TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto...

38
TERMINAL METROBUS ECATEPEC Contacto: N° de encargo: Empresa: N° de cliente: Fecha: 13.07.2009 Proyecto elaborado por: ALEJANDRO HIGAREDA R.

Transcript of TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto...

Page 1: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC

Contacto: N° de encargo: Empresa: N° de cliente:

Fecha: 13.07.2009Proyecto elaborado por: ALEJANDRO HIGAREDA R.

Page 2: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

Índice

TERMINAL METROBUS ECATEPECPortada del proyecto 1Índice 2Lista de luminarias 3GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** ...

Hoja de datos de luminarias 4PF-1000 POWERFLOOD

Tabla de intensidades lumínicas 5Hoja de datos LVK 8Hoja de datos Deslumbramiento 9

Escena exterior 1Datos de planificación 10Luminarias (ubicación) 11Rendering (procesado) en 3D 12Rendering (procesado) de colores falsos 13Superficies exteriores

Superficie de cálculoIsolíneas (E, vertical) 14Gama de grises (E, vertical) 15

DIALux 4.7 by DIAL GmbH Página 2

Page 3: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

TERMINAL METROBUS ECATEPEC / Lista de luminarias

32 Pieza GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOODN° de artículo: PF1K01S***6X2**Flujo luminoso de las luminarias: 140000 lmPotencia de las luminarias: 1104.0 WClasificación luminarias según CIE: 100Código CIE Flux: 75 94 100 100 79Armamento: 1 x 1; 1000W HPS, CLEAR E25, HORZ (Factor de corrección 1.000).

Dispone de una imagen de la luminaria en

nuestro catálogo de luminarias.

DIALux 4.7 by DIAL GmbH Página 3

Page 4: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD / Hoja de datos de luminarias

Dispone de una imagen de la luminaria en nuestro catálogo de luminarias.

Emisión de luz 1:

800

1200

1600

2000

2400

cd/klm 76%C0 - C180 C90 - C270

0° 15° 30°

45°

60°

75°

90°

105°105°

90°

75°

60°

45°

30° 15° 0°

Clasificación luminarias según CIE: 100Código CIE Flux: 75 94 100 100 79

Para esta luminaria no puede presentarse ninguna tabla UGR porque carece de atributos de simetría.

DIALux 4.7 by DIAL GmbH Página 4

Page 5: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD / Tabla de intensidades lumínicas

Luminaria: GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOODLámparas: 1 x 1; 1000W HPS, CLEAR E25, HORZ

Gamma C 0° C 15° C 30° C 45° C 60° C 75° C 90° C 105° C 120° C 135°0.0° 2270 2270 2270 2270 2270 2270 2270 2270 2270 2270

5.0° 598 654 819 1078 1469 1983 2273 1926 1557 1188

10.0° 240 245 270 331 581 1366 2182 1463 581 306

15.0° 171 177 189 218 300 870 2091 943 281 207

20.0° 167 165 164 174 217 518 1936 512 208 183

25.0° 159 157 157 158 180 333 1781 312 183 168

30.0° 158 155 152 149 156 238 1523 226 166 159

35.0° 157 153 148 142 140 185 1265 181 150 151

40.0° 108 114 136 128 127 148 914 147 137 135

45.0° 59 67 92 92 102 113 562 117 111 96

50.0° 67 64 58 60 67 85 351 89 71 63

55.0° 75 72 67 52 39 60 139 63 42 58

60.0° 63 58 67 56 40 33 92 35 47 66

65.0° 50 39 41 49 35 23 45 26 45 60

70.0° 25 20 20 20 15 19 27 22 21 28

75.0° 0.00 1.74 5.57 4.86 4.12 6.22 9.00 7.50 5.60 9.04

80.0° 0.00 0.00 0.00 0.00 0.57 0.55 4.50 1.37 0.57 0.00

85.0° 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

90.0° 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Valores en cd/klm

DIALux 4.7 by DIAL GmbH Página 5

Page 6: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD / Tabla de intensidades lumínicas

Luminaria: GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOODLámparas: 1 x 1; 1000W HPS, CLEAR E25, HORZ

