Test Processes for Information Systems
TPRO
1 Levels of Test Technology
Test Process according to IEEE-829
Testing as a Separate Subproject
Requirement Solicitation
Test Phases of the V-Model
Test Objects of the V-Model
Life Cycle Test Process by W. Perry
Dual Track Process Model
Test as a parallel Project by H. Sneed
A Standard Test Process
ANECON System Test Process
Sneed System Test Process
System Testing Cycle
Defining Test Levels
Establishing a Testing Profile
Planning the System Test
Defining Test Requirements
Allocating Test Requirements
Developing Test Scenarios
Implementing the Test
TPI Test Process Evaluation Model
Key Areas of a System Testing Process
Test Process Maturity Levels
Test Process Maturity Categories
Sample Test Process Maturity Matrix
Conclusions for testing Information Systems
2
3
4
5
6
7
8
9
10
14
15
16
17
18
19
20
21
22
23
11
12 25
24
26
TEMA
13
Levels of Testing TechnologyTPRO-1
TestProcess
Test Strategy
Test Methods
Test Procedures
Test Tools
Fromabstract
IncreasingLevel
OfDetail
ToConcrete
TestScripts
TestSelectionMethod
Choice of aTesting Strategy
Railroad Process Model
Data Driven System Test
Selective Test DataGeneration
Assertion Language forTest Data Specification
Assertion-basedTest DataGenerator
TEMA
Test Process according to ANSI/IEEE-829
TEMA TPRO-2
Test-Plan
Test-Design
Test CaseSpecificat.
Test ProcCoding
Test ObjectDelivery
TestLog
TestIncident
Reporting Test-Result
Reporting
T e s t Execution
Testing as a Separate SubprojectTPRO-3
The Main Project
RequirementsSubproject
DevelopmentSubproject Test
Subproject
TEMA
Requirement Solicitation is the Basis of Testing
TPRO-4
System RequirementsFunctional / Non-
Functional
System RequirementsFunctional / Non-
Functional
RequirementCollection
Basin
SystemRequirementDocuments
Hardware Software
TEMA
Test Phases in the V-Modell
TEMA TPRO-5
Components
UnitTest
Coding
DesignIntegration
test
Systemtest
Analysis
AcceptanceRequirements
Test Objects in the V-Modell
TEMA TPRO-6
Code
Req. Specs
SystemDesign
ModuleDesign
Systemtest
Procedures
Integration test
Procedures
Unit testProcedures
System test cases
Integration test cases
Unit test cases
Life Cycle Test Process by W. Perry
SYST TPRO-7
Development
Test
Projektstart
Requirements Design Programming Test Integration Maintainenance
SDLC-Phase nach ISO-12207
Req
uire
men
ts
Requirem
ents
Sys
tem
test
System
Mai
nten
ance
Regression test
Dual Track Process Model
TPRO-8
Requirement Specification
Dev
elop
men
t T
rack
Tes
ting
Tra
ck
Delivered Software System
TEMA
Ties
Introduced by Gelperin & HetzelFounders of the ISQI
Test as a Parallel Project
TEMA TPRO-9
Design Coding Unit Test
SystemTest
TestEvaluation
Test Data &Procedures
Test Casespecification
ProjectPlanning
Analysis
TestDesign
Testplanning
Acceptance
Require-ments
Correct?
N
Y
Development Project
Test Project
A Standard Test Process
TEMA TPRO-10
TestPlanning
TestConception
TestSpec.
TestExecution
TestEvaluation
Test Plan
TestConcept
TestCases
TestResults
TestDocum.
Closure
Init
ANECON System Testing Process
SYST TPRO-11
ReqSpecs
RequirementAnalysis
TestMetrics
TestPlanning
Test Plan TestDesign
Test CaseSpecification
PreliminaryTest Cases
FinalTest Cases
Test DataGenerationSchemas
TestData
TestExecution
TestResults
ExpectedResults
TestEvaluation
TestDocumentation
TEXT
TPLN
TSPC
TDAT
TEXE
TCON
TVAL
Sneed System Test Process (1)TPRO-12.1
RequirementSpecs.
