Texas Eastern Transmission, LP

Critical NoticesPostings from 02/01/2020 to 02/29/2020

Page 1 of 89

Page 2: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/02/2020 09:00:00 AMNotice End Date/Time: 02/03/2020 09:00:00 AMNotice ID: 93202Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/01/2020 03:18:27 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/2/2020

Notice Text: For Gas Day February 2, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 2 of 89

Page 3: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted interruptible, secondary out of path and a portion of secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 3 of 89

Page 4: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/03/2020 09:00:00 AMNotice End Date/Time: 02/04/2020 09:00:00 AMNotice ID: 93212Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/02/2020 03:01:48 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/3/2020

Notice Text:

For Gas Day February 3, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the

Page 4 of 89

Page 5: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 5 of 89

Page 6: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/04/2020 09:00:00 AMNotice End Date/Time: 02/05/2020 09:00:00 AMNotice ID: 93235Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/03/2020 03:02:32 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/4/2020

Notice Text: For Gas Day February 4, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 6 of 89

Page 7: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted interruptible, secondary out of path and a portion of secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 7 of 89

Page 8: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/05/2020 09:00:00 AMNotice End Date/Time: 02/06/2020 09:00:00 AMNotice ID: 93269Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/04/2020 03:06:10 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 02/05/2020

Notice Text:

For Gas Day February 5, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the

Page 8 of 89

Page 9: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 9 of 89

Page 10: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/06/2020 09:00:00 AMNotice End Date/Time: 02/07/2020 09:00:00 AMNotice ID: 93294Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/05/2020 03:05:54 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/6/2020

Notice Text: For Gas Day February 6, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 10 of 89

Page 11: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted interruptible, secondary out of path, and secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 11 of 89

Page 12: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/07/2020 09:00:00 AMNotice End Date/Time: 02/08/2020 09:00:00 AMNotice ID: 93345Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/06/2020 03:40:21 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/7/2020

Notice Text: For Gas Day February 7, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 12 of 89

Page 13: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted interruptible, secondary out of path, and secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 13 of 89

Page 14: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/08/2020 09:00:00 AMNotice End Date/Time: 02/09/2020 09:00:00 AMNotice ID: 93360Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/07/2020 02:59:53 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/8/2020

Notice Text:

For Gas Day February 8, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has scheduled and sealed nominations flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

Page 14 of 89

Page 15: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual Page 15 of 89

Page 16: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 16 of 89

Page 17: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/09/2020 09:00:00 AMNotice End Date/Time: 02/10/2020 09:00:00 AMNotice ID: 93386Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/08/2020 02:57:02 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/9/2020

Notice Text: For Gas Day February 9, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has scheduled and sealed nominations flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery Page 17 of 89

Page 18: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless

Page 18 of 89

Page 19: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 19 of 89

Page 20: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/10/2020 09:00:00 AMNotice End Date/Time: 02/11/2020 09:00:00 AMNotice ID: 93425Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/09/2020 03:34:58 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/10/2020

Notice Text:

For Gas Day February 10, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the

Page 20 of 89

Page 21: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted a portion of interruptible nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.Page 21 of 89

Page 22: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/11/2020 09:00:00 AMNotice End Date/Time: 02/12/2020 09:00:00 AMNotice ID: 93448Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/10/2020 03:05:17 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/11/2020

Notice Text: For Gas Day February 11, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 22 of 89

Page 23: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible, secondary out of path, secondary in path, and primary firm nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 23 of 89

Page 24: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/11/2020 08:37:12 AMNotice End Date/Time: 05/11/2020 08:37:12 AMNotice ID: 93477Notice Stat Desc: InitiateNotice Type: Operational Flow OrderPost Date/Time: 02/11/2020 08:37:12 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: M3 Operational Flow Order

Notice Text: In order to maintain the operational integrity of the system, TE is issuing an Operational Flow Order (OFO) pursuant to Section 4.3 of the General Terms and Conditions of TE's FERC Gas Tariff effective 9:00AM CCT February 13, 2020 to all parties, with the exception of those governed by a FERC gas tariff, in Texas Eastern's Market Area Zone M3.

