TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
No Projects Under Development in Anderson CountyANDERSON COUNTY I-75
INSTALL ITS INSTRUMENTATION AND COMMUNICATIONS ON I-75 AT SR 61 (ANDERSONVILLE HWY., EXIT 122) INTERCHANGE (IA)
Length - 0.6 (Intelligent Transportation System)This project is in the early stages of development.
PIN: 121653.00
ANDERSON COUNTY SR-9 US-25W
BRIDGE OVER BULL RUN CREEK, LM 16.10 (IA)Length - 0.1 (Bridge Replacement)The engineering is underway.
PIN: 124128.00
ANDERSON COUNTY SR-61
BRIDGE OVER BRUSHY CREEK, LM 3.98 (IA)Length - 0.0 (Bridge Replacement)The engineering is underway.
PIN: 124125.00
ANDERSON COUNTY SR-170
FROM SR-62 (OAK RIDGE HIGHWAY) TO SR-9 (US-25W, CLINTON HIGHWAY) (IA)Length - 6.2 (Location and Environmental Study)The engineering is underway.
PIN: 124121.00
ANDERSON COUNTY SR-170
FROM SR-62 (OAK RIDGE HIGHWAY) TO NEAR MELTON LAKE ROAD (IA)Length - 2.6 (Reconstruction)The engineering is underway.
PIN: 124121.01
ANDERSON COUNTY SR-170
FROM NEAR MELTON LAKE ROAD. TO SR-9 (US-25W, CLINTON HIGHWAY) (IA)Length - 3.6 (Reconstruction)The engineering is underway.
PIN: 124121.02
ANDERSON COUNTY
VARIOUS LOCAL ROADS IN ANDERSON COUNTY (LOCAL ROADS SAFETY INITIATIVE)(Miscellaneous Safety Improvements)The environmental studies are complete.
PIN: 125450.04
Page: 1
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
ANDERSON COUNTY SIA
STATE INDUSTRIAL ACCESS SERVING NORRIS INDUSTRIAL PARK(Construction-New)The engineering is underway.
PIN: 128962.00
KNOX - ANDERSON COUNTIES I-75
FROM NEAR MM 109.6 TO NEAR SR-61 (EXIT 122) (IA)Length - 13.0 (Intelligent Transportation System)This project is in the early stages of development.
PIN: 124453.00
Page: 2
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
No Projects Under Construction in Anderson CountyANDERSON COUNTY SR-61 FROM NEAR BUFFALO ROAD TO NEAR SR-71 (RESURFACE & SAFETY) LENGTH - 2.280
CONTRACT NO.: CNT043LET TO CONTRACT: 2/8/2019CONTRACTOR: ROGERS GROUP, INC.BID PRICE : $1,048,358.99EST. COMPLETION DATE: APRIL, 2020
PIN: 127823.00
ANDERSON - CAMPBELL COUNTIES SR-71 US-441FROM NEAR ANDERSON/CAMPBELL COUNTY LINE TO SR-9 IN ANDERSON COUNTY (RESURFACE &
SAFETY) LENGTH - 5.100
CONTRACT NO.: CNT118LET TO CONTRACT: 3/29/2019CONTRACTOR: POTTER SOUTH EAST LLCBID PRICE : $553,802.75EST. COMPLETION DATE: APRIL, 2020
PIN: 127833.00
ANDERSON COUNTY I-75 BRIDGES OVER CLINCH RIVER, LM 8.28 (BRIDGE REPAIR) LENGTH - 0.010
CONTRACT NO.: CNU913LET TO CONTRACT: 3/27/2020CONTRACTOR: TWIN K CONSTRUCTION, INC.BID PRICE : $583,253.97EST. COMPLETION DATE: NOVEMBER, 2020
PIN: 124964.00
ANDERSON COUNTY SR-116 FROM NEAR SR-330 TO NEAR SR-9 (EXCLUDING LM 19.25 - 19.42) (RESURF, SAFETY & BR REPAIR)
LENGTH - 9.000
CONTRACT NO.: CNT228LET TO CONTRACT: 5/10/2019CONTRACTOR: POTTER SOUTH EAST LLCBID PRICE : $1,134,480.40EST. COMPLETION DATE: APRIL, 2020
PIN: 127831.00
ANDERSON COUNTY SR-9 US-25WINTERSECTION AT SR-170 (TURN LANES WITH SIGNAL) LENGTH - 0.275
CONTRACT NO.: CNT002LET TO CONTRACT: 6/21/2019CONTRACTOR: ROGERS GROUP, INC.BID PRICE : $1,549,191.40EST. COMPLETION DATE: OCTOBER, 2020
PIN: 122118.00
Page: 3
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
