TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement...

24
TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities Infrastructure and Revitalization Plan Workshop April 20 th , 2007

Transcript of TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement...

Page 1: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Basin Environmental Improvement Project Commission

Coeur d’Alene River Basin Communities

Infrastructure and Revitalization Plan

Workshop

April 20th, 2007

Page 2: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• Section Overview– “Infrastructure”– What makes a “Project” for the IRP?– Process of identifying projects

Page 3: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Infrastructure

"the substructure or underlying foundation, especially the basic installations and facilities on which the continuance and growth of a community or state depends".

– Webster’s New World Dictionary

Page 4: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Silver Valley Infrastructure Systems

• Drinking Water Supply and Treatment

• Wastewater Collection, Treatment, Disposal

• Streets

• Stormwater Drainage

• Flooding

Page 5: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Silver Valley Infrastructure

• What we know– Infrastructure projects cost money– Infrastructure in the Silver Valley is old– Varying amounts of knowledge about

systems– Competing interests & priorities– Opportunities for alliances

Page 6: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Upper Basin Communities Infrastructure Value

Osburn, Silverton, Wallace, Mullan

Quantities Value

Sewer Mains 190,420 lf $14,300,000

Water Mains 44,760 lf $3,000,000

Streets 308,700 lf $30,870,000

Page 7: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Upper Basin Communities

• Asset Value/Replacement Cost

Pumping -$ Wastewater Treatment -$ Water Storage -$ Flood Control -$ Storm Drainage -$ Curb & Gutter -$ Total -$

Page 8: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Infrastructure Projects

Soft Costs& Projects

GreenInfrastructure

TraditionalInfrastructure

IRPProjects

Page 9: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Traditional Infrastructure

Page 10: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Green Infrastructure

• Streams, wetlands, etc.

Page 11: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Soft Costs & Projects

THIS IS THE GAP BETWEEN THE IRP & CONSTRUCTION

• Facilities Plans

• Condition Assessments

• Monitoring

• Surveying

• O&M Equipment, Training, Staff

Page 12: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Steps for Identifying IRP Projects• Starts with an inventory of what you have

– Baseline Maps

• Capture your knowledge of the systems

• Incorporate typical & industry data

• Determine what you do not know

• Identify what you want

Page 13: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• The easy ones

Page 14: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• Ones in question

Page 15: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• Ones you found and proved

Page 16: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• Ones you deal with all the time

Page 17: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• More difficult ones

Page 18: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

Take Away Points:

• We need your help to identify the projects & understand needs

• Think beyond “traditional” and “quick-fix”

Page 19: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

• How to do it– Communicate– Identify Projects– Prioritize– Build support– Invest in critical projects

Developing Projects

Page 20: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

Page 21: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

Considerations Unique to the IRP

• The IRP crosses political and geographic boundaries

• The IRP includes multiple types of infrastructure

• Priorities change

Page 22: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

Steps

• Define Common Goals

• Develop criteria to evaluate projects against the goals

• Rate, weight, rank projects

Page 23: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

• Examples of Goals“Protect existing investment”

“Provide expected level of service to customers”

“Comply regulations and avoid fines”

“Safeguard the environment”

“Protect remedy”

Page 24: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

BREAK OUT SESSION

Goals