This OFO does not affect the ability of TE to receive or deliver quantities of gas for scheduled nominations to any customer or pipeline.

During the effectiveness of this OFO, all parties must be balanced such that actual deliveries of gas out of the system must be equal to or less than scheduled deliveries out of the system. The penalty shall apply to each dekatherm of actual delivery quantities that exceeds the greater of 2,000 Dth or 102% of scheduled delivery quantities.

The penalty will be equal to three times the daily Platts Gas Daily "Daily Price Survey" posting for the High Common price for the geographical region, as defined in Section 8.5(a) of the General Terms and Conditions of TE's FERC Gas Tariff for the day on which such violation occurred. In addition, TE will not permit retroactive nominations to avoid an OFO penalty.

TE may be required to issue an hourly OFO pursuant to General Terms and Conditions Section 4.3(H) to impose further restrictions in order to maintain the operational integrity of the system.

This OFO will remain in effect until further notice.

Please contact your Operations Account Representative should you have any questions.

Page 24 of 89

Page 25: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/12/2020 09:00:00 AMNotice End Date/Time: 02/13/2020 09:00:00 AMNotice ID: 93484Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/11/2020 02:49:05 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/12/2020

Notice Text: For Gas Day February 12, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 25 of 89

Page 26: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" and M-3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Page 26 of 89

Page 27: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

Please contact your Operations Account Representative should you have any questions.

Page 27 of 89

Page 28: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/12/2020 07:13:37 AMNotice End Date/Time: 05/12/2020 07:13:37 AMNotice ID: 93504Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/12/2020 07:13:37 AMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Lilly Compressor Station Unplanned Outage

Notice Text: Texas Eastern (TE) has experienced an unplanned outage at its Lilly, Pennsylvania compressor station (Lilly) and efforts to restore this compressor station to full capacity are underway. This outage results in a capacity of approximately 2,895,000 Dth through the Lilly Compressor Station.

TE will take into consideration the reduced capacity during the timely cycles for future gas days. At this time, TE does not anticipate restrictions however, if flow patterns change, restrictions may be required for interruptible and secondary nominations flowing through Lilly.

TE will post updates to the status of the repairs as soon as it is known.

Please contact your Operations Account Representative if you have any questions.

Page 28 of 89

Page 29: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/13/2020 09:00:00 AMNotice End Date/Time: 02/14/2020 09:00:00 AMNotice ID: 93530Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/12/2020 03:17:16 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/13/2020

Notice Text:

For Gas Day February 13, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 29 of 89

Page 30: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible, secondary out of path and secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M3 Operational Flow Order effective February 13, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30" and M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system

Page 30 of 89

Page 31: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 31 of 89

Page 32: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/14/2020 09:00:00 AMNotice End Date/Time: 02/15/2020 09:00:00 AMNotice ID: 93564Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/13/2020 04:11:23 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/14/2020

Notice Text: For Gas Day February 14, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has restricted interruptible, TABS and secondary out of path nominations that exceed entitlements sourced on the Leidy Line for delivery off the Leidy Line. No increases in receipt nominations will be accepted on the Leidy Line.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

Page 32 of 89

Page 33: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M3 Operational Flow Order effective February 13, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30" and M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative

Page 33 of 89

Page 34: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 34 of 89

Page 35: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/14/2020 08:09:32 AMNotice End Date/Time: 03/01/2020 09:00:00 AMNotice ID: 93568Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 02/14/2020 08:09:32 AMPrior Notice: 93504Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Lilly Compressor Station Unplanned Outage -- COMPLETE

Notice Text:

Texas Eastern has completed the previously posted outage at its Lilly Compressor Station and the compressor station has returned to full capacity.

Please contact your Operations Account Representative if you have any questions.