Gamma C 150° C 165° C 180° C 195° C 210° C 225° C 240° C 255° C 270° C 285°0.0° 2270 2270 2270 2270 2270 2270 2270 2270 2270 2270

5.0° 871 670 603 670 871 1188 1557 1926 2273 1983

10.0° 251 229 224 229 251 306 581 1463 2182 1366

15.0° 194 187 187 187 194 207 281 943 2091 870

20.0° 173 174 172 174 173 183 208 512 1936 518

25.0° 167 170 171 170 167 168 183 312 1781 333

30.0° 162 166 168 166 162 159 166 226 1523 238

35.0° 158 162 164 162 158 151 150 181 1265 185

40.0° 144 119 111 119 144 135 137 147 914 148

45.0° 96 67 57 67 96 96 111 117 562 113

50.0° 59 65 67 65 59 63 71 89 351 85

55.0° 69 75 77 75 69 58 42 63 139 60

60.0° 71 65 71 65 71 66 47 35 92 33

65.0° 45 50 64 50 45 60 45 26 45 23

70.0° 22 27 32 27 22 28 21 22 27 19

75.0° 5.98 4.19 0.00 4.19 5.98 9.04 5.60 7.50 9.00 6.22

80.0° 0.00 1.07 0.00 1.07 0.00 0.00 0.57 1.37 4.50 0.55

85.0° 0.00 0.04 0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00

90.0° 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Valores en cd/klm

DIALux 4.7 by DIAL GmbH Página 6

Page 7: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD / Tabla de intensidades lumínicas

Luminaria: GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOODLámparas: 1 x 1; 1000W HPS, CLEAR E25, HORZ

Gamma C 300° C 315° C 330° C 345° C 360°0.0° 2270 2270 2270 2270 2270

5.0° 1469 1078 819 654 598

10.0° 581 331 270 245 240

15.0° 300 218 189 177 171

20.0° 217 174 164 165 167

25.0° 180 158 157 157 159

30.0° 156 149 152 155 158

35.0° 140 142 148 153 157

40.0° 127 128 136 114 108

45.0° 102 92 92 67 59

50.0° 67 60 58 64 67

55.0° 39 52 67 72 75

60.0° 40 56 67 58 63

65.0° 35 49 41 39 50

70.0° 15 20 20 20 25

75.0° 4.12 4.86 5.57 1.74 0.00

80.0° 0.57 0.00 0.00 0.00 0.00

85.0° 0.00 0.00 0.00 0.00 0.00

90.0° 0.00 0.00 0.00 0.00 0.00

Valores en cd/klm

DIALux 4.7 by DIAL GmbH Página 7

Page 8: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD / Hoja de datos LVK

Luminaria: GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD

Lámparas: 1 x 1; 1000W HPS, CLEAR E25, HORZ

800

1200

1600

2000

2400

cd/klm 76%C0 - C180 C90 - C270

0° 15° 30°

45°

60°

75°

90°

105°105°

90°

75°

60°

45°

30° 15° 0°

400

800

1200

1600

2000

2400

400

800

1200

1600

2000

2400

cd/klm 76%C0 - C180 C90 - C270

90.0° 67.5° 45.0° 22.5° 0.0° 22.5° 45.0° 67.5° 90.0°

DIALux 4.7 by DIAL GmbH Página 8

Page 9: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD / Hoja de datos Deslumbramiento

Luminaria: GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD

Lámparas: 1 x 1; 1000W HPS, CLEAR E25, HORZ

Para esta luminaria no puede presentarse ninguna tabla UGR porque carece de atributos de simetría.

80000

160000

200000

240000

g = 55.0° g = 65.0° g = 75.0°cd/m²

C0 C45

C90

C135C180C225

C270

C315

DIALux 4.7 by DIAL GmbH Página 9

Page 10: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

Escena exterior 1 / Datos de planificación

11111

111

11111

111

11111

111

11111

111

205.66 m-189.58

157.41 m

-178.99

Factor mantenimiento: 0.80, ULR (Upward Light Ratio): 5.5% Escala 1:3119

Lista de piezas - Luminarias

N° Pieza Designación (Factor de corrección) [lm] P [W]

1 32 GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD (1.000) 140000 1104.0

