Tev Model ~Sez130911

download Tev Model ~Sez130911

of 91

Transcript of Tev Model ~Sez130911

  • 7/31/2019 Tev Model ~Sez130911

    1/91

    In Acres 25In SQM 101,171 1 acre =4046.825 S M 4046.825

    In Sft 1,089,051 1 acre =43560 Sft 43560

    FAR Area (Sft) (Processin Area) 3

    FAR Area (Sft) (Non Processin Area) 2Area (Processing Area) (%) 75%

    Area (Non Processin Area) (%) 25%

    Total Built U Area (Processin Area) 2,450,365 490050

    Total Built U Area (Non Processin Area) 544,526

    Total Basement Area 1,800,000 Processin

    Total Built U Area 2,994,890 2.75 Non Processin

    2433.75 2677.125383

    Parameters Description IT Park Commercial Office Convention Centre

    Classification

    (Processing / Non Processing)

    Classify each component into Processing or Non

    Processing AreaProcessing Processing Processing

    Land Area (Acre) Share of Land attributable to each com onent (%) 75% 10.00% 5.00%FAR FAR available as er a rovals 3 2 2

    Total Built-u Area (Aft) 2,450,365 217,810 108,905

    Su er Area Loadin on the FSI Area in % 20% 20% 20%

    Total Leasable Area (Sft) FSI + Loadin 2,940,438 261,372 130,686

    Basement % As a % of the total Basement Area 82.32% 6.71% 7.32%

    Basement Area In Sft 1,481,706 120,726 131,706

    Cost of Construction (On Built up)Cost of construction (INR per Sft) based on Total Built

    U Area1,950 2,050 5,467

    Basement Cost Cost of construction (INR per Sft) 800 800 800

    Cost of Construction in INR 4,778,211,263 446,510,910 595,384,182Cost of Construction (Basement) in INR Sft 1,185,364,800 96,580,800 105,364,800

    Cost of Construction (Total) in INR Sft 5,963,576,063 543,091,710 700,748,982

    Loaded Cost of Construction

    Civil Construction (%) 56.0% 56.0% 56.0%

    Plant & Machinery (%) 31.0% 31.0% 31.0%

    Operating Permits (%) (if any) 0.5% 0.5% 0.5%

    Furnitures & Fixtures (%) (if any) 5.0% 5.0% 5.0%

    Design & Consultancy (%) 5.0% 5.0% 5.0%

    Software Cost (Fixed Cost) (if an ) 0.5% 0.5% 0.5%Pre Operative Expenses

    (% Share of total cost of construction)1.0% 1.0% 1.0%

    Contingencies (% Share of total cost of construction) 1.0% 1.0% 1.0%

    Date Inputs for TEV ~ SEZ

    Area Statement

    Total Land Area

    Basement Details

    Development Plan

    Share of Cost of Construction

    (Applicable as per each component)

    Other Costs

  • 7/31/2019 Tev Model ~Sez130911

    2/91

    Phase - I

    Total Built u Area under Construction (%) 30.47%

    Total Built up Area under Construction (Sft) 1,189,133

    (The area entered by client was

    based on super area, rather

    built up area)

    1st Phase Start of Construction (Date) October, 2011

    1st Phase End of Construction (Date) September, 2013

    Start of Leasing (Date) October, 2013

    Construction Schedule (%) Q1 Q2 Q3 Q4

    Year 1 2% 5% 8% 15%

    Year 2 15% 20% 20% 15%

    Phase - 2

    Total Built up Area under Construction (%) 69.53%

    Total Built up Area under Construction (Sft) 1,261,232

    1st Phase Start of Construction (Date) October, 2013

    1st Phase End of Construction (Date) September, 2015

    Start of Leasing (Date) October, 2013

    Construction Schedule (%) Q1 Q2 Q3 Q4

    Year 1 2% 3% 10% 15%

    Year 2 15% 20% 20% 15%

    24

    IT PARKS/FACILITIES/OFFICE

    24

  • 7/31/2019 Tev Model ~Sez130911

    3/91

    Phase - I

    Total Built u Area under Construction (%)

    Total Built up Area under Construction (Sft)

    1st Phase Start of Construction (Date)

    1st Phase End of Construction (Date)

    Start of Leasing (Date)

    Construction Schedule (%) Q1 Q2 Q3 Q4

    Year 1

    Year 2

    Phase - 2

    Total Built u Area under Construction (%)

    Total Built up Area under Construction (Sft) 217,810

    1st Phase Start of Construction (Date) October, 20131st Phase End of Construction (Date) September, 2015

    Start of Leasing (Date) October, 2013

    Construction Schedule (%) Q1 Q2 Q3 Q4

    Year 1 2% 3% 10% 15%

    Year 2 15% 20% 20% 15%

    Phase - I

    Total Built u Area under Construction (%)

    Total Built up Area under Construction (Sft)

    1st Phase Start of Construction (Date)1st Phase End of Construction (Date)

    Start of Operations (Date)

    Construction Schedule (%) Q1 Q2 Q3 Q4

    Year 1

    Year 2

    Phase - 2

    Total Built u Area under Construction (%)

    Total Built up Area under Construction (Sft) 108,905

    1st Phase Start of Construction (Date) October, 2013

    1st Phase End of Construction (Date) September, 2015

    Start of Operations (Date) October, 2013

    Construction Schedule (%) Q1 Q2 Q3 Q4

    Year 1 2% 3% 10% 15%

    Year 2 15% 20% 20% 15%

    Commercial Office

    24

    Convention Centre

    Fill the total number of Months

    24

    Fill the total number of Months

  • 7/31/2019 Tev Model ~Sez130911

    4/91

    Phase - I

    Total Built u Area under Construction (%)