ANDERSON COUNTY SR-61 BRIDGE OVER NORFOLK SOUTHERN R/R AND FAU 4074 (MARKET ST/EAGLE BEND RD), LM 15.67 IN
CLINTON (BRIDGE REPAIR)
CONTRACT NO.: CNT003LET TO CONTRACT: 6/21/2019CONTRACTOR: SOUTHERN CONSTRUCTORS, INC.BID PRICE : $1,472,943.50EST. COMPLETION DATE: MAY, 2020
PIN: 083462.01
ANDERSON COUNTY SR-9 US-25WBRIDGE OVER CLINCH RIVER IN CLINTON, LM 10.71 (BRIDGE REPLACEMENT) LENGTH - 0.200
CONTRACT NO.: CNS234LET TO CONTRACT: 8/17/2018CONTRACTOR: CHARLES BLALOCK & SONS, INC.BID PRICE : $27,735,269.71EST. COMPLETION DATE: AUGUST, 2021
PIN: 083910.01
ANDERSON COUNTY I-75 NORTHBOUND EXIT RAMP 122-A AT SR-61(N CHARLES G SEVIERS BOULEVARD) - RAMP
IMPROVEMENTS (RAMP IMPROVEMENTS) LENGTH - 0.270
CONTRACT NO.: CNT319LET TO CONTRACT: 10/4/2019CONTRACTOR: TWIN K CONSTRUCTION, INC.BID PRICE : $762,850.47EST. COMPLETION DATE: OCTOBER, 2020
PIN: 125064.00
ANDERSON COUNTY SR-170 BRIDGE OVER BYRAMS FORK CREEK, LM 1.17 (BRIDGE REPAIR)
CONTRACT NO.: CNT344LET TO CONTRACT: 10/4/2019CONTRACTOR: TWIN K CONSTRUCTION, INC.BID PRICE : $98,739.41EST. COMPLETION DATE: MAY, 2020
PIN: 120312.00
Page: 4
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
No Projects Under Development in Blount CountyBLOUNT COUNTY SR-33 US-411
INTERSECTION AT FOOTHILLS MALL DRIVE/MONTGOMERY LANE, LM 10.21Length - 0.3 (Intersection Improvements)The right-of-way and/or utility process is underway.
PIN: 118422.00
BLOUNT COUNTY SR-35 US-411
SEVIERVILLE ROAD(US-411/SR-35), FROM WASHINGTON STREET TO WALNUT STREETLength - 0.5 (Reconstruction)The engineering is underway.
PIN: 113608.00
BLOUNT COUNTY SR-115 US-129BP
FROM SR-73 (LAMAR ALEXANDER PKWY) TO SR-35 (HALL ROAD) (IA)Length - 2.9 (Reconstruction)The engineering is underway.
PIN: 124754.00
BLOUNT COUNTY SR-115
NEAR LM'S 11.1, 14.5, 14.7, 15.07 AND 16.4 IN BLOUNT COUNTYLength - 0.0 (Mitigation - Rockfall)The engineering is underway.
PIN: 126765.00
BLOUNT COUNTY SR-115 US-129
(RELOCATED ALCOA HIGHWAY), FROM HUNT ROAD INTERCHANGE, SOUTH OF AIRPORT ROAD TO EXISTING SR-115 AT SOUTH SINGLETON STATION ROAD
Length - 5.5 (Location and Environmental Study)~The right-of-way and/or utility process is underway.
PIN: 101651.00
BLOUNT COUNTY SR-115 US-129
(RELOCATED ALCOA HIGHWAY), FROM PROPOSED INTERCHANGE AT TYSON BLVD TO SR-162 (PELLISSIPPI PARKWAY) (IA)
Length - 2.4 (Construction-New)The right-of-way and/or utility process is underway.
PIN: 101651.02
Page: 1
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
BLOUNT COUNTY SR-115 US-129
(RELOCATED ALCOA HIGHWAY), FROM SR-162(PELLISSIPPI PARKWAY) TO EXISTING SR-115 AT SOUTH SINGLETON STATION ROAD (IA)
Length - 1.3 (Construction-New)The right-of-way and/or utility process is underway.
PIN: 101651.03
BLOUNT - KNOX COUNTIES SR-115 US-129
(ALCOA HIGHWAY), FROM I-140 (PELLISSIPPI PARKWAY) TO CHEROKEE TRAILLength - 8.1 (Location and Environmental Study)~The engineering is underway.
PIN: 100241.00
BLOUNT COUNTY SR-115 US-129
(ALCOA HIGHWAY), PELLISSIPPI PARKWAY TO SOUTH OF TOPSIDE ROAD. (IA)Length - 2.7 (Widen)The engineering is underway.
PIN: 100241.01
BLOUNT - KNOX COUNTIES SR-115 US-129
ITS EXPANSION FROM I-140 IN BLOUNT COUNTY TO CHEROKEE TRAIL IN KNOX COUNTY (IA)Length - 7.4 (Intelligent Transportation System)The engineering is underway.