Page 35 of 89

Page 36: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/15/2020 09:00:00 AMNotice End Date/Time: 02/16/2020 09:00:00 AMNotice ID: 93594Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/14/2020 03:21:16 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/15/2020

Notice Text:

For Gas Day February 15, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has restricted interruptible, TABS and secondary out of path nominations that exceed entitlements sourced on the Leidy Line for delivery off the Leidy Line. No increases in receipt nominations will be accepted on the Leidy Line.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

Page 36 of 89

Page 37: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible, secondary out of path and a portion of secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M3 Operational Flow Order effective February 13, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30" and M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless

Page 37 of 89

Page 38: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 38 of 89

Page 39: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/16/2020 09:00:00 AMNotice End Date/Time: 02/17/2020 09:00:00 AMNotice ID: 93617Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/15/2020 03:18:25 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/16/2020

Notice Text: For Gas Day February 16, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 39 of 89

Page 40: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station. No increases in receipts sourced upstream of the West Monroe Station for delivery downstream of the West Monroe Station will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M3 Operational Flow Order effective February 13, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30" and M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 40 of 89

Page 41: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/16/2020 09:00:00 AMNotice End Date/Time: 05/15/2020 10:13:44 PMNotice ID: 93622Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/15/2020 10:13:44 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: 20" Line 2 between the West Monroe to Providence Outage -- COMPLETE

Notice Text: Texas Eastern Transmission's (TE) previously posted pipeline outage of its 20" Line 2 between the West Monroe to Providence compressor stations has been completed.

Due to TE's continued comprehensive integrity assessment of its detailed investigations, capacity through West Monroe compressor station will return as follows:

Reduced to ApproximatelyFebruary 16 -TBD30,000 Dth/d

Capacity will remain at approximately 30,000 Dht/d until all necessary Engineering Assessments and other work streams are complete for the pipeline section. TE will provide further updates as they are known.

Based on historical nominations TE anticipates restrictions for interruptible and secondary services.

Please contact your Operations Account Representative should you have any questions.

Page 41 of 89

Page 42: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/17/2020 09:00:00 AMNotice End Date/Time: 02/18/2020 09:00:00 AMNotice ID: 93626Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/16/2020 03:06:02 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/17/2020

Notice Text: For Gas Day February 17, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 42 of 89

Page 43: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M3 Operational Flow Order effective February 13, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30" and M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 43 of 89

Page 44: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/17/2020 09:05:00 AMNotice End Date/Time: 05/17/2020 09:02:44 AMNotice ID: 93652Notice Stat Desc: SupersedeNotice Type: Operational Flow OrderPost Date/Time: 02/17/2020 09:05:00 AMPrior Notice: 93477Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: M3 Operational Flow Order -- UPDATE

Notice Text: Effective immediately, Texas Eastern (TE) is lifting the Market Area Zone M3 Operational Flow Order issued on February 13, 2020.

Additionally, due to impending colder weather, in order to maintain the operational integrity of the system, TE is issuing an Operational Flow Order (OFO) pursuant to Section 4.3 of the General Terms and Conditions of TE's FERC Gas Tariff effective 9:00AM CCT February 19, 2020 to all parties, with the exception of those governed by a FERC gas tariff, in Texas Eastern's Market Area Zone M3.

This OFO does not affect the ability of TE to receive or deliver quantities of gas for scheduled nominations to any customer or pipeline.

During the effectiveness of this OFO, all parties must be balanced such that actual deliveries of gas out of the system must be equal to or less than scheduled deliveries out of the system. The penalty shall apply to each dekatherm of actual delivery quantities that exceeds the greater of 2,000 Dth or 102% of scheduled delivery quantities.

The penalty will be equal to three times the daily Platts Gas Daily "Daily Price Survey" posting for the High Common price for the geographical region, as defined in Section 8.5(a) of the General Terms and Conditions of TE's FERC Gas Tariff for the day on which such violation occurred. In addition, TE will not permit retroactive nominations to avoid an OFO penalty.

TE may be required to issue an hourly OFO pursuant to General Terms and Conditions Section 4.3(H) to impose further restrictions in order to maintain the operational integrity of the system.

This OFO will remain in effect until further notice.

Please contact your Operations Account Representative should you have any questions.