    Total Built up Area under Construction (Sft)

    1st Phase Start of Construction (Date)

    1st Phase End of Construction (Date)

    Start of Operations (Date)

    Construction Schedule (%) Q1 Q2 Q3 Q4

    Year 1

    Year 2

    Phase - 2

    Total Built u Area under Construction (%)

    Total Built up Area under Construction (Sft) 217,810

    1st Phase Start of Construction (Date) October, 20131st Phase End of Construction (Date) September, 2015

    Start of Operations (Date) October, 2013

    Construction Schedule (%) Q1 Q2 Q3 Q4

    Year 1 2% 3% 10% 15%

    Year 2 15% 20% 20% 15%

    24

    Service Apartments

    Fill the total number of Months

  • 7/31/2019 Tev Model ~Sez130911

    5/91

    Land Area - Phase (Acres)

    Total Land Area (Acres)

    Current Land Value (INR Mn.)Land Value Per Acre (INR Mn.)

    Total Built up Area (Sft)

    Loading on the FSI Area in %

    Total Leasable Area (Sft)

    Base Cost of Construction (INR per sq. ft of Built-Up Area)

    Basement Area (In Sft)

    Construction of Cost for Basement (INR per sq. ft of Basement Area

    Constructed)

    Loaded Cost of Construction (INR per sq. ft of Built up Area)

    Contingencies (%)

    Pre Lease Admin Expenses (as a % of construction cost)

    Pre Lease Marketing Expenses (as a % of construction cost)

    Post Lease Admin Expenses (as a % of lease/sale revenue)

    Post Lease Marketing Expenses (as a % of lease/sale revenue)

    Maintanence Charge (CAM)

    Margin on Maintanence

    Deductible ~ Repair & Maintenance

    No. of Months Rentals For Brokerage

    Lease Rents (INR per sft per month) FY011

    Car Parking Rental (INR per Bay per month)

    Revenue Escalation YoY

    Cost Escalation YoY

    Lease Escalation on Renewal

    Security Deposit (No. of months Rental)

    Other Revenues (as a %age of Lease & Parking Revenues)

    Area Per Car Park

    Processing Area ~ Car Park Area (Sft)