Total: 4480000 35328.0

DIALux 4.7 by DIAL GmbH Página 10

Page 11: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

Escena exterior 1 / Luminarias (ubicación)

11111

111

11111

111

11111

111

11111

111

205.66 m-189.58 -103.39 -1.17 76.79 140.83

157.41 m

-178.99

-84.84-74.49

10.2220.57

71.8782.22

111.25121.60

Escala 1 : 2826

Lista de piezas - Luminarias

N° Pieza Designación

1 32 GE C&I, LIGHTING SYSTEMS - EAST FLAT ROCK, NC, USA PF1K01S***6X2** PF-1000 POWERFLOOD

DIALux 4.7 by DIAL GmbH Página 11

Page 12: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

Escena exterior 1 / Rendering (procesado) en 3D

DIALux 4.7 by DIAL GmbH Página 12

Page 13: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

Escena exterior 1 / Rendering (procesado) de colores falsos

0 10 20 30 40 50 70 100 200 lx

DIALux 4.7 by DIAL GmbH Página 13

Page 14: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

Escena exterior 1 / Superficie de cálculo / Isolíneas (E, vertical)

90

90

90

90

90

90 90

90

90

90

90

90

90

90

9090

90

361.83 m0.00 19.79 48.16 91.89 115.89 146.30 174.51 206.01 233.70 261.92 292.49 327.38

332.12 m

0.00

29.92

71.61

97.61

115.36125.49

139.46148.93158.15167.90178.02189.73198.91208.17221.20231.67242.06251.95261.46270.72279.91289.15299.47

318.00

Valores en Lux, Escala 1 : 2597Situación de la superficie en la escena exterior:Punto marcado:(135.257 m, -145.909 m, 1.176 m)

Trama: 128 x 128 Puntos

Em [lx] Emin [lx] Emax [lx] Emin / Em Emin / Emax19 0.00 448 0.000 0.000

Rotación: 0.0°

DIALux 4.7 by DIAL GmbH Página 14

Page 15: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

TERMINAL METROBUS ECATEPEC13.07.2009

Proyecto elaborado por ALEJANDRO HIGAREDA R.Teléfono

Faxe-Mail [email protected]

Escena exterior 1 / Superficie de cálculo / Gama de grises (E, vertical)

90 180 270 360 lx

361.83 m0.00 48.16 91.89 117.61 147.67 178.42 209.42 239.99 292.49 327.38

332.12 m

0.00

29.92

71.61

97.61

115.36125.49139.46149.92161.43171.55

189.73199.85213.83223.97234.27244.43255.70265.72276.82287.12297.28

318.00

Escala 1 : 2817Situación de la superficie en la escena exterior:Punto marcado:(135.257 m, -145.909 m, 1.176 m)

Trama: 128 x 128 Puntos

Em [lx] Emin [lx] Emax [lx] Emin / Em Emin / Emax19 0.00 448 0.000 0.000

Rotación: 0.0°

DIALux 4.7 by DIAL GmbH Página 15

Page 16: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

F-12/2008

GE Lighting Systems, Inc. www.gelightingsystems.com

APPLICATIONS• Parking lots, industrial yards and sports stadiums• Construction sites, high mast roadway interchanges, car lots and airport aprons

ORDERING NUMBER LOGICPF1KPRODUCT IDENTXXXX

SLIGHT SOURCE

X

DBCOLOR

XX

0VOLTAGE

X

SOPTIONS

XXXPF1K = PF-1000

Powrflood Floodlight

S = HPSM = MHStandard: Lamp not included.

DB = Dark Bronze (Standard)

GR = Gray

60Hz0 = 120/208/

240/277 Multivolt

1 = 120**2 = 2083 = 2404 = 2775 = 480D = 347F = 120X347*T = 220

50Hz6 = 220R = 230Y = 240

*Connected for 120V**120V 1000MH A-Reg not CSA or CUL

F = Fusing (Not avail-able with multivolt or 120X347V)

J = *Line Surge Protec-tor, Expulsion Type

K = Knuckle slipfitter for 1.9-2.38 inch (48-60mm) OD Tenon

L = Latch for doorP = Prewired with 6 ft

(2M) #14/3S = Knuckle Slipfitter for

1.9-3.0 in. (48-76mm) OD Tenon

V = Knuckle Wall mount

* Not available with multivolt (1000W HPS only)