Page 44 of 89

Page 45: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/17/2020 09:05:00 AMNotice End Date/Time: 05/17/2020 09:04:14 AMNotice ID: 93653Notice Stat Desc: SupersedeNotice Type: Operational Flow OrderPost Date/Time: 02/17/2020 09:05:00 AMPrior Notice: 92956Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE M1-24 and M2-24 Operational Flow Order -- TOLERANCE CHANGE

Notice Text: In order to maintain the operational integrity of the system, TE is issuing an Operational Flow Order (OFO) pursuant to Section 4.3 of the General Terms and Conditions of TE's FERC Gas Tariff effective immediately to all delivery parties, with the exception of those governed by a FERC gas tariff, in Texas Eastern's Market Area Zones M1-24 and M2-24.

This OFO does not affect the ability of TE to receive or deliver quantities of gas for scheduled nominations to any customer or pipeline.

***During the effectiveness of this OFO, all parties must be balanced such that actual deliveries of gas out of the system must be equal to or less than scheduled deliveries out of the system. The penalty shall apply to each dekatherm of actual delivery quantities that exceeds the greater of 6,000 Dth or 106% of scheduled delivery quantities.

The penalty will be equal to three times the daily Platts Gas Daily "Daily Price Survey" posting for the High Common price for the geographical region, as defined in Section 8.5(a) of the General Terms and Conditions of TE's FERC Gas Tariff for the day on which such violation occurred. In addition, TE will not permit retroactive nominations to avoid an OFO penalty.

TE may be required to issue an hourly OFO pursuant to General Terms and Conditions Section 4.3(H) to impose further restrictions in order to maintain the operational integrity of the system.

Correspondingly, the OFO issued on January 24, 2020 is no longer in effect.

TE will inform customers via EBB when this OFO will be lifted.

Please contact your Operations Account Representative should you have any questions.

Page 45 of 89

Page 46: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/18/2020 09:00:00 AMNotice End Date/Time: 02/19/2020 09:00:00 AMNotice ID: 93675Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/17/2020 03:15:03 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/18/2020

Notice Text: For Gas Day February 18, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 46 of 89

Page 47: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30", and M3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 47 of 89

Page 48: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/17/2020 03:55:58 PMNotice End Date/Time: 05/17/2020 03:55:58 PMNotice ID: 93679Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 02/17/2020 03:55:58 PMPrior Notice: 90183Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: 30" Unplanned Lincoln County, KY Outage - UPDATE 12

Notice Text: As previously posted, Texas Eastern (TE) has experienced an unplanned outage between Danville and Tompkinsville compressor stations and repair efforts to restore capacity are progressing.

TE continues to work diligently on its work plans in compliance with the requirements identified in the corrective action order (CAO) issued by PHMSA on August 8, 2019 to allow Line 15 to return to full service.

Current work includes reviewing inspection data, evaluating construction records, performing field investigations, scheduling additional exterior inspections and in-line inspection tool runs and appropriately remediating any necessary anomalies. However, due to the availability of specific ILI tools needed to inspect Line 15 and the timing associated on receiving tool run results, TE expects that work to return Line 15 to full service will continue into the third quarter of 2020.

There are various factors that could potentially change the projected full return to service date for Line 15, such as but not limited to: weather conditions, regulatory approvals and any unforeseen existing pipeline conditions that could lengthen the work schedule.

TE is working to expedite its work where possible, however Line 15 will only be returned to full service after all physical work has been completed; the line has undergone a rigorous inspection process to determine it is safe to do so, and TE has received all required regulatory approvals.

Capacity through Danville is currently at 1,480,000 Dth/d until additional segments of Line 15 are returned to service. If additional segments are returned to service incrementally and further revisions to available capacity though Danville are determined to be necessary, that information would be posted to the EBB as soon as it is known by TE.

TE will provide updates regarding Line 15 return to service as additional information is known.