    Processing Area ~ No of Car Parks

    Processing Area ~ Additional Surface Car Parks

    Total Car Parks for Phase ~ 1

    Total Car Parks Free

    Car Parks Available for Revenue

    Vacancy Provision

    Revenue Assumptions

    General Assumptions

    OSE Infrastructure Limited

    Base Assumptions

    LAND DETAILS

    Base Assumptions ~ IT Office ~ Phase I

    Cost Assumptions

  • 7/31/2019 Tev Model ~Sez130911

    6/91

  • 7/31/2019 Tev Model ~Sez130911

    7/91

    25.00

    25.00

    4,767.50190.70

    1,189,133

    20%

    1,426,960

    1,950

    728,823

    800

    2,196

    5%

    1.50%

    2.00%

    1.50%

    2.00%

    12

    20.00%

    30.00%

    2

    33

    2,500

    5%

    5%

    15%

    6

    0%

    350

    728,823

    2,082

    61

    2,143

    1,427

    716

    5%

  • 7/31/2019 Tev Model ~Sez130911

    8/91

  • 7/31/2019 Tev Model ~Sez130911

    9/91

    Total Built up Area (Sft) 1,261,232

    Loading on the FSI Area in % 20%

    Total Leasable Area (Sft) 1,513,478

    Base Cost of Construction (INR per sq. ft of Built-Up Area) 1,950

    Basement Area (In Sft) 748,164

    Construction of Cost for Basement (INR per sq. ft of Basement Area

    Constructed) 800

    Loaded Construction Cost (INR per sq. ft of Built up Area) 2,182

    Contingencies (%) 5%

    Pre Lease Admin Expenses (as a % of construction cost) 1.50%

    Pre Lease Marketing Expenses (as a % of construction cost) 2.00%

    Post Lease Admin Expenses (as a % of lease/sale revenue) 1.50%

    Post Lease Marketing Expenses (as a % of lease/sale revenue) 2.00%

    Maintanence Charge (CAM) 12

    Margin on Maintanence 20.00%

    Deductible ~ Repair & Maintenance 30.00%

    No. of Months Rentals For Brokerage 2

    Lease Rents (INR per sft per month) 33

    Car Parking Rental (INR per Bay per month) 2,500

    Revenue Escalation YoY 5%

    Cost Escalation YoY 5%

    Lease Escalation on Renewal 15%

    Security Deposit (No. of months Rental) 6

    Other Revenues (as a %age of Lease & Parking Revenues) 0%

    Area Per Car Park 350

    Processing Area ~ Car Park Area (Sft) 748,164

    Processing Area ~ No of Car Parks 2,138

    Processing Area ~ Additional Surface Car Parks 61

    Total Car Parks for Phase 2 2,199

    Total Car Parks Free 1,513

    Car Parks Available for Revenue 686

    Vacancy Provision 5%

    General Assumptions

    Base Assumptions ~ IT Office ~ Phase II

    Cost Assumptions

    Revenue Assumptions

  • 7/31/2019 Tev Model ~Sez130911

    10/91

  • 7/31/2019 Tev Model ~Sez130911

    11/91

  • 7/31/2019 Tev Model ~Sez130911

    12/91

  • 7/31/2019 Tev Model ~Sez130911

    13/91

    Total Room Stock 266

    Gross Room Size (Sft) 900

    Total Gross Area (Sqm) 20,235

    Total Gross Area (Sft) 217,810

    Loaded Area 239,591

    Cost of Construction Per Room (INR Mn) 4

    Construction Cost (INR Per Sft) 4,444

    Basement Area (In Sft) 65,862

    Construction of Cost for Basement (INR per sq. ft of Basement Area 800

    Loaded Construction Cost (INR per sq. ft of Built up Area) 4,686

    Cost Escalation 5%

    Contingencies 5%

    ARR (INR/Room Night) 4,500

    ARR Escalation (Per Annum) 5.00%

    Occupancy Rate 80.00%

    Food & Beverage Sales (as % of Room Sales) 20.00%

    MOD Sales (as % of Room Sales) 5.00%

    Spa / Health Club revenues (as % of Room Sales) 5.00%

    Room costs (as % of Room Sales) 12.50%

    F & B Cost (as % of F & B Sales) 45.00%

    Other Expense (as % of F & B Sales) 1.00%

    MOD costs (as % of MOD Sales) 40.00%

    Spa / Health Costs (as a %age of sales) 40.00%

    Administrative expenses (as % of Total Revenue) 2.00%

    Maintenance (as % of Total Revenue) 2.00%

    Operating expenses (as % of Total Revenue) 10.00%

    Marketing costs (as % of Total Revenue) 2.00%

    Base Management Fee (% of total revenue) 3.00%

    F F & E (as % of Total Revenue) 2.00%

    Management Incentive Fee (as % of GOP) 7.50%

    Proposed Configuration

    Revenue Assumptions

    Operating Expenditure Schedule

    Other Overhead Expenditure

    Base Assumptions ~ Service Apartments

  • 7/31/2019 Tev Model ~Sez130911

    14/91

  • 7/31/2019 Tev Model ~Sez130911

    15/91

    Total Built up Area (Sft) 108,905

    Loading on the FSI Area in % 20%

    Total Leasable Area (Sft) 130,686

    Base Cost of Construction (INR per sq. ft of Built-Up Area) 4,500

    Basement Area (In Sft) 131,706

    Construction of Cost for Basement (INR per sq. ft of Basement Area

    Constructed) 800

    Loaded Construction Cost (INR per sq. ft of Built up Area) 5,467

    Cost Escalation 5%

    Contingencies 5%

    Base Assumptions ~ Convention Centre

    Cost Assumptions

  • 7/31/2019 Tev Model ~Sez130911

    16/91

    Total Built up Area (Sft) 1,189,133

    Loading on the FSI Area in % 20%

    Total Leasable Area (Sft) 1,426,960

    Base Cost of Construction (INR per sq. ft of Built-Up Area) 1,950

    Loaded Cost of Construction (INR per sq. ft of Built up Area) 2,196

    Lease Rents (INR per sft per month) FY011 33

    Car Parking Rental (INR per Bay per month) 2,500

    Revenue Escalation YoY 5%

    Cost Escalation YoY 5%

    Lease Escalation on Renewal 15%

    Security Deposit (No. of months Rental) 6

    No. of Months Rentals For Brokerage 2

    ParticularsCost Index

    Revenue Index (5% Growth)

    Development Costs

    Construction Phasing 100.00%

    Construction Phasing - Built up Area (sq. ft) 1,189,133

    Loaded Construction Cost (INR Millions) 2,783.73

    Pre Lease up Administration Expenditure (INR Mn.) 1.50%

    Pre Lease up Marketing Costs (INR Mn.) 2.00%

    Contingencies (%) 5.00%

    Total Development Costs (INR Mn.) 3,020.34

    RevenuesAbsorption Schedule

    Pre Committed Area

    Post Completion Absorption

    Area for Revenues (Pre-Commitments)

    Area for Revenues (Post Completion)

    Cumulative Area Leased

    No of Months Revenues (First Year)

    Lease Rents (INR per sft per month)

    Lease Rentals 33

    Weighted Average ~ Pre Commitments 36

    Weighted Average ~ Post Completion 37

    Lease Revenues (INR Mn)Pre Commitments

    Area Committed in Yr 1

    Area Committed in Yr 2

    IT/ITeS Office Space ~ Phase I

    Revenue Assumptions

    100%

    1,426,960

  • 7/31/2019 Tev Model ~Sez130911

    17/91

    Area Committed in Yr 3

    Area Committed in Yr 4

    Area Committed in Yr 5

    Area Committed in Yr 6

    Area Committed in Yr 7

    Area Committed in Yr 8

    Area Committed in Yr 9

    Area Committed in Yr 10

    Area Committed in Yr 11

    Area Committed in Yr 12

    Area Committed in Yr 13

    Area Committed in Yr 14

    Post Completion

    Area Committed in Yr 1

    Area Committed in Yr 2

    Area Committed in Yr 3

    Area Committed in Yr 4

    Area Committed in Yr 5

    Area Committed in Yr 6

    Area Committed in Yr 7Area Committed in Yr 8

    Area Committed in Yr 9

    Area Committed in Yr 10

    Area Committed in Yr 11

    Area Committed in Yr 12

    Area Committed in Yr 13

    Area Committed in Yr 14

    Total

    Parking Revenue (INR Mns)

    Margin on Maintenance (INR Mns)Security Deposit (INR Mns)

    Brokerage on Lease (INR Mns)

    Other Revenues

    Vacancy Provision

    Post Lease up Administration Expenditure

    Post Lease up Marketing Expenses

    Net Cash Flows (INR Mn)

    Revenue

    Expenditure

    GOPRevenue For P & L

    Expenditure for P&L

    EBITDA (INR Mn.)