01WATTAGE

XX75 = 75001 = 1000

•        /   1598 Listed Suitable For Wet Locations•  Heavy-duty (NEMA) die-cast housing•  Total front access via hinged and      removable  door•  Enclosed, gasketed and sealed, and activated    -   charcoal filtered optical assembly•  Heavy-gauge galvanized steel trunnion•  Corrosion resistant hardware

•  Sight track for daytime aiming•  Aiming degree indicator•  NEMA lamp/wattage decal•  Mogul base socket – E39 standard•  Internal glare shield with cutoff optic      performance (HPS only) – see Accessories•  Vertical and horizontal lamp orientations•  Terminal board•  Heat & shock resistant tempered glass lens

SPECIFICATION FEATURES

PF-1000 POWERFLOOD ® FLOODLIGHT

ABALLAST TYPEXSee Ballast and Photometric Selection Table

A = Autoreg

6X2 NEMA TYPE BEAM SPREAD HORIZ X VERT XXXSee Ballast and Photometric Selection Table.6X2 = 6X26X3 = 6X36X5 = 6X56X6 = 6X66X7 = 6X77X7 = 7X77X6 = 7X6(Vertical lamp)

1PE FUNCTIONX1 = None2 = PE Receptacle

NOTE:Receptacle con-nected same volt-age as unit.

Order PE Control separately.

Page 17: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

2008/F-13

GE Lighting Systems, Inc. www.gelightingsystems.com

REFERENCES See Page F-32 for start of Accessories. See Pages F-46 for Component Ordering Logic. See Pages F-47 for Explanation of Options and Other Terms Used. See Pole and Bracket Section Page P-2 for pole selection.

DATAApproximate Net Weight lbs kgs 750 watt 55-61 21-23 1000 watt 61-65 23-24

Effective Projected Area 3.0 sq ft max .279 sq M maxSuggested Mounting Height 20-150 ft 7-50 M

PF-1000 POWERFLOOD ® FLOODLIGHT

FIXTURE DIMENSIONS

All light sources are clear unless otherwise indicated.BALLAST AND PHOTOMETRIC SELECTION TABLE

NEMA Type Photometric Curve Light Ballast Type Beam Spread Number Wattage Source All Voltages† Horiz X Vert (Degrees) 35-17 - - - -

750  HPS  A** 6X5 (102X78)  9537 750  HPS  A** 6X6 (127X108) vertical lamp 9867  vertical lamp750  HPS  A** 7X7 (132X143)  86811000  HPS  A 6X2 (106X20)  77491000  HPS  A 6X3 (108X37)  77481000  HPS  A 6X5 (109X81)  7799 1000  HPS  A 7X6 (133X117) vertical lamp 9857  vertical lamp1000  HPS  A 7X7 (135X145)  77461000  MH  A 7X7 (139X139)  9497 A 7X6 (135X112) vertical lamp 9499  vertical lamp A 6X5 (121X98)  9498**Multivolt not available.  †220V, 60Hz and all 50Hz voltages available 1000 Watt Autoreg only.

TRUNNION MOUNTED (Standard)

SLIPFITTER MOUNTED (Options K and S)

KNuCKLE WALL MOUNTED (Option V)

Page 18: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

GE Lighting Systems, Inc.g FLOOD LIGHTING

Guide Form Specifications – 2002 Page 1www.gelightingsystems.com

GUIDE FORM SPECIFICATIONS

GENERAL DESCRIPTIONThe NEMA heavy-duty weather-resistant floodlight designated_____ (identify) shall be a GE PF-1000 POWERFLOOD®

floodlight, ordering number _____ (specify PF1K, plus orderingnumber logic from catalog) or approved equal, for operation ofone _____ (specify [750 or 1000] watt high pressure sodium[HPS] or 1000 watt metal halide) lamp from a nominal _____(specify [120, 208, 240, 277, 347 or 480 volt, 60 Hertz] or for1000 watt lamps only, 220 volt, 60 Hz or 220, 230 or 240 volt 50Hz]) power source and shall be capable of starting and operat-ing the specified lamp within the limits specified by the lampmanufacturer. The floodlight shall contain a completelyprewired integral ballast, optical assembly with _____ (specify6X2, 6X3, 6X5, 7X7 or 7X6 according to photometric selectiontable in the catalog) NEMA type beam spread (horizontal Xvertical), and optional, internal louver accessory. The flood-light shall have a NEMA lamp identification decal. The flood-light shall beUL/cUL1598 Listed SUITABLE FOR WET LOCATIONS.Standard construction is IP55. Ballast, housing, optical andluminaire assembly shall all be from the same manufacturer.