Page 48 of 89

Page 49: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/19/2020 09:00:00 AMNotice End Date/Time: 02/20/2020 09:00:00 AMNotice ID: 93709Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/18/2020 03:32:09 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/19/2020

Notice Text:

For Gas Day February 19, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has restricted interruptible, TABS and secondary out of path nominations that exceed entitlements sourced on the Leidy Line for delivery off the Leidy Line. No increases in receipt nominations will be accepted on the Leidy Line.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24",

Page 49 of 89

Page 50: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.The M3 Operational Flow Order effective February 19, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30" and M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt

Page 50 of 89

Page 51: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 51 of 89

Page 52: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/20/2020 09:00:00 AMNotice End Date/Time: 02/21/2020 09:00:00 AMNotice ID: 93737Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/19/2020 03:39:45 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/20/2020

Notice Text: For Gas Day February 20, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has restricted interruptible, TABS and secondary out of path nominations that exceed entitlements sourced on the Leidy Line for delivery off the Leidy Line. No increases in receipt nominations will be accepted on the Leidy Line.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

Page 52 of 89

Page 53: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE has restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective January 24, 2020 will remain in effect until further notice.

The M3 Operational Flow Order effective February 19, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30" and M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative

Page 53 of 89

Page 54: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 54 of 89

Page 55: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/21/2020 09:00:00 AMNotice End Date/Time: 02/22/2020 09:00:00 AMNotice ID: 93764Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/20/2020 03:23:37 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/21/2020

Notice Text: For Gas Day February 21, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has restricted interruptible, TABS and secondary out of path nominations that exceed entitlements sourced on the Leidy Line for delivery off the Leidy Line. No increases in receipt nominations will be accepted on the Leidy Line.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

Page 55 of 89

Page 56: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M2-24 Operational Flow Order effective February 17, 2020 will remain in effect until further notice.

The M1-24 Operational Flow Order effective February 17, 2020 will remain in effect until further notice.

The M3 Operational Flow Order effective February 19, 2020 will remain in effect until further notice.

Page 56 of 89

Page 57: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE requires all shippers and point operators in Market Area Zones M1-30" and M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 57 of 89

Page 58: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/21/2020 08:49:42 AMNotice End Date/Time: 05/21/2020 08:49:42 AMNotice ID: 93768Notice Stat Desc: SupersedeNotice Type: Operational Flow OrderPost Date/Time: 02/21/2020 08:49:42 AMPrior Notice: 93652Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: M3 Operational Flow Order -- LIFTED February 22, 2020

Notice Text: Effective 9:00AM CCT February 22, 2020, Texas Eastern (TE) is lifting the Market Area Zone M3 Operational Flow Order issued on February 19, 2020.

Please contact your Operations Account Representative should you have any questions.

Page 58 of 89

Page 59: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/21/2020 08:52:19 AMNotice End Date/Time: 05/21/2020 08:52:19 AMNotice ID: 93769Notice Stat Desc: SupersedeNotice Type: Operational Flow OrderPost Date/Time: 02/21/2020 08:52:19 AMPrior Notice: 93653Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE M1-24 and M2-24 Operational Flow Order -- LIFTED February 22, 2020

Notice Text: Effective 9:00AM CCT February 22, 2020, Texas Eastern (TE) is lifting the Market Area Zones M1-24 and M2-24 issued on February 17, 2020.

Please contact your Operations Account Representative should you have any questions.

Page 59 of 89

Page 60: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/22/2020 09:00:00 AMNotice End Date/Time: 02/23/2020 09:00:00 AMNotice ID: 93779Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/21/2020 02:36:30 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/22/2020

Notice Text: For Gas Day February 22, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity Page 60 of 89

Page 61: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible, secondary out of path and secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.TE requires all shippers and point operators in Market Area Zones M1-30", M2-30", and M3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise

Page 61 of 89

Page 62: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 62 of 89

Page 63: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/23/2020 09:00:00 AMNotice End Date/Time: 02/24/2020 09:00:00 AMNotice ID: 93804Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/22/2020 02:46:33 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/23/2020

Notice Text: For Gas Day February 23, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 63 of 89