PIN: 124133.00
BLOUNT COUNTY SR-115 US-129
ITS EXPANSION FROM I-140 TO SOUTH OF TOPSIDE ROAD (IA) PRIORITY 2Length - 1.9 (Intelligent Transportation System)The engineering is underway.
PIN: 124133.02
KNOX - BLOUNT COUNTIES SR-115 US-129
ITS EXPANSION FROM SOUTH OF TOPSIDE ROAD TO CHEROKEE TRAIL INTERCHANGE (IA) PRIORITY 1
Length - 5.6 (Intelligent Transportation System)The right-of-way and/or utility process is underway.
PIN: 124133.01
BLOUNT COUNTY SR-162 EXT
(PELLISSIPPI PARKWAY), FROM SR-33 TO SR-73 (US-321) (IA)Length - 4.5 (Stage Construction-New)The engineering is underway.
PIN: 101423.00
Page: 2
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
BLOUNT COUNTY SR-162 EXT
(PELLISSIPPI PARKWAY), FROM SR-33 TO SR-73 (US-321) (IA)Length - 4.5 (Paving)The engineering is underway.
PIN: 101423.01
BLOUNT COUNTY SR-336
MONTVALE STATION ROAD TO SR-73(LAMAR ALEXANDER PARKWAY) (IA)Length - 0.6 (Widen)The engineering is underway.
PIN: 101725.02
BLOUNT COUNTY
PISTOL CREEK DAM IN ALCOA, STREAM MITIGATION(Env Mitigation and Wildlife Connectivity)The engineering is underway.
PIN: 104027.48
BLOUNT COUNTY
MCGHEE TYSON AIRPORT SITE IN ALCOA, STREAM MITIGATION(Env Mitigation and Wildlife Connectivity)The engineering is underway.
PIN: 104027.33
BLOUNT COUNTY SIA
INDUSTRIAL ACCESS SERVING PROJECT PYTHON METEOR(Widen and Resurfacing)The engineering is underway.
PIN: 123033.00
KNOX - BLOUNT COUNTIES I-140
ITS EXPANSION FROM I-140 MM 2 TO SR-115 (US-129, ALCOA HWY., EXIT 11) (IA)Length - 9.2 (Intelligent Transportation System)The right-of-way and/or utility process is underway.
PIN: 124131.00
KNOX - BLOUNT - SEVIER COUNTIES SR-71 US-441
(CHAPMAN HWY), FROM NEAR BLOUNT AVENUE TO NEAR SR-338 (BOYDS CREEK HWY) IN SEYMOUR (IA)
Length - 10.3 (Intersection Improvements and Signals)The engineering is underway.
PIN: 124784.00
Page: 3
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
No Projects Under Construction in Blount CountyBLOUNT COUNTY SIA INDUSTRIAL ACCESS ROAD SERVING DENSO (CONSTRUCTION-NEW)
CONTRACT NO.: CNU017LET TO CONTRACT: 3/27/2020CONTRACTOR: J & M GRADING DIVISION, LLCBID PRICE : $4,526,789.40EST. COMPLETION DATE: JUNE, 2022
PIN: 124863.00
BLOUNT COUNTY SIA ROBERT C. JACKSON DRIVE, FROM SR-73 (US-321, WEST LAMAR ALEXANDER PKWY) TO MIDDLE
SETTLEMENTS ROAD (WIDEN AND RESURFACING)
CONTRACT NO.: CNU017LET TO CONTRACT: 3/27/2020CONTRACTOR: J & M GRADING DIVISION, LLCBID PRICE : $10,937,791.01EST. COMPLETION DATE: JUNE, 2022
PIN: 126711.00
BLOUNT COUNTY SIA PEDESTRIAN BRIDGE OVER ROBERT C. JACKSON DRIVE (CONSTRUCTION-NEW)
CONTRACT NO.: CNU017LET TO CONTRACT: 3/27/2020CONTRACTOR: J & M GRADING DIVISION, INC.BID PRICE : $2,758,199.67EST. COMPLETION DATE: JUNE, 2022
PIN: 126711.01
BLOUNT COUNTY SR-33 FROM OLD KNOXVILLE PIKE TO EAST LINCOLN ROAD (INTERSECTION IMPROVEMENTS AND
SIGNALS) LENGTH - 0.570
CONTRACT NO.: CNS203LET TO CONTRACT: 5/11/2018CONTRACTOR: SOUTHERN CONSTRUCTORS, INC.BID PRICE : $1,227,280.50EST. COMPLETION DATE: APRIL, 2020
PIN: 118351.00
BLOUNT COUNTY VARIOUS LOCAL ROADS IN BLOUNT COUNTY (LOCAL ROADS SAFETY INITIATIVE)
(MISCELLANEOUS SAFETY IMPROVEMENTS)
CONTRACT NO.: CNT302LET TO CONTRACT: 10/4/2019CONTRACTOR: SUPERIOR PAVEMENT MARKING, INC.BID PRICE : $192,644.15EST. COMPLETION DATE: JULY, 2020
PIN: 125450.00
Page: 4