OPTICAL ASSEMBLY

✝ Proprietary term of Aluminum Company of America® Registered Trademark of General Electric CompanyData subject to change without notice

PF-1000 POWERFLOOD ® FLOODLIGHT

The optical assembly shall be sealed and have an activated-charcoal filter to eliminate particulate matter and gaseouscontaminants. The optical assembly shall include a formedaluminum parabolic reflector and heat/impact-resistant flatdoor glass and an E39 mogul base socket with superior lampgripping. The socket shall have added insulation, giving it theability to handle the higher pulse ratings of newer HID sys-tems. The reflector shall have a chemically-bonded light-weight nonbreakable glass ALGLAS® finish on all surfaces,providing improved specular reflectance, corrosion resistance,durability and ease of cleaning. The optical assembly withhorizontally mounted lamp shall provide precise vertical beamcontrol.

MECHANICAL CONSTRUCTION

The floodlight shall include a two-piece die-cast aluminumhousing with hinged, removable and gasketed front housingand captive screws for relamping access, integral ballast,optical assembly with provisions for vertically or horizontallymounted lamp, _____ (specify heavy-gauge steel trunnion[standard], integral die-cast aluminum knuckle slipfitter orwall mount adapter with integral wiring box and verticalaiming degree markings), tempered heat-resistant door glass(and optional prewired photoelectric control receptacle). Allhardware shall be corrosion-resistant. All die-cast aluminumsurfaces shall have an electrocoat _____ (specify dark bronze[standard] or gray) paint finish on all sides. The floodlightshall have adjustable aiming stops and built-in rifle sight fordaytime aiming.

BALLAST OPERATION

The ballast shall be mounted on the back housing and shallbe prewired to the lamp socket, terminal board and ignitor.The floodlight shall contain a _____ (specify standard Autoregtype ballast* in full compliance with lamp-ballast specifica-tions available to the fixture manufacturer from the lampmanufacturers at the time of fixture manufacture.The ballast shall reliably start and operate the lamp in ambi-ent temperatures down to -20oF for mercury or metal halide or-40oF for HPS.

GLARE CONTROL ACCESSORY

The optical assembly shall contain a removable, three-bladedglare control louver assembly (ordered separately as and acces-sory - HPS only) capable of cutting off direct view to the lampat 18o above beam center line. Direct view of arc images (in thereflector) is cut off at 52o above beam center. Viewable surfacesshall have a matte duranodic finish,optical surfaces are semi-specular.

* REFER TO PRODUCT PAGE FOR OTHER BALLAST SE-LECTIONS. FOR MORE DEFINITIVE INFORMATION, RE-FER TO BALLAST SPECIFICATIONS IN TECHNICALDATA SECTION.

Page 19: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

GEH-5758C

GE Lighting Systems, Inc.Hendersonville, NC 28793

PF-1000TM Powerflood ® FloodlightINSTRUCTIONS

TM Trademark of General Electric Company® Registered Trademark of General Electric Company

Trunnion Mounted Pipe Mounted Wall Mounted

GENERALThis luminaire is designed for outdoor lighting service,

and should not be used in areas of limited ventilation, or inhigh ambient temperature enclosures; best results will beobtained if installed and maintained according to thefollowing recommendations.

UNPACKINGThis luminaire has been properly packed so that no parts

should have been damaged during transit. Inspect toconfirm.

INSTALLATION

For aimed-up applications, remove two screwsfrom rear bottom corners of back housing, and re-install in front housing bottom corners.

This floodlight is provided with either trunnionmounting, pipe mounting, or wall mounting means.