  • 7/31/2019 Tev Model ~Sez130911

    18/91

  • 7/31/2019 Tev Model ~Sez130911

    19/91

  • 7/31/2019 Tev Model ~Sez130911

    20/91

    76.41 305.65 305.65

    0.00 0.00

    0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    23.12 92.47 92.47

    227.74 227.74

    0.00

    0.00 0.00 99.53 625.86 625.86

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0.00 0.00 3.85 24.86 26.11

    0.00 0.00 5.57 34.25 34.250.00 0.00 199.06 113.87 0.00

    0.00 0.00 (66.35) (37.96) 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 (5.45) (34.25) (34.31)

    0.00 0.00 (1.49) (9.39) (9.39)

    0.00 0.00 (1.99) (12.52) (12.52)

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    (141.68) (1,785.21) (860.72) 704.74 630.00

    0.00 0.00 103.50 650.73 651.91

    0.00 0.00 (69.84) (59.86) (21.91)

    0.00 0.00 33.66 590.86 630.000.00 0.00 103.50 650.73 651.91

    0.00 0.00 (69.84) (59.86) (21.91)

    0.00 0.00 33.66 590.86 630.00

  • 7/31/2019 Tev Model ~Sez130911

    21/91

  • 7/31/2019 Tev Model ~Sez130911

    22/91

  • 7/31/2019 Tev Model ~Sez130911

    23/91

  • 7/31/2019 Tev Model ~Sez130911

    24/91

  • 7/31/2019 Tev Model ~Sez130911

    25/91

    2021-2022 2022-2023 2023-2024 2024-2025162.89% 171.03% 179.59% 188.56%

    162.89% 171.03% 179.59% 188.56%

    2021-2022 2022-2023 2023-2024 2024-2025

    0.00% 0.00% 0.00% 0.00%

    0.0 0.0 0.0 0.0

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    2021-2022 2022-2023 2023-2024 2024-2025

    0% 0% 0% 0%

    0% 0% 0% 0%

    0 0 0 0

    0 0 0 0

    1,426,960 1,426,960 1,426,960 1,426,960

    12 12 12 12

    54 56 59 62

    0 0 0 0

    2021-2022 2022-2023 2023-2024 2024-2025

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

  • 7/31/2019 Tev Model ~Sez130911

    26/91

  • 7/31/2019 Tev Model ~Sez130911

    27/91

  • 7/31/2019 Tev Model ~Sez130911

    28/91

  • 7/31/2019 Tev Model ~Sez130911

    29/91

  • 7/31/2019 Tev Model ~Sez130911

    30/91

  • 7/31/2019 Tev Model ~Sez130911

    31/91

  • 7/31/2019 Tev Model ~Sez130911

    32/91

  • 7/31/2019 Tev Model ~Sez130911

    33/91

  • 7/31/2019 Tev Model ~Sez130911

    34/91

  • 7/31/2019 Tev Model ~Sez130911

    35/91

  • 7/31/2019 Tev Model ~Sez130911

    36/91

  • 7/31/2019 Tev Model ~Sez130911

    37/91

    Total Built up Area (Sft) 1,261,232

    Loading on the FSI Area in % 20%

    Total Leasable Area (Sft) 1,513,478

    Base Cost of Construction (INR per sq. ft of Built-Up Area) 1,950

    Loaded Cost of Construction (INR per sq. ft of Built up Area) 2,182

    Lease Rents (INR per sft per month) 33

    Car Parking Rental (INR per Bay per month) 2,500

    Revenue Escalation YoY 5%

    Cost Escalation YoY 5%

    Lease Escalation on Renewal 15%

    Security Deposit (No. of months Rental) 6

    No. of Months Rentals For Brokerage 2

    ParticularsCost Index

    Revenue Index (5% Growth)

    Development Costs

    Construction Phasing 100.00%

    Construction Phasing - Built up Area (sq. ft) 1,261,232

    Loaded Construction Cost (INR Millions) 3,256.83

    Pre Lease up Administration Expenditure (INR Mn.) 1.50%

    Pre Lease up Marketing Costs (INR Mn.) 2.00%

    Contingencies (%) 5.00%

    Total Development Costs (INR Mn.) 3,533.66

    RevenuesAbsorption Schedule

    Pre Committed Area

    Post Completion Absorption

    Area for Revenues (Pre-Commitments)

    Area for Revenues (Post Completion)

    Cumulative Area Leased

    No of Months Revenues (First Year)

    Lease Rents (INR per sft per month)

    Lease Rentals 33

    Weighted Average ~ Pre Commitments 40

    Weighted Average ~ Post Completion 45

    Lease Revenues (INR Mn)Pre Commitments

    Area Committed in Yr 1

    Area Committed in Yr 2

    IT/ITeS Office Space ~ Phase II

    Revenue Assumptions

    100%

    1,513,478

  • 7/31/2019 Tev Model ~Sez130911

    38/91

  • 7/31/2019 Tev Model ~Sez130911

    39/91

  • 7/31/2019 Tev Model ~Sez130911

    40/91

    sft

    INR

    INR

    INR

    INR

    Months

    Months

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016100.00% 105.00% 110.25% 115.76% 121.55%

    100.00% 105.00% 110.25% 115.76% 121.55%

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0.00% 0.00% 2.00% 60.00% 30.00%

    0.0 0.0 25,224.6 756,739.2 378,369.6

    0.00 0.00 60.68 1,911.57 1,003.57

    0.00 0.00 0.91 28.67 15.05

    0.00 0.00 1.21 38.23 20.07

    0.00 0.00 3.03 95.58 50.18

    0.00 0.00 65.84 2,074.05 1,088.88

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0% 0% 0% 0% 20%

    0% 0% 0% 0% 0%

    0 0 0 0 302,696

    0 0 0 0 0

    0 0 0 0 302,696

    0 0 0 0 0

    33 35 36 38 40

    0 0 0 0 0

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

  • 7/31/2019 Tev Model ~Sez130911

    41/91

  • 7/31/2019 Tev Model ~Sez130911

    42/91

  • 7/31/2019 Tev Model ~Sez130911

    43/91

  • 7/31/2019 Tev Model ~Sez130911

    44/91

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    108.97 145.29 145.29 161.64 167.09

