Th2 Phase Ap5 1A Th2 · 2020. 6. 5. · Th2 Th1 Ce5 Ce5 Ce5 Ce5 Th1 Th2 Th1 Th1 Pt5 Pt5 Open Space...

1
700 0 700 0 720 0 225 210 210 215 220 225 225 230 235 240 245 210 215 220 230 210 235 240 245 250 255 260 220 215 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 23 24 25 26 27 28 29 30 17 18 19 20 21 22 4 11 5 12 6 13 7 14 8 15 9 16 10 17 1 2 3 18 24 19 25 20 26 21 27 22 28 23 29 30 31 32 33 34 35 36 37 38 1 2 3 1 2 300' Ac2 Th1 Th1 Th1 Th1 Ce5 Ce5 Ce5 Ce5 Ce5 Ce5 Ce5 Ce5 Th1 Ce5 Ce5 Ce5 Ce5 Ce5 Ce5 Th1 Th2 Ce5 Ce5 Th1 Th2 Th1 Ac2 Ac2 Th2 Th2 Th1 Pt5 Pt5 Pt5 Pt5 Pt5 Pt5 Pt5 Pt5 Pt5 Pt5 Pt5 Pt5 Ac2 Ac2 Ac2 Ac2 Ac2 Ac2 Ac2 Ac2 Th1 Ce5 Ce5 Ce5 Ce5 Ce5 Ce5 Th2 Th2 Ce5 Ce5 Ce5 Ce5 Fr7 Ap5 Ap5 Ap5 Th2 Th1 Th1 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Ap5 Ap5 Ap5 Fr7 Fr7 Fr7 Fr7 Fr7 Fr7 Ap5 Ap5 Ap5 Ap5 Ap5 Ap5 Fr7 Fr7 Fr7 Fr7 Ap5 Ap5 Ap5 Th2 Th1 Th1 Th1 Th1 Th1 Th1 Th1 Th1 Th2 Th1 Th1 Th2 Th1 Th1 Th1 Th1 Th1 Th1 Th1 Th2 Th1 Th1 Th1 Th1 Th1 Th1 Th1 Th1 Th1 Th1 Th1 Pe3 Th1 Th2 Th1 Th1 Th2 Th1 Th1 Th1 Th1 Pe3 Pe3 Pe3 Pe3 Pe3 Th1 Th1 Th1 Th1 Ce5 Ce5 Th2 Th1 Ce5 Ce5 Ce5 Ce5 Th1 O & Drainage Drainage/Service Trail Corridor Gateway Park West Entry Sign Cerulean Drive Park Gateway Park East Mail Kiosk Sunstone Way Seven O'Clock Drive Future Development Future Road Extension Seven Drainage/ Trail Corridor CN Rail Future Neighbourhood Commercial Service/ Trail Corridor Service/ Trail Corridor Existing & Future Pemberton Recreation Facilities Drive O'Clock Seven O'Clock Drive Sunstone Way Service/ Trail Corridor Mail Kiosk Gateway Park West Entry Sign Future Community Trail 7675 7669 7671 7673 7677 7676 7674 7672 767 3000 300 7426 7628 7630 7632 7624 7622 7620 7634 7636 7638 7640 7642 7644 7646 7648 7650 7652 7654 7655 7653 7651 7649 7647 7645 7643 7641 7639 7637 7635 7633 7631 0 50 100 m Crosland Doak Design.com PNE PRIZE HOME Phase 1B Phase 1A Park Park Keith McIvor 604.935.2650 keith@wrec.com This is not an offering for sale. Any such offering can only be made with a Disclosure Statement. The enclosed information while deemed to be correct, is not guaranteed. This document is preliminary and subject to approvals and final legal plans to be provided by a BC Land Surveyor. Dimensions shown are general and for convenience only. Setbacks shown may exceed zone minimums. Topographic contours shown are existing conditions and do not reflect future grades (Contour interval = 5m). Driveway access must be from the corresponding lot number and associated lettered road, no single family driveway access is permitted from Road-A. Vegetation massings shown are conceptual and may represent existing and or future plant massings. The developer reserves the right to make changes and modifications to the project design, specifications and features without notice. E &O.E. This advertisement/ document does not constitute offers of sale capable of acceptance without a Disclosure Statement. 3121 Alta Vista Road Whistler, BC V0N 1B3 604. 966-8309 info@CroslandDoakDesign.com CroslandDoakDesign.com CROSLAND DOAK DESIGN Landscape Architecture + Building Design A Project by Sunstone Ridge Developments Ltd. ILLUSTRATIVE SITE PLAN Phase-1B 1:600 (original) 2020.06.05

Transcript of Th2 Phase Ap5 1A Th2 · 2020. 6. 5. · Th2 Th1 Ce5 Ce5 Ce5 Ce5 Th1 Th2 Th1 Th1 Pt5 Pt5 Open Space...