1. Trunnion Mounted Units: Trunnion bracket mountsdirectly on flat surface. Mounting adapters available forinstallation on poles, crossarms, pipes, etc. The trunnionbracket has a clearance hole of a 3/4-inch bolt used forattachment to such mountings. Tighten side trunnionbolts to 50 - 55 foot pounds.

2. Pipe Mounted Units: Slipfitter to fit 2-3/8 through3 inch OD pipe is available. Three (3) set screws are usedto clamp the floodlight securely to the pipe. Nuts tightenagainst the cast slipfitter. Tighten set screws to 18 - 22 footpounds.

3. Wall Mounted Units: Wall mounting plate is providedwith four (4) 0.438-inch clearance holes spaced4.375(H)x2.875(V) inches for mounting.

B. WIRING:Make all electrical connections in accordance withthe National Electrical Code and any applicablelocal code requirements.

Verify that supply voltage is correct by comparingit to nameplate.

Do not remove insulated connectors from wiresnot needed for required voltage connection.

Connect ground lead to the green lead, greenground screw on housing or terminal blockprovided.

Replace power fuses only with fuses of the sametype and ratings.

READ THOROUGHLY BEFORE INSTALLING

A. MOUNTING:NOTE: In no case may ballast be located aboveoptical. To mount trunnion from overhead struc-tures swing trunnion above unit as shown above.

WARNINGRisk of burn• Do not touch operating luminaire

CAUTIONUnit will fall if not installed properly• Follow installation instructions

WARNINGRisk of electric shock• Turn power off before servicing

– see instructions

These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connectionwith installation, operation or maintenance. Should further information be desired or should particular problems arise which are not covered sufficientlyfor the purchaser’s purposes, the matter should be referred to the General Electric Company.

g

Page 20: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

WIRINGIF SINGLE VOLTAGE:All single voltage ballasts are pre-wired such thatuser need only connect the supply conductors.IF MULTIVOLT: (120/208/240/277 volts)Connect the ballast lead with the insulated termi-nal to the desired voltage terminal as indicated onthe ballast terminal nameplate.IF MULTIWATT:Multiwatt ballasts are available in various combi-nations of wattage. See wiring instructions onwiring tag inside the luminaire.

Reposition protective insulation shield, if present.Close and secure door, taking care not to pinch any

leads.

TRUNNION MOUNTED UNITS: NOTE: Cable strain relief and sealing areprovided by the compression plate and rubberbushing supplied for 9/16-inch O.D. cable. Threeconductor, AWG No. 14, 105°C minimum cableis required.

(See Figure 1)1. Open door by loosening two door screws or latches.2. Remove protective insulation shields, if present.3. Insert cable through compression plate and rubber

bushing and secure by tightening screw.4. Make electrical connections.5. Re-install protective shields, if present.

PIPE AND WALL MOUNTED UNITS:Open wiring compartment cover located on the

mounting bracket. Make electrical connections and closewiring compartment cover.

NOTE: For multivolt units refer to "BallastConnections on Multivolt Units".

NOTE: Pipe and wall mounted multivolt unitsrequire the luminaire housing to be opened tomake the correct voltage connections.

UNITS WITH EXTERNAL SUPPLY CORD:Make electrical connections to supply cable.

NOTE: Multivolt units with the external supplycord require the luminaire housing to be openedto make the correct voltage connections.

C. PHOTOELECTRIC CONTROL:Photoelectric control receptacle (if present) should be

oriented before control is installed. Loosen the twoholding screws and rotate receptacle until 'North' isdirected as near as possible to true North. Tightenholding screws and install control.

D. AIMING:Center target in sighting hole located on top of fixture.

(See figure 2). Mounting includes a degree scale whichpermits setting floodlight to any predetermined verticalangle.

CAUTIONRisk of burn• Allow lamp/fixture to cool before

handling

35-201578-W3 (1/00) GELS

Install cut-off internal louver as shown in figure 3.Press-fit louver into reflector and secure flanges with clipsprovided. Louver is designed for usage with HPS lampsonly (maximum E-25 bulb diameter). Remove louver forrelamping.

MAINTENANCE

Figure 1

A. CLEANING:It will occasionally be necessary to clean outside of door

glass to maintain light level. Frequency of cleaning willdepend on ambient dirt level and minimum light levelwhich is acceptable. Door glass should be washed in asolution of warm water and any mild, nonabrasive house-hold detergent, rinsed with clean water and wiped dry.Should optical assembly become dirty, wipe reflector andclean door glass in above manner.