German/EnglishTexts
RequirementAnalysis
Req. BasedTest Cases
Test Plan
InformationSystem
Architecture
UMLDiagrams
DesignAnalysis
Design BasedTest Cases
DESIGN
Base Line Document
Test CaseDatabase
CODING
CodeAnalysis
Code BasedTest Cases
CodeComponent
s
JavaClasses
Test GoalsTest StrategyTest MethodTest ProceduresTest Effort Estimation.................
Test Case IdTest Case PurposeTest Case TriggerRequirement TestedObjects TestedUse Case TestedPre ConditionsPost Conditions.................
TEMA
Sneed System Test Process (2) TPRO-12.2
Test CaseSpecification
DataInterfaces
InformationSystemDesign
Test DataGeneration
Tester
TestData
ValidationReport
TestResult
Evaluation
InformationSystem Test
Scenarios
TestDesign
Test CaseDatabase
Test CaseAnalysis
Test CaseDeficiencies
InformationSystem Test
Requirements
TestEnvironmentConstruction
TestResults
Test
Environment
SystemUnderTest
TestMonitor
Test Coverage
TestEvaluation
PostStates
Pre States
TEMA
System Testing Cycle
TPRO-13
AnalyzeRequirement
PlanTest
ExtractTest Cases
SpecifyTest Cases
DesignTest Scenarios
GenerateTest Data
ConstructTest
Environment
ExecuteTest
EvaluateTest
Soll
Ist
TEMA
DOD Testing Levels
TPRO-14
Software Development Plan
Software Test Plan
Secondary Test Plans, Procedures, Scenarios, and Data
Level 1
ModuleTest
Level 2
UnitTest
Level 3 Level 4 Level 5 Level 6
Bui
ldIn
tegr
atio
n
Sub
syst
em f
unct
iona
l(a
lloca
ted
by
build
)
Sys
tem
Inte
grat
ion
SystemTesting
TEMA
Establishing a Testing ProfileTPRO-15
Level 6
Level
6
Level
5
Level
4
Level
3
Level
2
Level
1
1. Configuration management
2. Organizational strategies
3. External simulator4. Regression testing5. Hierarchal testing6. Random testing7. Software
instrumentation
1. Configuration management
2. Data reviews3. Test tool
definition
Level 4 Level 3
1. Configuration management
2. Regression testing3. System simulation4. Organizational
autonomy5. Incremental
qualification6. Software
instrumentation
Level 5
Level 2 Level 1
TEMA
TPRO-16Planning the System Test
SystemTest-plan
SoftwareDevelopment
plan
SoftwareTestplan
Phase 1. Phase 2.
SystemProcedures
SystemTest
Scenarios
SystemTestData
Test Profile
BuildTest
Plan 1
General UnitTest Plan
FunctionalProcedures
BuildTest
Folder
Test tools,Techniques andmethodologies
ScenarioData
Procedures,Scenarios,
data
Secondaryplanning
documentation
TEMA
TPRO-17
Defining the Test RequirementsSystemTest-plan
SoftwareDevelopment
planProgramming
Practices,Standards and
conventions
Quality guidelines
Configurationmanagement
SoftwareTestplan
Testroadmap
Testspecs.
