Tg_29 Jan 2016_silver Star Tiling Check List

download Tg_29 Jan 2016_silver Star Tiling Check List

of 1

Transcript of Tg_29 Jan 2016_silver Star Tiling Check List

  • 7/25/2019 Tg_29 Jan 2016_silver Star Tiling Check List

    1/1

    Date:

    Sl. No Description Next ActionStatus

    Good / Repeat the work

    A

    A.1 Hammer Yes No

    A.2 Grinding machine Yes No

    A.3 Mixing machine Yes No

    A.4 Suitable mixing paddle Yes No

    A.5 Mixing vessel Yes No

    A.6 Rubber hammer Yes No

    A.7 Steel notch trowel Yes No

    A.8 Junction box with cable Yes No

    A.9 Spacers Yes No

    A.10 Sponge / cloth Yes No

    B

    B.1 Site is free from materials, debris, water, scaffolding Yes No

    B.2 Working area is free from other agency works Yes No

    B.3 All cementitious substrate is cured and allowed to dry Yes No

    C Surface preparation

    C.1 Laitance removed Yes No

    C.2 Grinding the sharp edges Yes No

    C.2 Initial cleaning the surface Yes No

    C.3 Surface level Yes No

    C.4 Crack and construction joint treatment Yes No

    C.5 Pot holes treatment Yes No

    C.6 Final cleaning of the surface Yes No

    D

    D.1 Product as per specification Yes No

    D.2 Product as batch No and manufacturing date

    D.3 Product Shelf life Expired Not expired

    D.4 Water powder ratio 1:4 by weight Yes No

    D.5 Mixed till homogeneous mix is obtained Yes No

    D.6 Checking consistency of mixed adhesive Yes No

    D.7 Spreading adhesive at 3 to 6mm Yes No

    D.8 Checking open time before fixing tiles Yes No

    D.9 If open time exceeds remove the adhesive Yes No

    D.10 Fixing tiles over fresh adhesive firmly Yes No

    D.11 Adjust the tiles slightly twisting action within the adjustability time Yes No

    D.12 Leave minimum 2 to 3mm joints between tiles using spacers Yes No

    D.13 Verifying tile is 100% bonded at regular intervals

    D.14 Cleaning the excess adhesive from tile surfaces and joints Yes No

    D.15 Allow air dry for 24 hrs Yes No

    D.16 Checking the bonding of tiles Yes No

    D.17 Rectification, removing and reinstalling the tiles Yes No

    D.18 Hand over the tiled area for grouting Yes No

    Mention the details:-

    QC engineer - ARDEX Site in charge - Client Client

    Location: Area of application:

    CHECK LIST FOR TILE INSTALLATION USING SILVER STAR ADHESIVE

    Site clearance

    Project Name:

    Tools required for tile adhesive application

    Inspection status

    Tile adhesive application

    P