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
BLOUNT COUNTY SR-115 US-129(RELOCATED ALCOA HIGHWAY), FROM SR-35(HALL ROAD), SOUTH OF AIRPORT ROAD TO
PROPOSED INTERCHANGE AT TYSON BOULEVARD (IA) (WIDEN) LENGTH - 1.500
CONTRACT NO.: CNS272LET TO CONTRACT: 12/7/2018CONTRACTOR: CHARLES BLALOCK & SONS, INC.BID PRICE : $39,296,633.83EST. COMPLETION DATE: NOVEMBER, 2021
PIN: 101651.01
BLOUNT COUNTY SIA INDUSTRIAL ACCESS ROAD (CUSICK ROAD) SERVING ALUMINUM COMPANY OF AMERICA IN ALCOA
(CONSTRUCTION-NEW) LENGTH - 0.281
CONTRACT NO.: CNT006LET TO CONTRACT: 12/13/2019CONTRACTOR: APAC-ATLANTIC, INC.BID PRICE : $1,142,725.40EST. COMPLETION DATE: AUGUST, 2020
PIN: 120064.00
BLOUNT COUNTY Burnett Station Road BURNETT STATION ROAD, FROM I.C. KING ROAD TO HUSKEY VALLEY ROAD (MISCELLANEOUS
SAFETY IMPROVEMENTS) LENGTH - 1.780
CONTRACT NO.: CNT322LET TO CONTRACT: 12/13/2019CONTRACTOR: HIGHWAY MARKINGS, INC.BID PRICE : $113,925.25EST. COMPLETION DATE: AUGUST, 2020
PIN: 127848.00
BLOUNT COUNTY Morganton Road MORGANTON ROAD, FROM PANORAMA ROAD TO CLENDENEN ROAD (MISCELLANEOUS SAFETY
IMPROVEMENTS) LENGTH - 0.549
CONTRACT NO.: CNT322LET TO CONTRACT: 12/13/2019CONTRACTOR: HIGHWAY MARKINGS, INC.BID PRICE : $10,387.25EST. COMPLETION DATE: AUGUST, 2020
PIN: 127864.00
Page: 5
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
No Projects Under Development in Knox CountyBLOUNT - KNOX COUNTIES SR-115 US-129
(ALCOA HIGHWAY), FROM I-140 (PELLISSIPPI PARKWAY) TO CHEROKEE TRAILLength - 8.1 (Location and Environmental Study)~The engineering is underway.
PIN: 100241.00
BLOUNT - KNOX COUNTIES SR-115 US-129
ITS EXPANSION FROM I-140 IN BLOUNT COUNTY TO CHEROKEE TRAIL IN KNOX COUNTY (IA)Length - 7.4 (Intelligent Transportation System)The engineering is underway.
PIN: 124133.00
KNOX - BLOUNT COUNTIES SR-115 US-129
ITS EXPANSION FROM SOUTH OF TOPSIDE ROAD TO CHEROKEE TRAIL INTERCHANGE (IA) PRIORITY 1
Length - 5.6 (Intelligent Transportation System)The right-of-way and/or utility process is underway.
PIN: 124133.01
KNOX COUNTY I-40
BRIDGE OVER I-40/WESLEY RD. (IA)Length - 0.0 (Bridge Replacement)The engineering is scheduled to begin in the 3rd Quarter Calendar Year 2020.
PIN: 124438.00
KNOX COUNTY I-40
BRIDGE OVER I-40LL/17TH. STREET (IA)Length - 0.0 (Bridge Replacement)The engineering is scheduled to begin in the 3rd Quarter Calendar Year 2020.
PIN: 124439.00
KNOX COUNTY I-40
INTERCHANGE AT I-275 (I-40 WESTBOUND APPROACH) (IA)Length - 0.7 (Modify Interchange)The planning document is underway.
PIN: 124440.00
KNOX COUNTY I-75
INTERCHANGE AT I-640/275 (SHARPS GAP) (IA)Length - 0.6 (Modify Interchange)The planning document is underway.
PIN: 124443.00
Page: 1
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
KNOX - ANDERSON COUNTIES I-75
FROM NEAR MM 109.6 TO NEAR SR-61 (EXIT 122) (IA)Length - 13.0 (Intelligent Transportation System)This project is in the early stages of development.
PIN: 124453.00
KNOX COUNTY I-75
FROM NEAR SR-131 (NEAR EMORY ROAD) TO NEAR SR-170 (NEAR RACCOON VALLEY ROAD) (IA)Length - 5.1 (Reconstruction)The engineering is underway.
PIN: 124451.00
KNOX - BLOUNT COUNTIES I-140
ITS EXPANSION FROM I-140 MM 2 TO SR-115 (US-129, ALCOA HWY., EXIT 11) (IA)Length - 9.2 (Intelligent Transportation System)The right-of-way and/or utility process is underway.
