8.jpg)
The gateway is just one of the proposed sectors of growth
M4 corridor to south Wales
M11 corridor to Cambridge
Towards Milton Keynes new town/city