NOTE: Door removed by removing hinge pins.

B: LAMP REPLACEMENT:The light output of a luminaire is also dependent on

age of lamp. In applications where light level is critical itmay be desirable to replace lamps before they burn out.Lamp manufacturer can provide data showing how lamplight output decreases with use.

Use only lamps specified on nameplate. Observelamp manufacturer’s recommendations andrestrictions on lamp operation, particularly ballasttype, burning position, etc.

LAMP TIGHTNESS: The lamp should be securelyinserted to NEMA-EEI specified torque of 35 inch-pounds, which is best achieved by very firmly tighteningto insure application of sufficient torque. Tighteningmust be sufficient to fully depress and load center contactof socket.

After tightening lamp, lamp end support should belatched with a twisting motion.

GE Lighting Systems, Inc.3010 Spartanburg HighwayHendersonville, NC 28793(828) 693-2000

Figure 3Internal Louver Option

Figure 2

Page 21: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

ILLUSTRATIONSSHOWN ARE TYPICAL

REPRESENTATIONS

PF1K

RENEWAL PARTS

PF-1000 POWERFLOOD® FLOODLIGHT

PF-1000 POWERFLOOD® FLOODLIGHT

www.gelightingsystems.com

gGE Lighting Systems, Inc.

™ Trademark of General Electric Company® Registered Trademark of General Electric CompanyData subject to change without notice

ORDERING INFORMATION FOR GE LIGHTING SYSTEMS RENEWAL PARTSREF. NO. DESCRIPTION CATALOG NUMBER

1 PE Receptacle with leads 35-964960-552 Glass Lens and Gaskets 35-963560-013 Socket mogul base w/leads & gasket 35-964640-514 Ignitor – 400 watt and below 35-964710-514 Ignitor – 750 watt 35-216710R034 Ignitor – 1000 watt 35-216700R135 Capacitor(s):

Secure old catalog number from existing part.Use cross reference for new catalog number.

6 Ballast Replacement Kit See Back Page7 3 position Terminal Board (not shown) 35-962490-MM8 Trunnion - Gray 35-963560-028 Trunnion - Bronze 35-963560-039 Knuckle Slipfitter, top part w/bolt-Gray 35-963280-239 Knuckle Slipfitter, top part w/bolt-Bronze 35-963280-2410 Knuckle Slipfitter, lower part - Gray for 1.9 - 3.0 inch OD tenon 35-963280-2510 Knuckle Slipfitter, lower part - Dark Bronze for 1.9 - 3.0 inch OD tenon 35-963280-2611 Knuckle Slipfitter, lower part - Gray for wall mounting 35-963280-2711 Knuckle Slipfitter, lower part - Dark Bronze for wall mounting 35-963280-2812 Lamp Support, 1000 Watt HPS only 35-311571R0113 Reflector and Socket assembly for 1000W HPS 6X5 35-963280-1413 Reflector and Socket assembly for 1000W HPS 6X3 35-963280-1613 Reflector and Socket assembly for 1000W MH 6X5 35-963560-0513 Reflector and Socket assembly for 1000W MH 7X7 35-963560-0413 Vertical Reflector and Socket assembly for 1000W MH 7X6 (not shown) 35-963560-1013 Vertical Reflector and Socket assembly for 1000W HPS 7X6 (not shown) 35-963560-1114 Back Housing for Slipfitter - Dark Bronze 35-963560-0914 Back Housing - Gray 35-963560-1515 Front Housing Assembly - Gray 35-963560-0615 Front Housing Assembly - Dark Bronze 35-963560-08

Continued on back page

Page 22: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

PF1K

RENEWAL PARTS

PF-1000 POWERFLOOD® FLOODLIGHT

PO Box 4506 Hendersonville, NC 28793www.gelightingsystems.com(828) 693-2000 (828) 693-2570 FAX

gGE Lighting Systems, Inc.