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00

    0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    114.42 152.56 152.56 169.72 175.44

    159.82 159.82 159.82 183.80167.09 167.09 167.09

    177.99 177.99

    0.00

    223.39 457.68 624.76 836.26 871.40

    2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

    7.88 16.54 23.15 30.39 31.91

    10.90 21.79 29.06 36.32 36.32148.93 79.91 83.54 88.99 0.00

    (49.64) (26.64) (27.85) (29.66) 0.00

    0.00 0.00 0.00 0.00 0.00

    (12.11) (24.80) (33.85) (45.15) (46.98)

    (3.35) (6.87) (9.37) (12.54) (13.07)

    (4.47) (9.15) (12.50) (16.73) (17.43)

    2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

    16.63 508.46 676.96 887.88 862.15

    230.05 471.21 643.13 857.82 892.65

    (57.46) (42.66) (49.71) (58.93) (30.50)

    172.59 428.55 593.41 798.89 862.15378.98 551.12 726.67 946.81 892.65

    (57.46) (42.66) (49.71) (58.93) (30.50)

    321.52 508.46 676.96 887.88 862.15

  • 7/31/2019 Tev Model ~Sez130911

    45/91

  • 7/31/2019 Tev Model ~Sez130911

    46/91

  • 7/31/2019 Tev Model ~Sez130911

    47/91

  • 7/31/2019 Tev Model ~Sez130911

    48/91

  • 7/31/2019 Tev Model ~Sez130911

    49/91

  • 7/31/2019 Tev Model ~Sez130911

    50/91

  • 7/31/2019 Tev Model ~Sez130911

    51/91

  • 7/31/2019 Tev Model ~Sez130911

    52/91

  • 7/31/2019 Tev Model ~Sez130911

    53/91

  • 7/31/2019 Tev Model ~Sez130911

    54/91

  • 7/31/2019 Tev Model ~Sez130911

    55/91

  • 7/31/2019 Tev Model ~Sez130911

    56/91

  • 7/31/2019 Tev Model ~Sez130911

    57/91

  • 7/31/2019 Tev Model ~Sez130911

    58/91

  • 7/31/2019 Tev Model ~Sez130911

    59/91

  • 7/31/2019 Tev Model ~Sez130911

    60/91

  • 7/31/2019 Tev Model ~Sez130911

    61/91

    sft

    INR

    INR

    INR

    INR

    Months

    Months

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016100.00% 105.00% 110.25% 115.76% 121.55%

    100.00% 105.00% 110.25% 115.76% 121.55%

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0.00% 0.00% 2.00% 60.00% 38.00%

    0.0 0.0 4,356.2 130,686.1 82,767.9

    0.00 0.00 12.12 381.93 253.98

    0.00 0.00 0.18 5.73 3.81

    0.00 0.00 0.24 7.64 5.08

    0.00 0.00 0.61 19.10 12.70

    0.00 0.00 13.16 414.39 275.57

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0% 0% 0% 0% 20%

    0% 0% 0% 0% 10%

    0 0 0 0 52,274

    0 0 0 0 26,137

    0 0 0 0 78,412

    0 0 0 0 3

    50 53 55 58 61

    0 0 0 0 61

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

  • 7/31/2019 Tev Model ~Sez130911

    62/91

    0.00 0.00 0.00

    0.00 0.00

    9.57

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00

    4.78

    0.00 0.00 0.00 0.00 14.35

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0.00 0.00 0.00 0.00 0.68

    0.00 0.00 0.00 0.00 0.590.00 0.00 0.00 0.00 28.70

    0.00 0.00 0.00 0.00 (9.57)

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 (0.78)

    0.00 0.00 0.00 0.00 (0.22)

    0.00 0.00 0.00 0.00 (0.29)

    2011-2012 2012-2013 2013-2014 2014-2015 2015-2016

    0.00 0.00 (13.16) (414.39) (242.10)

    0.00 0.00 0.00 0.00 14.84

    0.00 0.00 0.00 0.00 (10.07)

    0.00 0.00 0.00 0.00 4.770.00 0.00 0.00 0.00 43.54

    0.00 0.00 0.00 0.00 (10.07)

    0.00 0.00 0.00 0.00 33.47

  • 7/31/2019 Tev Model ~Sez130911

    63/91

  • 7/31/2019 Tev Model ~Sez130911

    64/91

    2016-2017 2017-2018 2018-2019 2019-2020 2020-2021127.63% 134.01% 140.71% 147.75% 155.13%

    127.63% 134.01% 140.71% 147.75% 155.13%

    2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

    0.00% 0.00% 0.00% 0.00% 0.00%

    0.0 0.0 0.0 0.0 0.0

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

    0% 0% 0% 0% 0%

    30% 40% 0% 0% 0%

    0 0 0 0 0

    78,412 104,549 0 0 0

    156,823 261,372 261,372 261,372 261,372

    12 12 12 12 12

    64 67 70 74 78

    64 67 0 0 0

    2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

  • 7/31/2019 Tev Model ~Sez130911

    65/91

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    38.26 38.26 39.70 44.00 44.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00

    0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    19.13 19.13 19.85 22.00 22.00

    60.22 60.22 60.22 69.25 69.25

    84.06 84.06 84.06 96.670.00 0.00 0.00

    0.00 0.00

    0.00

    117.62 201.67 203.83 219.32 231.93

    2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

    5.74 10.04 10.54 11.07 11.63

    4.70 7.84 7.84 7.84 7.8430.11 42.03 0.00 0.00 0.00

    (10.04) (14.01) 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    (6.40) (10.98) (11.11) (11.91) (12.57)

