![Page 1: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/1.jpg)
TERRAMIN AUSTRALIA LimitedTERRAMIN AUSTRALIA Limited
Angas Zinc Angas Zinc ProjectProject
![Page 2: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/2.jpg)
WaterWater
• Topics
– Water sources
– Outcomes
– Risk identification, management, control
– Mine water demand
– Modelling (groundwater)
– Monitoring
![Page 3: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/3.jpg)
MARP Outcome & CriteriaMARP Outcome & Criteria
• OutcomeOutcome– No adverse impact to the supply of water No adverse impact to the supply of water
to existing users and water dependent to existing users and water dependent ecosystemsecosystems
• CriteriaCriteria– Water to be measured for metals, flow, Water to be measured for metals, flow,
depth and organic content. All depth and organic content. All measurements are compared to baseline measurements are compared to baseline data.data.
![Page 4: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/4.jpg)
Management StrategyManagement Strategy
ZERO DISCHARGE POLICY
No contaminate water to leave site
All engineering design and placement of
infrastructure is set to achieve:
ZERO DISCHARGE
![Page 5: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/5.jpg)
Water SourcesWater Sources
Sources of water
– Rainfall
– Permanent surface water
– Ephemeral surface water
– Ground water
– Waste water
![Page 6: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/6.jpg)
Water sourcesWater sources
• Mine is Eastern Mount Lofty Ranges, part of the prescribed surface
water area and Murray River Catchment, adjacent to Angas-Bremer
prescribed wells area
• Waters in the location of the mine
– Burnside Creek (ephemeral)
– Angas River
– Aquifers: shallow and deep
– Surface water runoff (storm events)
– Flood plains (storm events)
– Council Sewage Treatment Ponds
![Page 7: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/7.jpg)
Catchments mapCatchments map
![Page 8: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/8.jpg)
Water usersWater users
Regional
• Users of Angas Catchment - surface & groundwater• Users of Lake Alexandrina water
Local
• Two current properties have shallow bores• Mains water• Waste water from Lagoons - Polo Club, Olive grove
![Page 9: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/9.jpg)
Management ActionsManagement Actions
• TSF - lined - Zero discharge• Water storages - lined dams - Zero discharge• Surface water management - clean/”dirty” separated -
designed for ARI 1:100• Waste water lagoons - low permeability rocks & thick
crown pillar• Underground & surface process water contained within
circuit.• Underground - no flow out to environment – draw-down
whilst pumping• If large flows encountered we would pressure grout the
walls
![Page 10: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/10.jpg)
Mine Mine water water
balancebalance
![Page 11: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/11.jpg)
Mine water balanceMine water balance
In (m³/h) Out (m³/h)
Fresh 8.4 Tailings moisture 13.4
Mine water ingress 7.2 Evaporation 0.2
Effluent 0.3
Water stores evaporation 0.3
Weighbridge 0.1
Concentrate moisture 1.3
Total in 15.6 Total out 15.6
![Page 12: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/12.jpg)
Mine water balanceMine water balance
• Mine will not discharge water Mine will not discharge water – The site is net water negative, with balance The site is net water negative, with balance
of requirements coming from potable of requirements coming from potable supply source (SA Water)supply source (SA Water)
– Looking at Reverse Osmosis to reduce SA Looking at Reverse Osmosis to reduce SA Water demandWater demand
![Page 13: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/13.jpg)
Effluent PondsEffluent Ponds
• Mine dewatering may intercept some Mine dewatering may intercept some infiltration of sewage ponds, adjacent infiltration of sewage ponds, adjacent to Tuckers Swampto Tuckers Swamp
• Management: required for high E.Coli Management: required for high E.Coli and faecal coliforms (measured) - and faecal coliforms (measured) - health risk health risk
• Current users of effluent – Polo club, Current users of effluent – Polo club, Olive groveOlive grove
![Page 14: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/14.jpg)
Groundwater modellingGroundwater modelling
• AWE: Rick AldamAWE: Rick Aldam– Principal Environmental ScientistPrincipal Environmental Scientist
• Groundwater draw down modellingGroundwater draw down modelling– To define any cone of depression of To define any cone of depression of
groundwater that is undergoing extractiongroundwater that is undergoing extraction
![Page 15: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/15.jpg)
Groundwater modellingGroundwater modellingdraw-downdraw-down
![Page 16: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/16.jpg)
2 Rain Water 2 Rain Water
circuitscircuits
1 circuit for water that 1 circuit for water that has contacted mining has contacted mining surfacessurfaces
1 circuit for 1 circuit for uncontaminated uncontaminated surface surface waterwater
![Page 17: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/17.jpg)
Surface Surface waterwatermonitoringmonitoring
![Page 18: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/18.jpg)
Ground Ground waterwatermonitoringmonitoring
(plus TSF – 9 bores)(plus TSF – 9 bores)
![Page 19: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/19.jpg)
Ambient water Ambient water typical levelstypical levels
Arsenic
0
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
AN 93 AN 43 AN 79 AN 40 AN 95 AN 47
Hole#
mg
/l
• Plot of metals in drill holesPlot of metals in drill holesZinc
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
AN 93 AN 43 AN 79 AN 40 AN 95 AN 47
Hole#
mg
/l
Lead
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
AN 93 AN 43 AN 79 AN 40 AN 95 AN 47
Hole#
mg
/l
Fluride
0
2
4
6
8
10
12
14
AN 93 AN 43 AN 79 AN 40 AN 95 AN 47
Hole#
mg
/l
![Page 20: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/20.jpg)
Ambient water Ambient water typical levelstypical levels
TDS
0
5000
10000
15000
20000
25000
AN 93 AN 43 AN 79 AN 40 AN 95 AN 47
Hole#
mg
/l
• Plot of TDS & pH in drill holesPlot of TDS & pH in drill holes
pH
0
1
2
3
4
5
6
7
8
9
10
AN 93 AN 43 AN 79 AN 40 AN 95 AN 47
Hole#
pH
![Page 21: TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.](https://reader035.fdocuments.net/reader035/viewer/2022062515/56649c3d5503460f948e63f8/html5/thumbnails/21.jpg)
Management TargetManagement Target
ZERO DISCHARGE POLICY
No contaminate water to leave site
All engineering design and placement of
infrastructure is set to achieve:
ZERO DISCHARGE