BuildTest
Plan 1
FunctionalProcedures
SoftwareDesign
SpecificationBuild Test
Folders
BuildProcedures,Scenariosand Data
TestScenariosand Data
TEMA
Construction Rules
Planned Metrics
Allocating the Test ResourcesTPRO-18
SystemTest-planSoftware
Developmentplan
SoftwareTest-plan
Schedules
FunctionalSpecification
Software architecture
Database architecture
_________________________
BuildTest-plan
BuildTest
Folder
FunctionalProceduresAllocatedTo builds
TEMA
Developing Test ScenariosTPRO-19
SoftwareTest-plan
SystemTest-plan
Level 3
TestProcedure
Level 5
TestProcedure
IntegrationTest requirement Test step Test scenario
Test stepTest scenario
Test scenario
Test scenario
Test step
Test step
TEMA
Implementing the TestTPRO-20
Test implementation and scenario
Test analysis
Unit developmentfolder
Test environmentcreation
Test execution
Test planning and development
Test plans
Buildtest
folder
Systemtest
folder
Testprocedure
Testscenario
Testscenario
Testscenario
Testdata
Testdata
Testdata
Test analysis
Test toolingTest execution
Dev
elop
men
t te
stin
g
Test implementation and execution
TEMA
The TPI Test Process Evaluation Model (Koomen & Pol)
TPRO-21TEMA
Key Areas
Maturity levels
Test maturity matrix
Acquired pointsImpovementSuggestions
Key Areas of a System Test ProcessTPRO-22.1TEMA
Key Area Level A Level B Level C Level D
Test Strategy Strategy for single high-level
test
Combined strategy for high-
level tests
Combined strategy for
high-level tests plus low-
lvel tests or evaluation
Combined strategy for
all test and evaluation
levels
Life-cycle model Planning, Specification,
Execution
Planning, Preparation,
Specification, Execution, and
Completion
Moment of
involvement
Completion of test basis Start of test basis Start of requirements
definition
Project initiation
Estimating and
planning
Substantiated estimating and
planning
Statistically substantiated
estimating and planning
Test specification
techniques
Informal techniques Formal techniques
Static test techniques Inspection of test basis Checklists
Metrics Project metrics (product) Project metrics (process) System metrics Organization metrics
(>1 system)
Test tools Planning and control tools Execution and analysis tools Extensive automation of
the test process
Test environment Managed and controlled test
environment
Testing in the most suitable
environment
‘Environment-on-call’
Office environment Adequate and timely office
environment
Key Areas of a System Test ProcessTPRO-22.2TEMA
Key Area Level A Level B Level C Level D
Commitment and motivation
Assignment of budget and time
Testing integrated in project organization
Test-engineering
Test functions and training
Test manager and testers (Formal) Methodical, Technical and Functional Support, Management
Formal internal Quality Assurance
Scope of methodology Project specific Organization generic Organization optimizing, R & D activities
Communication Internal communication Project communication (defects, change control)
Communication within organization about the quality of the test processes
Reporting Defects Progress (status of tests and products), activities (costs and time, milestones), defects with priorities
Risks and recommendations, substantiated with metrics
Recommendations have a Software Process Improvement character
Defect management Internal defect management
Extensive defect management with flexible reporting facilities
Project defect management
Testware management Internal testware management
External management of test basis and test object
Reusable testware Traceability system requirements to test cases
Test process management
Planning and execution Planning, execution, monitoring, and adjusting
Monitoring and adjusting within organization
Evaluation Evaluation techniques Evaluation strategy
Low-level testing Low-level test life cycle (planning, specification and execution)
White-box techniques Low-level test strategy
Test Process Maturity LevelsTPRO-23TEMA
AMinimum Fulfillment, low maturity level (1)
BMedium Fulfillment, average maturity level (2)
CGeneral Fulfillment, high maturity level (3)
DFull Fulfillment, maximum maturity level (4)
Test Process Maturity CategoriesTPRO-24TEMA
1-6 Controlled Test Process is planned and controlled
Test cases are specified, Test results are documented
Errors are recorded. Test progress is reported
7-10 Efficient Test automation, Data generation,
Result validation, Test documentation
11-13 Optimizing Control improvement
Tuning, Calibrating
First structure, then automate (Pol)Automating chaos leads to faster chaos (Graham)
Sample Test Process Maturity MatrixTPRO-25TEMA
Key Area 0 1 2 3 4 5 6 7 8 9 10 11 12 13
Controlled Efficient Optimizing
Test strategy A B C D
Life-cycle model A B
Moment of involvement A B C D
Estimating and planning A B
Test specification teschniques A B
Static test techniques A B
Metrics A B C D
Test Tools A B C
Test environment A B C
Office environment A
Commitment and motivation A B C
Test functions and training A B C
Scope of methodology A B C
Communication A B C
Reporting A B C D
Defect management A B C
Testware management A B C D
Test process management A B C
Evaluation A B
Low-level testing A B C
Scale
TPRO-26
Conclusions for Testing Information Systems
The development project should be accompanied by a
separate test project.
Both development and test should be based on the
requirements specification.
The budget for the test project should be equivalent to that
for the development project.
The test project should proceed methodologically from the
test design to the test execution and evaluation.
The test project results should be subject to a similar quality
assurance as the development results.
1
2
3
4
5
TEMA