    (1.76) (3.03) (3.06) (3.29) (3.48)

    (2.35) (4.03) (4.08) (4.39) (4.64)

    2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

    137.61 229.54 203.97 218.64 230.71

    121.66 208.58 211.10 226.32 238.82

    (14.15) (21.07) (7.13) (7.68) (8.12)

    107.50 187.51 203.97 218.64 230.71151.77 250.61 211.10 226.32 238.82

    (14.15) (21.07) (7.13) (7.68) (8.12)

    137.61 229.54 203.97 218.64 230.71

  • 7/31/2019 Tev Model ~Sez130911

    66/91

  • 7/31/2019 Tev Model ~Sez130911

    67/91

    2021-2022 2022-2023 2023-2024 2024-2025162.89% 171.03% 179.59% 188.56%

    162.89% 171.03% 179.59% 188.56%

    2021-2022 2022-2023 2023-2024 2024-2025

    0.00% 0.00% 0.00% 0.00%

    0.0 0.0 0.0 0.0

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    2021-2022 2022-2023 2023-2024 2024-2025

    0% 0% 0% 0%

    0% 0% 0% 0%

    0 0 0 0

    0 0 0 0

    261,372 261,372 261,372 261,372

    12 12 12 12

    81 86 90 94

    0 0 0 0

    2021-2022 2022-2023 2023-2024 2024-2025

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

  • 7/31/2019 Tev Model ~Sez130911

    68/91

  • 7/31/2019 Tev Model ~Sez130911

    69/91

  • 7/31/2019 Tev Model ~Sez130911

    70/91

  • 7/31/2019 Tev Model ~Sez130911

    71/91

  • 7/31/2019 Tev Model ~Sez130911

    72/91

  • 7/31/2019 Tev Model ~Sez130911

    73/91

  • 7/31/2019 Tev Model ~Sez130911

    74/91

  • 7/31/2019 Tev Model ~Sez130911

    75/91

  • 7/31/2019 Tev Model ~Sez130911

    76/91

  • 7/31/2019 Tev Model ~Sez130911

    77/91

  • 7/31/2019 Tev Model ~Sez130911

    78/91

  • 7/31/2019 Tev Model ~Sez130911

    79/91

    Service Apartments

    Proposed Configuration

    Total Room Stock 266

    Gross Room Size (Sft) 9,688

    Total Gross Area (Sqm) 20,235

    Total Gross Area (Sft) 217,810

    Construction Cost (INR Per Sft) 4,444

    Loaded Cost of Construction (INR Per Sft) 4,686

    ParticularsCost Index

    Revenue Index (5% Growth)

    Assumptions

    Construction Schedule 100%

    Total Construction Cost (INR Mn.) 1,202.95

    Contingencies 5%

    Total Construction Cost (INR Mn.) 1,263.10

    Revenue Assumptions

    ARR (INR/Room Night) 4,500

    ARR Escalation (Per Annum) 5.00%

    Occupancy Rate 80.00%

    Room Nights Sold

    Revenue Schedule

    Room Sales (INR Mn.)

    Food & Beverage Sales (as % of Room Sales) 20.00%

    MOD Sales (as % of Room Sales) 5.00%

    Spa / Health Club revenues (as % of Room Sales) 5.00%

    Total Revenue (INR Mn.)

    Operating Expenditure Schedule

    Room costs (as % of Room Sales) 12.50%

    F & B Cost (as % of F & B Sales) 45.00%

    Other Expense (as % of F & B Sales) 1.00%MOD costs (as % of MOD Sales) 40.00%

    Spa / Health Costs (as a %age of sales) 40.00%

    Other Overhead Ex enditure

    Administrative expenses (as % of Total Revenue) 2.00%

    Maintenance (as % of Total Revenue) 2.00%

    Operating expenses (as % of Total Revenue) 10.00%

    Marketing costs (as % of Total Revenue) 2.00%

    Base Management Fee (% of total revenue) 3.00%

  • 7/31/2019 Tev Model ~Sez130911

    80/91

    F F & E (as % of Total Revenue) 2.00%

    Total Expenditure (INR Mn.)

    Gross Operating Profit

    Gross Operating Profit (%)

    Management Incentive Fee (as % of GOP) 7.50%

    Total Expenditure (incl. management fee)

    Gross Operating Profit - Post Management Fee (INR Mn.)

    Gross Operating Profit - Post Management Fee (%)

    Net Cash Flow

  • 7/31/2019 Tev Model ~Sez130911

    81/91

    435

    2011-2012 2012-2013 2013-2014 2014-2015100.00% 105.00% 110.25% 115.76%

    100.00% 105.00% 110.25% 115.76%

    2011-2012 2012-2013 2013-2014 2014-2015

    0% 0% 2% 60%

    0.00 0.00 22.51 708.98

    0.00 0.00 1.13 35.45

    - - 23.63 744.43

    4,500 4725 4,961 5,209

    5.00% 5.00% 5.00% 5.00%

    - - -

    (Total No of Rooms provided by the client. The loaded

    area per room is equivalent to less than 500 sft based

    on client inputs.

