Test & Adjust PW140/ 160/ 180-7EO Page 1 (01/2008)
Testing & Adjusting PW140/ 160/ 180-7EO
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
2/28
Test & Adjust PW140/ 160/ 180-7EO Page 2 (01/2008)
PW140-7/ PW160EO-7/ PW180EO-7
Testing & AdjustingHydraulic System
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
3/28
Test & Adjust PW140/ 160/ 180-7EO Page 3 (01/2008)
PPC pressure portM10x1,25
Standard: 35 38 bar
PPC Pressure Check Port PW140-7
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
4/28
Test & Adjust PW140/ 160/ 180-7EO Page 4 (01/2008)
PPC pressure port
M10x1,25
Standard: 35 38 bar
PPC Pressure Check Port PW160/ 180-7EO
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
5/28
Test & Adjust PW140/ 160/ 180-7EO Page 5 (01/2008)
Port PA Pump
pressure
(M10x1,25 )
Port PLFC
LS pressure
(M10x1,25)
LS-EPCsolenoid valve
(V22)
PC-EPCsolenoid valve
(V21)
Pump and LS Pressure Check Ports
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
6/28
Test & Adjust PW140/ 160/ 180-7EO Page 6 (01/2008)
PC ValveLS Valve
LS and PC Valve Position
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
7/28
Test & Adjust PW140/ 160/ 180-7EO Page 7 (01/2008)
Procedure:
Disconnect CN V22 of the LS-EPC solenoid.
Start the engine with Auto Deceleration OFF and set fuel dial to MAX. rpm.
Lift the wheels off the ground by using undercarriage attachments and / or work equipment.
Select Hi travel speed.
(It is also possible to perform this test in Lo speed.)
Depress travel pedal fully.
Measure a LS differential pressure.
Adjust the LS valve if necessary.
Measure Work Equipment LS Differential Pressure
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
8/28
Test & Adjust PW140/ 160/ 180-7EO Page 8 (01/2008)
Procedure :Start the engine and adjust the LS valve. Loosen lock nut (10) and adjust the LS differential
pressure by turning the adjustment screw (11).
If the adjusting screw is turned to the right, the differential pressure rises.
If the adjusting screw is turned to the left, the differential pressure falls.
1011
LS Valve Adjustment
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
9/28
Test & Adjust PW140/ 160/ 180-7EO Page 9 (01/2008)
PC pressure check port PEN
M10 x 1.25mm
Perform the test in Pmode with arm in
relief and power MAX.
PC pressure is about
60% of pumppressure.
PC Pressure Check Port PW140-7
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
10/28
Test & Adjust PW140/ 160/ 180-7EO Page 10 (01/2008)
PC pressure check port PEN
M10 x 1.25mm
Perform the test in Pmode with arm in
relief and power MAX.
PC pressure is about
60% of pumppressure.
PC Pressure Check Port PW160/ 180-7EO
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
11/28
Test & Adjust PW140/ 160/ 180-7EO Page 11 (01/2008)
Procedure :Loosen lock nut (8) and adjust stall speed with the adjusting screw (9)
.Adjustable range :Maximum 1 turn to the left => Stall speed increases.
Maximum 1/2 turn to the right => Stall speed decreases.
PC Valve Adjustment
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
12/28
Test & Adjust PW140/ 160/ 180-7EO Page 12 (01/2008)
5 Pump LS- EPC ValveDo not travel the machine.
2 LS EPC Valve FULL OFF OFF
Check Point - PSIG Creep
P Neutral Neutral
Creep 583mA
900mA
Arm Dump pump relieved 0mA
LS-EPC pressure port PSIG
10 x 1.25mm
LS EPC Pressure Check Port PW140-7
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
13/28
Test & Adjust PW140/ 160/ 180-7EO Page 13 (01/2008)
5 Pump LS- EPC ValveDo not travel the machine.
2 LS EPC Valve FULL OFF OFF
Check Point - PSIG Creep
P Neutral Neutral
Creep 583mA
900mA
Arm Dump pump relieved 0mA
LS-EPC pressure port PSIG
10 x 1.25mm
LS EPC Pressure Check Port PW160/ 180-7EO
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
14/28
Test & Adjust PW140/ 160/ 180-7EO Page 14 (01/2008)
5 Pump PC-EPC ValveDo not travel the machine.
1 PC EPC Valve OFF OFF
Check point - PM FULL
B
Value barOperation
Work
Neutral
Travel
LeverNeutral
Neutral
Max Equipment
Auto
Decel
E
L
Low
Working
Mode
P
Checking
item
Fuel
Dial
Power
PC-EPC pressure port PM
10 x 1.25mm
PC EPC Pressure Check Port PW140-7
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
15/28
Test & Adjust PW140/ 160/ 180-7EO Page 15 (01/2008)
5 Pump PC-EPC ValveDo not travel the machine.
1 PC EPC Valve OFF OFF
Check point - PM FULL
B
Value barOperation
Work
Neutral
Travel
LeverNeutral
Neutral
Max Equipment
Auto
Decel
E
L
Low
Working
Mode
P
Checking
item
Fuel
Dial
Power
PC-EPC pressure port PM
10 x 1.25mm
PC EPC Pressure Check Port PW160/ 180-7EO
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
16/28
Test & Adjust PW140/ 160/ 180-7EO Page 16 (01/2008)
Procedure :- Divide front and rear pump with the merge divider valve.