Page 64: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible, secondary out of path and secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.TE requires all shippers and point operators in Market Area Zones M1-30", M2-30", and M3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system

Page 64 of 89

Page 65: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 65 of 89

Page 66: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/22/2020 02:52:55 PMNotice End Date/Time: 03/01/2020 09:00:00 AMNotice ID: 93807Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 02/22/2020 02:52:55 PMPrior Notice: 91628Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: West Monroe to Providence 20" Line 26 Detail Investigations -- COMPLETE

Notice Text: Texas Eastern Transmission's (TE) previously posted comprehensive integrity assessment of its detailed investigations on its 20" Line 26 between the West Monroe to Providence compressor stations have been completed.

However, due to TE's continued comprehensive integrity assessment of its pipeline system, TE will be conducting further investigations on 20" Line 26 between Yazoo City to Kosciusko station. As a result, the capacity through the West Monroe compressor station will be approximately 79,000 Dth/d until complete ILI results are received, fully analyzed and any anomalies are appropriately remediated.

Based on historical nominations, TE anticipate restrictions for interruptible and secondary services.

TE will post updates to the status of these investigations as soon as it is known.

Please contact your Operations Account Representative should you have any questions.

Page 66 of 89

Page 67: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/24/2020 09:00:00 AMNotice End Date/Time: 02/25/2020 09:00:00 AMNotice ID: 93830Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/23/2020 02:35:38 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/24/2020

Notice Text: For Gas Day February 24, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 67 of 89

Page 68: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible, secondary out of path and secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.TE requires all shippers and point operators in Market Area Zones M1-30", M2-30", and M3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system

Page 68 of 89

Page 69: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 69 of 89

Page 70: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/25/2020 09:00:00 AMNotice End Date/Time: 02/26/2020 09:00:00 AMNotice ID: 93858Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/24/2020 02:42:44 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/25/2020

Notice Text: For Gas Day February 25, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 70 of 89

Page 71: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible, secondary out of path and secondary in path nominations not to a primary delivery point nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.TE requires all shippers and point operators in Market Area Zones M1-30", M2-30", and M3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system

Page 71 of 89

Page 72: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 72 of 89

Page 73: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/25/2020 09:05:00 AMNotice End Date/Time: 05/25/2020 09:00:00 AMNotice ID: 93878Notice Stat Desc: SupersedeNotice Type: Capacity ConstraintPost Date/Time: 02/25/2020 09:05:00 AMPrior Notice: 93041Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: Five Points to Somerset 20" Line 2 Detail Investigations -- COMPLETE

Notice Text: Texas Eastern has completed the previously posted detailed investigations occurring on its 20" Line 2 between the Five Points to Somerset compressor stations.

Effective immediately, all restrictions associated with these detailed investigations have been lifted.

Please contact your Operations Account Representative if you have any questions.

Page 73 of 89

Page 74: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/27/2020 09:00:00 AMNotice End Date/Time: 05/25/2020 02:39:56 PMNotice ID: 93895Notice Stat Desc: InitiateNotice Type: Operational Flow OrderPost Date/Time: 02/25/2020 02:39:56 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: M3 Operational Flow Order

Notice Text: Due to impending colder weather, in order to maintain the operational integrity of the system, TE is issuing an Operational Flow Order (OFO) pursuant to Section 4.3 of the General Terms and Conditions of TE's FERC Gas Tariff effective 9:00AM CCT February 27, 2020 to all parties, with the exception of those governed by a FERC gas tariff, in Texas Eastern's Market Area Zone M3.

This OFO does not affect the ability of TE to receive or deliver quantities of gas for scheduled nominations to any customer or pipeline.

During the effectiveness of this OFO, all parties must be balanced such that actual deliveries of gas out of the system must be equal to or less than scheduled deliveries out of the system. The penalty shall apply to each dekatherm of actual delivery quantities that exceeds the greater of 2,000 Dth or 102% of scheduled delivery quantities.