  • 7/31/2019 Tev Model ~Sez130911

    82/91

    (23.63) (744.43)

  • 7/31/2019 Tev Model ~Sez130911

    83/91

  • 7/31/2019 Tev Model ~Sez130911

    84/91

    1.90 9.42 11.42 12.79 13.43

    38.70 192.10 232.73 260.66 273.70

    56.23 279.09 338.12 378.70 397.63

    59% 59% 59% 59% 59%

    4.22 20.93 25.36 28.40 29.82

    42.92 213.03 258.09 289.06 303.52

    52.01 258.15 312.76 350.30 367.81

    55% 55% 55% 55% 55%

    (443.03) 258.15 312.76 350.30 367.81

  • 7/31/2019 Tev Model ~Sez130911

    85/91

    2020-2021 2021-2022 2022-2023 2023-2024 2024-2025155.13% 162.89% 171.03% 179.59% 188.56%

    155.13% 162.89% 171.03% 179.59% 188.56%

    2020-2021 2021-2022 2022-2023 2023-2024 2024-2025

    0% 0% 0% 0% 0%

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    - - - - -

    6,981 7,330 7,697 8,081 8,485

    5.00% 5.00% 5.00% 5.00% 5.00%

    80.00% 80.00% 80.00% 80.00% 80.00%

    77,672 77,672 77,672 77,672 77,672

    542.23 569.34 597.80 627.69 659.08

    108.45 113.87 119.56 125.54 131.82

    27.11 28.47 29.89 31.38 32.95

    27.11 28.47 29.89 31.38 32.95

    704.89 740.14 777.15 816.00 856.80

    67.78 71.17 74.73 78.46 82.38

    48.80 51.24 53.80 56.49 59.32

    1.08 1.14 1.20 1.26 1.3210.84 11.39 11.96 12.55 13.18

    10.84 11.39 11.96 12.55 13.18

    14.10 14.80 15.54 16.32 17.14

    14.10 14.80 15.54 16.32 17.14

    70.49 74.01 77.71 81.60 85.68

    14.10 14.80 15.54 16.32 17.14

    21.15 22.20 23.31 24.48 25.70

  • 7/31/2019 Tev Model ~Sez130911

    86/91

    14.10 14.80 15.54 16.32 17.14

    287.38 301.75 316.84 332.68 349.31

    417.51 438.39 460.31 483.33 507.49

    59% 59% 59% 59% 59%

    31.31 32.88 34.52 36.25 38.06

    318.69 334.63 351.36 368.93 387.37

    386.20 405.51 425.79 447.08 469.43

    55% 55% 55% 55% 55%

    386.20 405.51 425.79 447.08 469.43

  • 7/31/2019 Tev Model ~Sez130911

    87/91

    Rockman Shahpura Multi Product SEZ Financials

    Space Assumptions

    Space Assumptions No. of Units Capacity Area (sqm)/ unitTotal Area

    (sqm)

    Total Area

    (sft)

    Total C&EC 10,098 108,693

    Convention, Conference & Meeting Facilities 6,075 65,391Plenary/Convention Hall (Multipurpose/ Divisible in to 4) 1 2,500 1.2 3,000 32,292

    Meeting Room # 1 1 100 1.5 150 1,615

    Meeting Room # 2 1 50 1.5 75 807

    Board Room # 1 1 50 3 150 1,615

    Banquet Kitchens /Stores / Receiving 1 30% 3,375 1,013 10,898

    Pre-function Areas 1 20% 3,375 675 7,266

    Circulation 1 20% 5,063 1,013 10,898

    F&B 590 6,355

    Coffee Shop 2 60 1.6 192 2,067

    Food court with multiple outlets 1 200 1.5 300 3,229

    Circulation 1 20% 492 98 1,059

    S eciality Areas & Administration 1,680 18,083

    Speciality Areas & Administration 1 1 1400 1,400 15,069

    Circulation 1 20% 1,400 280 3,014

    Public Areas (General Reception/ lobby, Toilets, Ticketing) 5% 417 4,491

    Support Areas / Back of the House 1,001 10,779Sho s & Offices 334 3,593

    Operating Days 350 Days

    Escalation in F&B Revenues 7%

    Escalation in Rates (rental for F&B outlets) 5%

    Escalation in Rates every 3 years (rental for F&B outlets) 15%

    Cost Assum tions

    Particulars FY Year 2012 Year 2013 Year 2014 Year 2015Cost Index 100.00% 105.00% 110.25% 115.76%Revenue Index (5% Growth) 100.00% 105.00% 110.25% 115.76%

    Capex

    Capex

    FY 2012 2013 2014 2015

    Construction Schedule 0% 0% 2% 50%

    Capex INR Mn - - 13.13 344.65

    Contingencies 5% - - 0.66 17.23

    Total Capex INR Mn 743.48 - - 13.79 361.88

    Revenue Pro ections

    Convention & Conference ~ Revenue

    Category of Events Share of Events Average Utlization Peak Gathering

    No. of Days per

    Event100-300 Pax. 20% 80% 300 1

    300-500 Pax. 70% 80% 500 1

    500-1,000 Pax. 10% 75% 1,000 1Above 1,000 Pax. (No. of Events) 12 75% 2,500 2

    2012 2013 2014 2015

    Total Number of Events per Year Nos. 500 525 551 579

    Growth in Number of Events 5%

    Revenue INR Per pax 1,200Months 0 0 0 0

    Share of Events Average Utlization 2012 2013 2014 2015

    100-300 Pax. 20% 80% 100 105 110 116

    300-500 Pax. 70% 80% 350 368 386 405

    500-1,000 Pax. 10% 75% 50 53 55 58Above 1,000 Pax. (No. of Events) 12 75% 12 13 14 15

    Total Number of Events at Convention Centre 512 539 565 594

    Overall Revenue Utilization INR Mn. 0.00 0.00 0.00 0.00

    Incentives/ Conf/ Meetings ~ Meeting Rooms Unit Y-o-Y Revenues (INR Million )

    FY 2012 2013 2014 2015

    Capcacity Pax 200 200 200 200 200

    Area sqm 375 375 375 375 375

    No. of Meetings 150 158 165 174 182

    No. of Meetings per room No. 0 0 0 0

  • 7/31/2019 Tev Model ~Sez130911

    88/91

    Rockman Shahpura Multi Product SEZ Financials

    Days of Meeting in a year Avg Days 1 0 0 0 0

    Meeting Rooms ~ Revenue

    Incentives/ Conf/ Meetings ~ Meeting Rooms Unit Y-o-Y Revenues (INR Million )FY 2012 2013 2014 2015