™ Trademark of General Electric Company® Registered Trademark of General Electric CompanyData subject to change without notice

BALLAST REPLACEMENT PARTSWATTAGE VOLTAGE BALLAST TYPE CATALOG NUMBERHIGH PRESSURE SODIUM (HPS)

250 120/208/240/277 Autoreg 35-963280-18250 480 Autoreg 35-963280-19400 120/208/240/277 Autoreg 35-963280-06400 480 Autoreg 35-963280-07750 120/208/240/277 HPF-Lag 35-963280-13750 480 Autoreg 35-963280-201000 120/208/240/277 Autoreg 35-963280-111000 480 Autoreg 35-963280-21

METAL HALIDE AND MERCURY400 120/208/240/277 Autoreg 35-963280-02400 480 Autoreg 35-963280-031000 120/208/240/277 Autoreg 35-963280-041000 480 Autoreg 35-963280-05

PF-1000 POWERFLOOD® FLOODLIGHT

Page 23: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 24: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 25: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 26: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 27: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 28: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 29: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 30: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 31: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 32: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 33: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 34: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 35: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 36: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE
Page 37: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

NOTAS Y ACLARACIONES:

a.- La distancia entre los postes será de 100 a 110 metros entre sí.

b.- La altura de los postes será de de 20 metros a la corona, de tal forma que las luminarias se encuentren a 20 metros del nivel del piso terminado.

c.- Verificar con el contratista la mecánica de suelos para la fabricación de las bases.

d.- Verificar con el contratista el cálculo de esfuerzos mecánicos (viento, sismos, etc) para los postes de 20 metros de altura.

e.- Los luminarios deberán ser colocados con una inclinación hacia abajo de 45º con respecto a la horizontal y ser dirigidos sobre X y Z a los puntos de mas difícil iluminación.

f.- El presente cálculo de iluminación contempla como superficie de cálculo el piso terminado (yerba, asfalto, concreto) de la estación terminal.

g.- La ubicación de los postes deberá ser verificada con la gerencia y coordinación de la obra.

h.- Para el presente cálculo de iluminación se contemplan las luminarias con un mantenimiento de por lo menos 4 veces al año.

i.- Es responsabilidad del contratista verificar los niveles de iluminación alcanzados una vez terminada la colocación y conexión de los postes y luminarios.

j.- El presente cálculo de iluminación se efectuó con el software DIALUX V 4.7.

k.- El presente cálculo de iluminación se realizó de acuerdo a la NORMA Oficial Mexicana NOM-013-ENER-2004, Eficiencia energética para sistemas de alumbrado en vialidades y áreas exteriores públicas.

l.- Las imágenes que acompañan el presente cálculo de iluminación son representativas del concepto de “superpostes”.

m.- En el presente cálculo no se toman en cuenta ninguna de las contribuciones de iluminación efectuadas por, reflejos, alumbrado público, alumbrado producido por los faros de vehículos, reflectancias de los materiales, iluminación natural ni ningún otro.

n.- El presente cálculo de iluminación fue realizado con un programa de computadora que no toma en consideración condiciones como smog, viento, nubes, pájaros, etc. Por lo que la depreciación de los luminarios del 80% puede variar.

o.- Una de las consideraciones principales del presente cálculo fue la iluminación uniforme del área en cuestión sin considerar (por lo poco uniforme del lugar) las rampas, andenes, pasos peatonales, áreas jardinadas, etc. Por lo que el cálculo tiene un promedio de 50-70 luxes generales.

Page 38: TERMINAL METROBUS ECATEPEC - Terranovis de... · TERMINAL METROBUS ECATEPEC 13.07.2009 Proyecto elaborado por ALEJANDRO HIGAREDA R. Teléfono Fax e-Mail alejandro@terranovis.com GE

DOCUMENTOS QUE CONFORMAN EL PRESENTE CÁLCULO DE ILUMINACIÓN

1. Cálculo de iluminación (reporte DIALUX).

2. Archivo fotométrico de la luminaria utilizada en el cálculo.

3. Archivo fotográfico sobre las luminarias utilizadas y detalles de los superpostes.

4. NOM- 013-ENER-2004.pdf

5. NIVELES DE ILUMINACION EN MEXICO.pdf

6. Corona, Motor y mecanismo para los superpostes.

7. Notas complementarias al cálculo de iluminación.