Page 1: Th2 Phase Ap5 1A Th2 · 2020. 6. 5. · Th2 Th1 Ce5 Ce5 Ce5 Ce5 Th1 Th2 Th1 Th1 Pt5 Pt5 Open Space & Buffer Drainage/ Trail Corridor Drainage/Service Trail Corridor Gateway Park West

7000

7000

720

0

225

210

210

215

220

225

225

230

235

240

245

210

215

220

230

210

235

240

245

250

255

260

220

215

1112

1314

1516

12

34

56

78

910

2324

2526

2728

2930

1718

1920

2122

4

11

5

12

6

13

7

14

8

15

9

16

10

17

12

3

18

24

19

25

20

26

21

27

22

28

23

29 3031

3233

3435

3637

38

12

3

1

2

300'

E101 E101

E101E101 E101 E101

E101E101

Ac2

Th1

Th1

Th1

Th1

Ce5Ce5

Ce5Ce5

Ce5Ce5

Ce5Ce5

Th1

Ce5Ce5

Ce5Ce5

Ce5Ce5

Th1

Th2

Ce5Ce5Th1

Th2

Th1

Ac2Ac2

Th2

Th2

Th1

Pt5Pt5

Pt5Pt5Pt5Pt5

Pt5Pt5Pt5Pt5

Pt5Pt5

Ac2

Ac2

Ac2

Ac2

Ac2

Ac2

Ac2

Ac2

Th1

Ce5Ce5

Ce5Ce5

Ce5Ce5

Th2

Th2

Ce5Ce5Ce5Ce5

Fr7

Ap5

Ap5Ap5

Th2

Th1

Th1

Fr7

Fr7 Fr7

Fr7

Fr7Fr7

Fr7

Fr7

Fr7

Fr7

Fr7

Fr7

Fr7

Fr7

Fr7

Fr7

Fr7

Ap5Ap5

Ap5Fr7

Fr7

Fr7

Fr7

Fr7

Fr7Ap5

Ap5Ap5

Ap5

Ap5

Ap5

Fr7

Fr7

Fr7

Fr7

Ap5 Ap5Ap5

Th2

Th1

Th1

Th1Th1

Th1

Th1Th1

Th1

Th2

Th1

Th1

Th2

Th1

Th1

Th1Th1

Th1

Th1

Th1

Th2

Th1

Th1

Th1

Th1

Th1

Th1

Th1

Th1Th1

Th1

Th1

Th1Th1

Th1

Pe3

Th1

Th2

Th1

Th1Th2

Th1

Th1

Th1

Th1

Th1

Th1

Th1

Pe3Pe3

Pe3

Pe3

Pe3

Th1

Th1

Th1Th1

Ce5Ce5Th2

Th1

Ce5Ce5

Ce5Ce5

Th1

Th2

Th1

Th1

Pt5Pt5

Open Space& Buffer

Dra

inag

e/ T

rail

Cor

ridor

Drainage/Service Trail Corridor

Gateway ParkWest

EntrySign

Cerulean Drive

Park

Gateway ParkEast

Mail Kiosk

Sunstone Way

Seven O'Clock Drive

FutureDevelopment

Future Road Extension

Seven

Dra

inag

e/ T

rail

Cor

ridor

CN Rail

FutureNeighbourhood

Commercial

Serv

ice/ T

rail C

orrid

or

Service/ Trail Corridor

Existing & FuturePemberton Recreation

Facilities

Drive

O'Clock

Seven O'Clock Drive

Sunstone Way

Serv

ice/ T

rail C

orrid

or

Mail Kiosk

Gateway ParkWest

EntrySign

Future

Community Trail

7675

7669

7671

7673

7677

7676

7674

7672

7670

30003002

7426

7628

7630

7632

7624

7622

7620

7634

7636

76387640

7642

7644

76467648

7650

7652

7654

7655

7653

7651

7649

7647

7645

7643

7641

7639

7637

7635

7633

7631

0 50 100 m

Crosland Doak Design.com

PNEPRIZEHOME

Phase 1B

Phase 1A

Park

ParkKeith McIvor

604.935.2650 [email protected]

This

is n

ot a

n of

ferin

g fo

r sal

e. A

ny s

uch

offe

ring

can

only

be

mad

e w

ith a

Dis

clos

ure

Sta

tem

ent.

The

enc

lose

d in

form

atio

n w

hile

dee

med

to b

e co

rrec

t, is

not

gua

rant

eed.

This

doc

umen

t is

prel

imin

ary

and

subj

ect t

o ap

prov

als

and

final

lega

l pla

ns to

be

prov

ided

by

a B

C L

and

Surv

eyor

. D

imen

sion

s sh

own

are

gene

ral a

nd fo

r con

veni

ence

onl

y. S

etba

cks

show

n m

ay e

xcee

d zo

ne m

inim

ums.

Top

ogra

phic

con

tour

s sh

own

are

exis

ting

cond

ition

s an

d do

not

refle

ct fu

ture

gra

des

(Con

tour

inte

rval

= 5

m).

Driv

eway

acc

ess

mus

t be

from

the

corre

spon

ding

lot n

umbe

r and

ass

ocia

ted

lette

red

road

, no

sing

le fa

mily

driv

eway

acc

ess

is p

erm

itted

from

Roa

d-A.

Veg

etat

ion

mas

sing

s sh

own

are

conc

eptu

al a

nd m

ay re

pres

ent e

xist

ing

and

or fu

ture

pla

nt m

assi

ngs.

The developer reserves the right to make changes and modifications to the project design, specifications and features without notice. E &O.E.This advertisement/ document does not constitute offers of sale capable of acceptance without a Disclosure Statement.

3121 Alta Vista Road Whistler, BC V0N 1B3604. 966-8309

[email protected]

CROSLAND DOAK DESIGNLandscape

Architecture +Building Design

A Project by Sunstone Ridge Developments Ltd.

ILLU

STR

ATIV

E S

ITE

PLA

NP

hase

-1B

1:60

0 (o

rigin

al)

2020

.06.

05