PIN: 124131.00
KNOX COUNTY I-640
WESTBOUND EXIT RAMP AT MILLERTOWN PIKE (EXIT 8)Length - 0.3 (Ramp Improvements)The right-of-way and/or utility process is underway.
PIN: 119733.00
KNOX COUNTY I-640
INTERCHANGES AT MILLERTOWN PIKE AND WASHINGTON PIKELength - 1.4 (Ramp Improvements)The right-of-way and/or utility process is underway.
PIN: 121619.00
KNOX COUNTY SR-1 US-11
INTERSECTION AT NORTH WATT ROAD AND SOUTH WATT ROAD IN FARRAGUTLength - 0.4 (Intersection Improvements and Signals)A contract for construction is scheduled to be let in the 2nd Quarter Calendar Year 2020.
PIN: 122323.00
KNOX COUNTY SR-1 US-70
(KINGSTON PIKE), INTERSECTION AT SR-332 (NORTHSHORE DRIVE) (IA)Length - 0.2 (Intersection Improvements)The engineering is underway.
PIN: 124783.00
Page: 2
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
KNOX COUNTY SR-9 US-25W
INTERSECTION AT WEST BEAVER CREEK DRIVE (RSAR)Length - 0.0 (Intersection Improvements)The right-of-way and/or utility process is being performed by the local agency.
PIN: 110982.00
KNOX COUNTY SR-62
(OAK RIDGE HWY), FROM NEAR SR-131 TO NEAR SCHAAD ROAD (IA)Length - 4.2 (Widen)The planning report is complete.
PIN: 124473.00
KNOX COUNTY SR-71
FROM SOUTH OF SIMPSON ROAD TO HENDRON CHAPEL ROAD LM 1.00 TO LM 1.98 IN KNOXVILLE
Length - 1.0 (Turn Lanes)The right-of-way and/or utility process is underway.
PIN: 119668.00
KNOX - BLOUNT - SEVIER COUNTIES SR-71 US-441
(CHAPMAN HWY), FROM NEAR BLOUNT AVENUE TO NEAR SR-338 (BOYDS CREEK HWY) IN SEYMOUR (IA)
Length - 10.3 (Intersection Improvements and Signals)The engineering is underway.
PIN: 124784.00
KNOX COUNTY SR-115 US-129
FROM WOODSON DRIVE TO CHEROKEE TRAIL INTERCHANGE (IA)Length - 1.6 (Widen)The right-of-way and/or utility process is underway.
PIN: 100241.03
KNOX COUNTY SR-131
(LOVELL ROAD) AT PARKSIDE DRIVE IN KNOXVILLELength - 0.0 (Miscellaneous Safety Improvements)The engineering is underway.
PIN: 125570.00
KNOX COUNTY SR-131
INTERSECTION AT HARRELL ROAD/CARPENTER ROAD (RSAR)Length - 0.0 (Intersection Improvements and Signals)The engineering is underway.
PIN: 119390.00
Page: 3
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
KNOX COUNTY SR-131
(EAST EMORY ROAD), FROM NEAR SR-33 TO NEAR SR-331 (IA)Length - 4.9 (Reconstruction)The engineering is underway.
PIN: 124455.00
KNOX COUNTY SR-162
(PELLISSIPPI PKWY) INTERCHANGE AT SR-62 (OAK RIDGE HWY) IN SOLWAY (IA)Length - 0.5 (Intersection Improvements)The engineering is scheduled to begin in the 2nd Quarter Calendar Year 2020.
PIN: 123073.00
KNOX COUNTY Pleasant Ridge Road
PLEASANT RIDGE ROAD, FROM KNOXVILLE CITY LIMITS TO THE MERCHANT DRIVE/WILKERSON ROAD INTERSECTION IN KNOXVILLE
Length - 1.6 (Reconstruction)The right-of-way and/or utility process is being performed by the local agency.