The penalty will be equal to three times the daily Platts Gas Daily "Daily Price Survey" posting for the High Common price for the geographical region, as defined in Section 8.5(a) of the General Terms and Conditions of TE's FERC Gas Tariff for the day on which such violation occurred. In addition, TE will not permit retroactive nominations to avoid an OFO penalty.

TE may be required to issue an hourly OFO pursuant to General Terms and Conditions Section 4.3(H) to impose further restrictions in order to maintain the operational integrity of the system.

This OFO will remain in effect until further notice.

Please contact your Operations Account Representative should you have any questions.

Page 74 of 89

Page 75: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/26/2020 09:00:00 AMNotice End Date/Time: 02/27/2020 09:00:00 AMNotice ID: 93897Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/25/2020 03:03:20 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/26/2020

Notice Text: For Gas Day February 26, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

Page 75 of 89

Page 76: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has scheduled and sealed nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Additionally, TE has scheduled and sealed receipt nomination sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system). No increases in receipt nominations sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30", and M3 to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt

Page 76 of 89

Page 77: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 77 of 89

Page 78: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/27/2020 09:00:00 AMNotice End Date/Time: 02/28/2020 09:00:00 AMNotice ID: 93950Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/26/2020 03:42:43 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/27/2020

Notice Text: For Gas Day February 27, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted a portion of interruptible nominations flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has restricted interruptible, TABS and secondary out of path nominations that exceed entitlements sourced on the Leidy Line for delivery off the Leidy Line. No increases in receipt nominations will be accepted on the Leidy Line.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

Page 78 of 89

Page 79: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted interruptible and a portion of secondary out of path delivery nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery south of Sarahsville to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Sarahsville on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M3 Operational Flow Order effective February 27, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your

Page 79 of 89

Page 80: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 80 of 89

Page 81: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/28/2020 09:00:00 AMNotice End Date/Time: 02/29/2020 09:00:00 AMNotice ID: 93966Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/27/2020 02:55:55 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/28/2020

Notice Text: For Gas Day February 28, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible nominations flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced on the Leidy Line for delivery off the Leidy Line. No increases in receipt nominations will be accepted on the Leidy Line.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to Page 81 of 89

Page 82: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path, and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M3 Operational Flow Order effective February 27, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt

Page 82 of 89

Page 83: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 83 of 89

Page 84: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 02/29/2020 09:00:00 AMNotice End Date/Time: 03/01/2020 09:00:00 AMNotice ID: 94011Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/28/2020 03:15:45 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 2/29/2020

Notice Text:

For Gas Day February 29, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements flowing through the Perulack/Chambersburg Compressor Stations. TE will not allow any increases in receipts sourced from points west Perulack/Chambersburg for delivery to points east of Perulack/Chambersburg except for Firm No-Notice services.

TE has restricted interruptible, TABS and secondary out of path nominations that exceed entitlements sourced on the Leidy Line for delivery off the Leidy Line. No increases in receipt nominations will be accepted on the Leidy Line.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24",

Page 84 of 89

Page 85: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path, and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

TE restricted a portion of interruptible nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has scheduled and sealed nominations sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M3 Operational Flow Order effective February 27, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless

Page 85 of 89

Page 86: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 86 of 89

Page 87: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Critical noticeNotice Eff Date/Time: 03/01/2020 09:00:00 AMNotice End Date/Time: 03/02/2020 09:00:00 AMNotice ID: 94036Notice Stat Desc: InitiateNotice Type: Capacity ConstraintPost Date/Time: 02/29/2020 03:56:15 PMPrior Notice: Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE Pipeline Conditions for 3/1/2020

Notice Text:

For Gas Day March 1, 2020, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A for delivery downstream of Chester Junction Line 1A will be accepted except for Firm No-Notice services.

TE has scheduled and sealed nominations sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 on the Philadelphia Lateral. No increases in deliveries sourced upstream of Chester Junction Line 1A-1 for delivery downstream of Chester Junction Line 1A-1 will be accepted except for Firm No-Notice services.