    Capcacity Pax 200 200 200 200 200

    No. of Meetings No. 0 0 0 0

    No. of Meetings requiring F&B No. 50% 0 0 0 0

    Current Rates/ Day (F&B) INR/ pax 900 0.0 0.0 0.0 0.0

    Rentals per Room INR/SQM 180 0.0 0.0 0.0 0.0

    Incentives/ Conf/ Meetings ~ Total Revenues INR 0.0 0.0 0.0 0.0

    F&B Outlets ~ Rentals

    F&B Outlets ~ Rental Revenues

    FY 2012 2013 2014 2015

    Rental INR/ sft/ mth 200.00 0.00 0.00 0.00 0.00

    Coffee Shop INR mn - - - -Food court with multiple outlets INR mn - - - -

    Total F&B Outlets Rental Revenues INR mn - - - -

    Shops & Offices ~ Rental Revenues

    FY 2012 2013 2014 2015

    Rental (INR per sqmt per month) INR/ sft/ mth 150.00 0.00 0.00 0.00 0.00

    Shops & Offices INR mn - - - -

    Total Shops Rental Revenues INR mn - - - -

    Total Revenues

    Total RevenuesFY 2012 2013 2014 2015

    Total F&B Revenues INR Mn - - - -

    Total F&B Outlet Rental Revenue INR Mn - - - -

    Shops & Offices ~ Rental Revenues INR Mn - - - -

    Total Revenue INR Mn - - - -

    Operating Costs

    Operating Costs

    FY 2012 2013 2014 2015

    Staff Costs as % of Total Revenues INR Mn 4% - - - -

    F&B Costs as % of F&B Revenues INR Mn 40% - - - -

    General Costs as % of Total Revenues INR Mn 1% - - - -Pro erty O & M as % of Total Revenues INR Mn 2% - - - -

    Consumables & Material as % of Total Revenues INR Mn 2% - - - -

    Energy Costs as a % of total revenue INR Mn 8% - - - -

    Insurance as % of Total Revenues INR Mn 1% - - - -

    Marketing Exps as % of Total Revenues INR Mn Variable - - - -

    - - 8% 8%

    Total Opex INR Mn - - - -

  • 7/31/2019 Tev Model ~Sez130911

    89/91

    Rockman Shahpura Multi Product SEZ Financials

    Year 2023 Year 2024 Year 2025171.03% 179.59% 188.56%171.03% 179.59% 188.56%

    2023 2024 2025

    0% 0% 0%

    - - -

    - - -

    - - -

    2023 2024 2025

    856 899 944

    12 12 12

    2023 2024 2025171 180 189

    599 629 661

    86 90 94

    23 24 25879 923 969

    885.39 974.72 1,072.58

    2023 2024 2025

    200 200 200

    375 375 375

    269 283 297

    90 94 99

  • 7/31/2019 Tev Model ~Sez130911

    90/91

    Rockman Shahpura Multi Product SEZ Financials

    90 94 99

    2023 2024 2025

    200 200 200

    90 94 99

    45 47 49

    17.0 19.1 21.3

    10.4 11.4 12.6

    27.4 30.5 33.9

    2023 2024 2025

    264.50 264.50 264.50

    0.55 0.55 0.550.85 0.85 0.85

    1.40 1.40 1.40

    2023 2024 2025

    198.38 198.38 198.38

    0.95 0.95 0.95

    0.95 0.95 0.95

    2023 2024 2025

    912.80 1,005.20 1,106.44

    1.40 1.40 1.400.95 0.95 0.95

    915.15 1,007.55 1,108.79

    2023 2024 2025

    36.61 40.30 44.35

    365.12 402.08 442.57

    9.15 10.08 11.0918.30 20.15 22.18

    18.30 20.15 22.1873.21 80.60 88.70

    9.15 10.08 11.09

    18.30 20.15 22.182% 2% 2%

    548.15 603.59 664.33

  • 7/31/2019 Tev Model ~Sez130911

    91/91

    Project Cash Flows

    Net Cash Flows (INR Mn) 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018

    IT ~ Phase I (141.68) (1,785.21) (860.72) 704.74 630.00 644.90 718.44

    IT ~ Phase II 0.00 0.00 (65.84) (2,074.05) (1,088.88) 16.63 508.46Commercial Office 0.00 0.00 (13.16) (414.39) (242.10) 137.61 229.54

    Service Apartments 0.00 0.00 (23.63) (744.43) (443.03) 258.15 312.76

    C&EC 0.00 0.00 (13.79) (361.88) (303.98) 77.67 208.04

    Net Project Cash Flows (INR Mn) (141.68) (1,785.21) (977.14) (2,890.01) (1,447.99) 1,134.97 1,977.25

    Development Cost 2011-2012 2012-2013 2013-2014 2014-2015 2015-2016 2016-2017 2017-2018

    IT ~ Phase I 135.15 1702.95 1043.05 0.00 0.00 0.00 0.00

    IT ~ Phase II 0.00 0.00 62.81 1978.47 1038.70 290.84 0.00

    Commercial Office 0.00 0.00 12.55 395.30 262.87 0.00 0.00

    Service Apartments 0.00 0.00 22.51 708.98 471.47 0.00 0.00

    C&EC 0.00 0.00 13.13 344.65 289.50 60.80 0.00

    Total Cost of Construction (INR Mn.) 135.15 1702.95 1154.05 3427.39 2062.54 351.63 0.00Contingencies 6.53 82.27 55.81 167.36 100.93 17.09 0.00