PIN: 101008.00
Page: 4
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
No Projects Under Construction in Knox CountyKNOX COUNTY SR-115 US-129FROM NORTH OF MALONEY ROAD TO WOODSON DRIVE (WIDEN) LENGTH - 1.400
CONTRACT NO.: CNQ029LET TO CONTRACT: 2/12/2016CONTRACTOR: CHARLES BLALOCK & SONS, INC.BID PRICE : $70,944,183.28EST. COMPLETION DATE: SEPTEMBER, 2020
PIN: 100241.04
KNOX COUNTY I-640 INTERCHANGE AT NORTH BROADWAY (PHASE II) IN KNOXVILLE (MODIFY INTERCHANGE) LENGTH -
1.093
CONTRACT NO.: CNQ030LET TO CONTRACT: 2/12/2016CONTRACTOR: CHARLES BLALOCK & SONS, INC.BID PRICE : $22,217,026.43EST. COMPLETION DATE: APRIL, 2020
PIN: 103029.00
KNOX COUNTY I-40 M20LTHQ_C47I_SIGN REPAIR I-40 LM 17.83 (SIGNS) LENGTH - 0.010
CONTRACT NO.: CNU084LET TO CONTRACT: 2/7/2020CONTRACTOR: SUPERIOR TRAFFIC CONTROL, LLCBID PRICE : $126,768.00EST. COMPLETION DATE: AUGUST, 2020
PIN: 129938.00
KNOX COUNTY SR-162 INTERCHANGE AT HARDIN VALLEY RD.( LM 2.35 TO LM 2.95) (MISCELLANEOUS SAFETY
IMPROVEMENTS) LENGTH - 0.600
CONTRACT NO.: CNU088LET TO CONTRACT: 3/27/2020CONTRACTOR: CHARLES BLALOCK & SONS, INC.BID PRICE : $5,051,705.79EST. COMPLETION DATE: JULY, 2021
PIN: 119719.00
KNOX COUNTY SR-168 FROM NEAR MARTIN MILL PIKE TO NEAR CINDER LANE (RESURF, SAFETY & BR REPAIR) LENGTH -
9.060
CONTRACT NO.: CNU094LET TO CONTRACT: 3/27/2020CONTRACTOR: APAC-ATLANTIC, INC.BID PRICE : $2,429,607.55EST. COMPLETION DATE: SEPTEMBER, 2020
PIN: 129097.00
Page: 5
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
KNOX COUNTY I-40 BRIDGE OVER SR-168 AND HOLSTON RIVER, LM 25.91 (BRIDGE REPAIR)
CONTRACT NO.: CNU131LET TO CONTRACT: 3/27/2020CONTRACTOR: SOUTHERN CONSTRUCTORS, INC.BID PRICE : $3,962,461.50EST. COMPLETION DATE: JULY, 2021
PIN: 101197.01
KNOX COUNTY SR-1 US-11BRIDGE OVER SOUTHERN R/R, LM 19.47 IN KNOXVILLE (BROADWAY VIADUCT) (BRIDGE
REPLACEMENT) LENGTH - 0.234
CONTRACT NO.: CNT014LET TO CONTRACT: 5/10/2019CONTRACTOR: BELL & ASSOCIATES CONSTRUCTION, LPBID PRICE : $17,356,589.84EST. COMPLETION DATE: AUGUST, 2022
PIN: 101623.00
KNOX COUNTY SR-1 M19LTHQ_C47SR_TUNLCLN KNOX-HENLEY ST TUNNEL AND SMARTFIX I-40 RAMP - CLEANING
(FY19) (MAINTENANCE)
CONTRACT NO.: CNT197LET TO CONTRACT: 5/10/2019CONTRACTOR: DIAMOND SPECIALIZED, INC.BID PRICE : $123,699.00EST. COMPLETION DATE: JUNE, 2020
PIN: 103635.15
KNOX COUNTY I-140 (SR-162, PELLISSIPPI PARKWAY), WESTBOUND RAMP TO DUTCHTOWN ROAD (INTERSECTION
IMPROVEMENTS AND SIGNALS)
CONTRACT NO.: CNT013LET TO CONTRACT: 6/21/2019CONTRACTOR: APAC-ATLANTIC, INC.BID PRICE : $3,296,930.25EST. COMPLETION DATE: JULY, 2020
PIN: 119730.00
KNOX COUNTY SEVEN ISLANDS PEDESTRIAN BRIDGE (BICYCLES AND PEDESTRIAN FACILITY)
CONTRACT NO.: CNR226LET TO CONTRACT: 8/18/2017CONTRACTOR: KAY & KAY CONTRACTING, LLCBID PRICE : $4,489,866.41EST. COMPLETION DATE: APRIL, 2020
PIN: 041534.00
Page: 6
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
KNOX - SEVIER COUNTIES SR-71 US-441(CHAPMAN HIGHWAY), FROM EVANS ROAD TO BURNETT LANE (TURN LANES) LENGTH - 0.900
CONTRACT NO.: CNT015LET TO CONTRACT: 8/9/2019CONTRACTOR: CHARLES BLALOCK & SONS, INC.BID PRICE : $4,592,669.71EST. COMPLETION DATE: SEPTEMBER, 2020
PIN: 115662.00
