TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB...

9
TGC electronics meeting a t CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT JRC PPE SSW-rx VME protoc ol Chikara Fukunaga TGC electronics meeting on 21-June-2002 at CERN

description

TGC electronics meeting at CERN June/ SLB (Slave Board) ASIC  Version 1 (the first one after the premières ones used for the 2001 Slice test (= version 0)) has been submitted and tested preliminary.  0.35um 10x10mm 2 VLDAC (Rohm) 2/2002→Mid.6/2002  New features  Standard JTAG, JTAG racing problem fixed (cDR < TCK problem)  New connection ordering with Hi-pT ASIC (Adapted to HpT ordering)  Clock distribution optimized (partially manual place and routing)  Clock bi-phase (master & slave) logic applied to PSC and JTAG  32bit ID code  Test results (since only 1 week from delivery)  We have quickly checked the parts in which we had problems in 0-th version.  It would seem that almost all problems (in JTAG and readout) are solved with the above prescriptions.

Transcript of TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB...

Page 1: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

1

Status of ASIC development for TGC electronics

PP SLBHi-pT

JRC PPE SSW-rxVME protocol

Chikara Fukunaga TGC electronics meeting on 21-June-2002 at CERN

Page 2: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

2

PP (Patch Panel) ASIC 16 chan. 0.35um VDEC 8/2001→3/2002 32 chan. 0.35um VLDAC (Rohm) 11/2001→4/2002

32 chan. version has been tested and found no analog circuits (lvds, PLL, Test pulse) worked. Upset & Struggle, and we found …. Miss-connection of I/O pads. The Analog I/Os have been connected to the digital I/O pads accidentally. Each digital I/O pad has a digital CMOS buffer. Analog signals are blocked with t

he threshold of this buffer.

We have corrected already the pad miss-connection, re-submitted on 10-June, and expect to have new one in September (both 16- and 32- chan.) We have used passport library for analog pads.

DLL →PLL

Page 3: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

3

SLB (Slave Board) ASIC Version 1 (the first one after the premières ones used for the 2001 Slice test

(= version 0)) has been submitted and tested preliminary. 0.35um 10x10mm2 VLDAC (Rohm) 2/2002→Mid.6/2002

New features Standard JTAG, JTAG racing problem fixed (cDR < TCK problem) New connection ordering with Hi-pT ASIC (Adapted to HpT ordering) Clock distribution optimized (partially manual place and routing) Clock bi-phase (master & slave) logic applied to PSC and JTAG 32bit ID code

Test results (since only 1 week from delivery) We have quickly checked the parts in which we had problems in 0-th version. It would seem that almost all problems (in JTAG and readout) are solved with the

above prescriptions.

Page 4: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

4

Hi-pT ASIC Version 2 (to be final and fixed for the production )

0.35 um Hitachi Gate Array 12/2001→2/2002 New features (Already reported in the last meeting in 2/2002)

3-bit voting registers for delay control installed (JTAG accessible) 32-bit ID code Add New ID for No hit

Test results A few thousands of I/O patterns (generated by the simulation) are checked for bot

h wire and strip, and no problem found Minor problem → Existence of value with >3 bits

• Lowest 5 bits of output data consist of 1 bit for sign ± ,1 bit not used, and 3 bits for

• Non-used bit is not sent and simply suppressed to reduce the number of fibers. =-9 is expressed with the 5 bits as 01001, but data are sent as 0_001 (MSB 0 means negative, and _ means no connection)

• Consequently at the receiver side, =-9 and =-1 are not distinguishable. We plan to install an exterior circuit to deal 3 bits as “No hit”.

We’d like to open PRR for Hi-pT in September 2002, either before or after LECC 2002 at Colmar.

Page 5: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

5

JRC (JTAG Route Controller) on PS-board To ASIC from CPLD version used in Slice test 2001 2/2001→1/2002, and JTAG minor problem fixed, 2/2002→5/2002 Now checking

PPE (Primary Protocol Encoder for addressed JTAG access) on HSC Transferred from CPLD to ASIC for radiation tolerance Now checking

SSW-rx (Star Switch Receiver) Transferred from CPLD to ASIC for radiation tolerance 2/2002→5/2002 We will re-design the ASIC in the next fabrication

VME protocol Transferred from CPLD to ASIC for radiation tolerance A24D16, VME slave access, no interrupt, no block mode transfer support Used for both SSW and HpT VME modules Under designing

Page 6: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

6

Page 7: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

7

Page 8: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

8

Page 9: TGC electronics meeting at CERN June/2002 1 Status of ASIC development for TGC electronics PP SLB Hi-pT…

TGC electronics meeting at CERN June/2002

9