Due to the ongoing Force Majeure, until further notice, TE has restricted interruptible, secondary out of path, secondary in path and a portion of primary firm nominations sourced either in the M1-24", M2-24", M2-30" north of Danville Compressor Station (Danville) or in M3 for delivery south of Danville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Danville or in M3 for delivery south of Danville will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Berne Compressor Station (Berne) or in M3 for delivery south of Berne. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Berne or in M3 for delivery south of Berne will be accepted.

TE has restricted interruptible and secondary out of path nominations that exceed entitlements sourced either on the M1-24", M2-24", M2-30" north of Tompkinsville Compressor Station (Tompkinsville) or in M3 for delivery south of Tompkinsville. No increases for receipt nominations sourced either in the M1-24", M2-24", M2-30" north of Tompkinsville or in M3 for delivery south of Tompkinsville will be accepted.

TE has restricted and sealed nominations on TE's lease capacity with Algonquin Gas Transmission (AGT) to TE's Maximum Daily Quantity (MDQ).

TE has restricted interruptible, secondary out of path, and a portion of secondary within path delivery nominations to meter 75919 (TRANSCO - BELLE MEADE, NJ). No increases in delivery nominations to meter 75919 will be accepted.

Page 87 of 89

Page 88: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

TE restricted interruptible and a portion of secondary out of path nominations on the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed delivery nominations on the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, sourced upstream of the Marietta Mainline Extension for delivery on the Marietta Mainline Extension. No increases in deliveries sourced upstream of the Marietta Mainline Extension, excluding capacity for rate schedules FT-1MX and IT-1MX, for delivery downstream of the Marietta Mainline Extension will be accepted.

TE has scheduled and sealed nominations sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery south of Lebanon to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock. No increases in receipts sourced in STX, WLA, ELA, M1- 30", M2-30", M3 and receipt points north of Lebanon on the M2-24 for delivery to the M1-24", M2-24" or delivery locations in ETX between LGV and N. Little Rock will be accepted.

TE has restricted a portion of interruptible nominations sourced south of Thomaston Compressor Station (Wilcox Line) for delivery north of Thomaston. No increases in deliveries sourced south of Thomaston for delivery north of Thomaston on will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced in ETX for delivery in STX, WLA, or ELA. No increases in receipt nominations sourced in ETX for delivery in STX, WLA or ELA will be accepted.

TE has restricted interruptible and a portion of secondary out of path nominations that exceed entitlements sourced either in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

TE has Force Balanced a portion of short TABS pools in Access Area zones ETX, STX, ELA and WLA and Market Area zones M1-24, M2-24 and M1- 30 will continue to throughout subsequent nomination cycles.

TE has Force Balanced a portion of long TABS pools in Access Area zones ETX, STX and Market Area zones M1-24, M2-24, M2-30 and M3 and will continue to throughout subsequent nomination cycles.

The M3 Operational Flow Order effective February 27, 2020 will remain in effect until further notice.

TE requires all shippers and point operators in Market Area Zones M1-30", M2-30" to carefully review demand for gas and schedule gas consistent with daily needs and to tender and receive gas consistent with confirmed nominations regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Additionally, TE requires all delivery point operators in Access Area Zones WLA and ELA and Market Area Zones M1-24" and M2 -24" to keep actual daily takes out of the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones WLA and ELA are required to keep actual daily receipts into the system equal to or greater than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Furthermore, TE requires all delivery point operators in Access Area Zones STX and ETX to keep actual daily takes out of the system equal to or greater than scheduled quantities regardless of their cumulative

Page 88 of 89

Page 89: Texas Eastern Transmission, LP...Texas Eastern Transmission, LP Critical Notices Postings from 02/01/2020 to 02/29/2020 Page 1 of 89 TSP: 007932908 TSP Name: Texas Eastern Transmission,

imbalance position unless otherwise coordinated with your operations account representative. All receipt point operators in Access Area Zones STX and ETX are required to keep actual daily receipts into the system equal to or less than scheduled quantities regardless of their cumulative imbalance position unless otherwise coordinated with your operations account representative.

Please contact your Operations Account Representative should you have any questions.

Page 89 of 89