KNOX COUNTY SR-1 US-11WBRIDGE OVER NORFOLK SOUTHERN R/R, LM 25.47 (BRIDGE REPAIR)
CONTRACT NO.: CNT022LET TO CONTRACT: 8/9/2019CONTRACTOR: POTTER SOUTH EAST LLCBID PRICE : $672,381.25EST. COMPLETION DATE: JULY, 2020
PIN: 121944.00
KNOX COUNTY SR-115 US-129FROM SOUTH OF TOPSIDE ROAD TO NORTH OF MALONEY ROAD (IA) (WIDEN) LENGTH - 2.200
CONTRACT NO.: CNT023LET TO CONTRACT: 8/9/2019CONTRACTOR: CHARLES BLALOCK & SONS, INC.BID PRICE : $64,487,767.37EST. COMPLETION DATE: MAY, 2023
PIN: 100241.02
KNOX COUNTY SR-62 WESTERN AVENUE, FROM TEXAS AVENUE TO MAJOR AVENUE IN KNOXVILLE (RECONSTRUCTION)
LENGTH - 0.800
CONTRACT NO.: CNQ297LET TO CONTRACT: 10/7/2016CONTRACTOR: JONES BROS., INC.BID PRICE : $38,449,919.62EST. COMPLETION DATE: JUNE, 2020
PIN: 101204.00
KNOX COUNTY KNOXVILLE ITS SYSTEM MAINTENANCE (INTELLIGENT TRANSPORTATION SYSTEM)
CONTRACT NO.: CNR281LET TO CONTRACT: 10/6/2017CONTRACTOR: STANSELL ELECTRIC COMPANY, INC.BID PRICE : $7,698,000.00EST. COMPLETION DATE: DECEMBER, 2020
PIN: 105611.07
Page: 7
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
KNOX COUNTY SR-332 (CONCORD ROAD), TURKEY CREEK TO NORTHSHORE DRIVE (WIDEN) LENGTH - 0.930
CONTRACT NO.: CNS009LET TO CONTRACT: 10/5/2018CONTRACTOR: SUMMERS-TAYLOR, INC.BID PRICE : $10,192,277.64EST. COMPLETION DATE: AUGUST, 2021
PIN: 107777.00
KNOX COUNTY SR-62 (OAK RIDGE HWY) NEAR LM 3.4 (SLOPE STABILIZATION) (FEBRUARY 2019 FLOOD) (SAFETY)
LENGTH - 0.010
CONTRACT NO.: CNT290LET TO CONTRACT: 10/4/2019CONTRACTOR: J & M GRADING DIVISION, LLCBID PRICE : $2,068,023.95EST. COMPLETION DATE: JULY, 2020
PIN: 128750.00
KNOX COUNTY I-40 INTERCHANGE AT SR-9/SR-168, EASTBOUND OFF-RAMP - EXIT 394(RAMP QUEUE PROJECT)
(MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH - 0.880
CONTRACT NO.: CNT338LET TO CONTRACT: 10/4/2019CONTRACTOR: STANSELL ELECTRIC COMPANY, INC.BID PRICE : $160,916.80EST. COMPLETION DATE: APRIL, 2020
PIN: 121441.00
KNOX COUNTY SR-33 US-441(MAYNARDVILLE HIGHWAY) SIDEWALKS FROM DORIS CIRCLE TO LEDGERWOOD ROAD (BICYCLES
AND PEDESTRIAN FACILITY) LENGTH - 1.210
CONTRACT NO.: CNT345LET TO CONTRACT: 10/4/2019CONTRACTOR: SOUTHERN CREATIONS LANDSCAPING, LLCBID PRICE : $1,199,803.50EST. COMPLETION DATE: JUNE, 2020
PIN: 126972.00
KNOX COUNTY SR-9 US-25WINTERSECTION AT SR-131 (RSAR) (INTERSECTION IMPROVEMENTS AND SIGNALS) LENGTH - 0.010
CONTRACT NO.: CNT348LET TO CONTRACT: 10/4/2019CONTRACTOR: SOUTHERN CONSTRUCTORS, INC.BID PRICE : $648,109.00EST. COMPLETION DATE: JUNE, 2020
PIN: 120297.00
Page: 8
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
KNOX COUNTY SR-169 NORTHWEST OF CEDAR BLUFF ROAD TO OLD CEDAR BLUFF ROAD (BICYCLES AND PEDESTRIAN
FACILITY) LENGTH - 0.180
CONTRACT NO.: CNT349LET TO CONTRACT: 10/4/2019CONTRACTOR: WHALEY CONSTRUCTION, LLCBID PRICE : $169,573.79EST. COMPLETION DATE: MAY, 2020
PIN: 126896.00
KNOX COUNTY SR-131 INTERSECTIONS AT FAIRVIEW ROAD AND THOMPSON SCHOOL ROAD (INTERSECTION
IMPROVEMENTS AND SIGNALS) LENGTH - 0.325
CONTRACT NO.: CNS258LET TO CONTRACT: 12/7/2018CONTRACTOR: WHALEY CONSTRUCTION, LLCBID PRICE : $3,347,466.25EST. COMPLETION DATE: APRIL, 2020
PIN: 119046.00
KNOX COUNTY I-75 FROM I-640 TO NEAR CALLAHAN DRIVE (RESURF, SAFETY & BR REPAIR) LENGTH - 2.540