- Adjust high main pressure (385 bar) first, then low mainpressure (355 bar).
Lock nut Adjustingscrew for highmain pressure
(385 bar)
Adjustingscrew for lowmain pressure
(355 bar)
Lock nut
Main Relief Valve Adjustment
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
17/28
Test & Adjust PW140/ 160/ 180-7EO Page 17 (01/2008)
S
B
T
A
G
MB X M1U
MA
LeftRight
G (Travel pressure)X (Creep speed)
A B
S
M1 (Servo pistonpressure)
ST
A,B
U
G
M1
MB, (MA)
T
MIN. angle stopper bolt
Pressure dependentange set (270bar)Left side
G und X : M14 x 1.5
MA und MB : M18 x 1.5
S : M27 x 2
M1: M10x 1Safety Valve Safety Valve
MAX. anglestopper bolt
420 bar
Travel Motor Ports
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
18/28
Test & Adjust PW140/ 160/ 180-7EO Page 18 (01/2008)
PW140-7/ PW160EO-7/ PW180EO-7
Testing & Adjusting
Engine
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
19/28
Test & Adjust PW140/ 160/ 180-7EO Page 19 (01/2008)
Measure Low Fuel Pressure
5.) Measure low fuel pressure circuit.
Read the Safety Instructions from the ShopManual.
Make sure all temperatures are within
working range.Remove plug (1) from the fuel filter bracketand install a test nipple (G1, G2).
Run the engine at low idle in P Mode andmeasure the fuel pressure.
Standard Value:
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
20/28
Test & Adjust PW140/ 160/ 180-7EO Page 20 (01/2008)
Measure Return Fuel Pressure
6.) Measure return fuel pressure circuit.
Read the Safety Instructions from the ShopManual.
Make sure all temperatures are within
working range.Remove plug (2) from the return fuel blockand install a test nipples (1 and 3).
Install a gauge and run the engine at low idleor crank it with the starter motor for no more
than 20 seconds.
Standard Value:
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
21/28
Test & Adjust PW140/ 160/ 180-7EO Page 21 (01/2008)
Adjust Valve Clearance
7.) Adjust valve clearance
Read the Safety Instructions in the ShopManual.
Remove all valve cover (1).
Remove plate (2) and cap (3) from the flywheelhousing and install gear (B1).
Rotate the crankshaft in normal direction withgear (B1) to bring the stamped 1.6 TOP line(a) on the damper to the top and set the 1st.
cylinder to TDC.
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
22/28
Test & Adjust PW140/ 160/ 180-7EO Page 22 (01/2008)
Adjust Valve Clearance
Adjust the valves marked with ().
Loosen lock nut (5) of adjustment screw (6)and adjust the clearance by inserting aclearance gauge (B2) between crosshead (4)and rocker arm (3) until the clearance gauge
becomes slightly movable.
After the adjustment rotate the crankshaftagain in normal direction with gear (B1) tobring the stamped 1.6 TOP line (a) on thedamper to the top.
Adjust the valves marked with ().
Valve clearance:Intake valve 0,25 mm
Exhaust valve 0,51 mm
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
23/28
Test & Adjust PW140/ 160/ 180-7EO Page 23 (01/2008)
Injector Installation
8.) Please find the details in the extracted pages from the 107-1 Engine Shop Manual.
Click on the button to start start the pdf - pages.
Injector Installation
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
24/28
Test & Adjust PW140/ 160/ 180-7EO Page 24 (01/2008)
Measure Fuel Supply Pump Rate
9.) Measure fuel supply pump rate.
Read the Safety Instructions from the ShopManual.
Make sure all temperatures are within
working range.Disconnect fuel return hose (1) from the fuelsupply pump.
Connect the fuel return port of the supplypump to measuring cylinder (H4).
Run the engine at low idle or crank it with thestarter motor for no more than 20 secondsand measure the fuel return flow.
Standard Value:
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
25/28
Test & Adjust PW140/ 160/ 180-7EO Page 25 (01/2008)
Measure Pressure Limiter Leakage
10.) Measure fuel pressure limiter leakage.
Read the Safety Instructions from the ShopManual.
Make sure all temperatures are within
working range.Disconnect fuel return hose (2) from the fuelpressure limiter.
Connect the port of the pressure limiter tomeasuring cylinder (H4).
Run the engine at low idle and measure thefuel return flow.
Standard Value:
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
26/28
Test & Adjust PW140/ 160/ 180-7EO Page 26 (01/2008)
Measure Fuel Injector Return Flow
11.) Measure fuel injector return flow.
Read the Safety Instructions from the ShopManual.
Make sure all temperatures are within
working range.Disconnect fuel return hose (3) from the fuelinjectors.
Connect the return port of the fuel injectors tomeasuring cylinder (H4).
Run the engine at low idle or crank it with thestarter motor for no more than 20 secondsand measure the fuel return flow.
Standard Value:
-
8/10/2019 Testing&Adjusting PW140 160 180-7EO
27/28
Test & Adjust PW140/ 160/ 180-7EO Page 27 (01/2008)
Bleeding Air from the Fuel Circuit
12.) Air bleeding from the fuel circuit.
Read the Safety Instructions from the Shop Manual.
The fuel circuit is a self bleeding circuit through the marked orifice in the fuel return line.
After replacement of components in the fuel circuit operate the fuel priming pump until theknob becomes hard to move.
Lock the knob of the fuel priming pump and start the engine.
-