CONTRACT NO.: CNS362LET TO CONTRACT: 12/7/2018CONTRACTOR: ROGERS GROUP, INC.BID PRICE : $3,946,759.50EST. COMPLETION DATE: APRIL, 2020
PIN: 127456.00
KNOX COUNTY I-75 FROM NEAR CALLAHAN DRIVE TO NEAR SR-131 (RESURF, SAFETY & BR REPAIR) LENGTH - 2.560
CONTRACT NO.: CNS362LET TO CONTRACT: 12/7/2018CONTRACTOR: ROGERS GROUP, INC.BID PRICE : $4,403,266.10EST. COMPLETION DATE: APRIL, 2020
PIN: 127459.00
KNOX - SEVIER COUNTIES I-40 ITS EXPANSION FROM NEAR STRAWBERRY PLAINS PIKE (EXIT 398) INTERCHANGE TO NEAR SR-66
(SEVIERVILLE, EXIT 407) INTERCHANGE (IA) (INTELLIGENT TRANSPORTATION SYSTEM) LENGTH - 10.160
CONTRACT NO.: CNT390LET TO CONTRACT: 12/13/2019CONTRACTOR: DAVIS H. ELLIOT CONSTRUCTION COMPANY, INC.BID PRICE : $4,286,091.10EST. COMPLETION DATE: JUNE, 2022
PIN: 124474.00
Page: 9
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
KNOX COUNTY I-40 FROM NEAR I-140 TO NEAR NORTH WINSTON ROAD (RESURF, SAFETY & BR REPAIR) LENGTH -
4.350
CONTRACT NO.: CNT391LET TO CONTRACT: 12/13/2019CONTRACTOR: APAC-ATLANTIC, INC.BID PRICE : $7,436,184.80EST. COMPLETION DATE: OCTOBER, 2020
PIN: 127460.00
Page: 10
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
No Projects Under Development in Loudon CountyLOUDON COUNTY I-75
FROM POND CREEK ROAD (SR-323) TO THE I-40/I-75 JUNCTION (IA)Length - 16.1 (Widen)The engineering is scheduled to begin in the 3rd Quarter Calendar Year 2020.
PIN: 124480.00
LOUDON COUNTY I-75
INTERCHANGE AT SR-73 (US-321), EXIT 81Length - 0.0 (Interchange Lighting)The engineering is underway.
PIN: 125455.00
LOUDON COUNTY SR-2 US-11
FROM SOUTH OF LOUDON MIDDLE SCHOOL TO NORTH OF CARTER STREET.Length - 0.5 (Widen)A contract for construction is scheduled to be let in the 2nd Quarter Calendar Year 2020.
PIN: 125200.00
LOUDON COUNTY Kingston St.
KINGSTON STREET, INTERSECTION AT TOWN CREEK ROAD (RSAR)Length - 0.0 (Miscellaneous Safety Improvements)The right-of-way and/or utility process is being performed by the local agency.
PIN: 120048.00
Page: 1
TENNESSEE DEPARTMENT OF TRANSPORTATION
Project Status
4/16/2020
No Projects Under Construction in Loudon CountyLOUDON COUNTY SR-73 US-321FROM SR-2(US-11) TO EAST OF LITTLE TENNESSEE RIVER (FT LOUDOUN/TELLICO CANAL)
(RECONSTRUCTION) LENGTH - 1.710
CONTRACT NO.: CNL139LET TO CONTRACT: 6/15/2012CONTRACTOR: CHARLES BLALOCK & SONS, INC.BID PRICE : $69,361,720.70EST. COMPLETION DATE: APRIL, 2020
PIN: 100489.00
LOUDON COUNTY SR-73 US-321FROM SIMPSON ROAD EAST TO NORTH OF SR-2(US-11) IN LENOIR CITY (WIDEN) LENGTH - 1.281
CONTRACT NO.: CNR295LET TO CONTRACT: 10/6/2017CONTRACTOR: J & M GRADING DIVISION LLCBID PRICE : $6,941,516.95EST. COMPLETION DATE: APRIL, 2020
PIN: 103899.00
LOUDON COUNTY SR-73 US-321INTERSECTION AT SR-2(US-11) IN LENOIR CITY (INTERSECTION IMPROVEMENTS) LENGTH - 0.130
CONTRACT NO.: CNR295LET TO CONTRACT: 10/6/2017CONTRACTOR: J & M GRADING DIVISION LLCBID PRICE : $5,809,759.10EST. COMPLETION DATE: APRIL, 2020
PIN: 115209.00
LOUDON COUNTY VARIOUS LOCAL ROADS IN LOUDON COUNTY (LOCAL ROADS SAFETY INITIATIVE)
(MISCELLANEOUS SAFETY IMPROVEMENTS)
CONTRACT NO.: CNT368LET TO CONTRACT: 12/13/2019CONTRACTOR: HIGHWAY MARKINGS, INC.BID PRICE : $189,473.00EST. COMPLETION DATE: SEPTEMBER, 2020
PIN: 125450.24
Page: 2