TENDER NOTICE - 29.07.2019-2 · 6.testing & certification will be carried out as per code bs en...

18
SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT 1 10114198 BENCH;LABORATORY WITH 16MM EPOXY WORKTOP Laboratory Benches with Epoxy worktop Specification; 1. SizeL: 5800* W:1500*H:900 mm 2. 16 mm black epoxy worktop 3. Cabinet is made of 1.2 mm CRS with epoxy coating 4. 24 pcs single socket 5. 100 back splash 6. 6 pcs two-way gas tap 7. 4 pcs single water tap 8. 2 pcs epoxy sink 9. 2 pcs PP dry rack 10. 4300 mm double layer reagent shelf 1 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT 1 10114197 BENCH; LABORATORY ISLAND WITH EPOXY TOP Laboratory Island Bench with Epoxy worktop, Sink and Reagent Shelves 1. Size: L: 5800 x W:1500 x H:900 mm 2. 16 mm black epoxy worktop 3. Cabinet is made of 1.2 mm CRS with epoxy caoting 4. 24 pcs single socket 5. 100 back splash 6. 6 pcs two way gas tap 7. 4 pcs single water tap 8. 2 pcs epoxy sink 9. 2 pcs PP dry rack 10. 4300 mm double layder reagent shelf 1 EA SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT 1 SERVICES OF RE-BABBITTING OF TURBINE SERVICES OF RE-BABBITTING OF TURBINE JOURNAL BEARING # 03, UNIT # 06, BQPS1. 1 AU PROCUREMENT OF TESTING BENCH FOR OIL LABORATORY , BQPS-1 PR# 1400024248, FG1265/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019 PROCUREMENT OF ISLAND BENCH FOR WATER LABORATORY, BQPS-1 PR# 1400024249, FG1266/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019 SERVICES OF RE-BABBITTING OF TURBINE JOURNAL BEARING # 03, UNIT # 06, BQPS1. PR# 1300042078, FG1267/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019 TENDER NOTICE K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below; Collection of Tenders as follows : Monday - 09:00 AM to 03:00 PM Thursday - 09:00 AM to 03:00 PM

Transcript of TENDER NOTICE - 29.07.2019-2 · 6.testing & certification will be carried out as per code bs en...

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10114198

BENCH;LABORATORY WITH 16MM EPOXY WORKTOPLaboratory Benches with Epoxy worktop

Specification;1. Size: L: 5800* W:1500*H:900 mm2. 16 mm black epoxy worktop3. Cabinet is made of 1.2 mm CRS with epoxy coating4. 24 pcs single socket5. 100 back splash6. 6 pcs two-way gas tap7. 4 pcs single water tap8. 2 pcs epoxy sink9. 2 pcs PP dry rack10. 4300 mm double layer reagent shelf

1 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10114197

BENCH; LABORATORY ISLAND WITH EPOXY TOPLaboratory Island Bench with Epoxy worktop, Sink and Reagent Shelves1. Size: L: 5800 x W:1500 x H:900 mm2. 16 mm black epoxy worktop3. Cabinet is made of 1.2 mm CRS with epoxy caoting4. 24 pcs single socket5. 100 back splash6. 6 pcs two way gas tap7. 4 pcs single water tap8. 2 pcs epoxy sink9. 2 pcs PP dry rack10. 4300 mm double layder reagent shelf

1 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1SERVICES OF RE-BABBITTING OF TURBINESERVICES OF RE-BABBITTING OF TURBINE JOURNAL BEARING # 03, UNIT # 06, BQPS1.

1 AU

PROCUREMENT OF TESTING BENCH FOR OIL LABORATORY , BQPS-1PR# 1400024248, FG1265/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

PROCUREMENT OF ISLAND BENCH FOR WATER LABORATORY, BQPS-1PR# 1400024249, FG1266/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

SERVICES OF RE-BABBITTING OF TURBINE JOURNAL BEARING # 03, UNIT # 06, BQPS1.PR# 1300042078, FG1267/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

TENDER NOTICE

K-Electric is Pakistan’s only vertically-integrated power utility that generates, transmits and distributes energy to more than 2.5 million consumers across Karachi and its outskirts. The company invites sealed tenders for procurement / supply as per details given below;

Collection of Tenders as follows :

Monday - 09:00 AM to 03:00 PMThursday - 09:00 AM to 03:00 PM

Re-Babbiting of Journal BearingJOURNAL BEARING # 03, UNIT # 06, BQPS1.

SCOPE OF WORK:

10104566

-VISUAL INSPECTION-CHEMICAL CLEANING-DISTORTION CHECKING OF BEARING SHELL-REMOVAL OF WHITE METAL-TURNING OF BEARING-MACHINING OF BEARING AS PER DRAWING PROVIDED BY US.-REMETALLING OF WHITE METAL THROUGH CENTRIFUGAL CASTING / STATIC CASTING.-NDT (DPT & UT COMPLETE REPORTS)-FINAL INSPECTION AND PACKING

SAFE TRANSPORTATION FROM BQPS1 KARACHI TO YOUR WORKS AND BACK TO BQPS1 KARACHI.

EA

1. VENDORS ARE TO SUBMIT FOLLOWING, AT LEAST 2 WEEKS BEFORE COMMENCEMENT OF OUTAGE;a. A LIST OF SKILLED MANPOWER FOR REVIEW OF USERb. A LIST OF TOOLS WITH CERTIFICATION PROOFc. MOBILIZATION PLANd. JOB EXECUTION PLAN INCLUDING MILE STONES2. VENDORS ARE BOUND TO;a. CONDUCT DAILY HOUSE KEEPING, FAILING WHICH THEY SHOULD BE PENALIZED IN MONITORING TERMS REFLECTING IN POb. TO APPOINT SAFETY INSPECTOR FOR A GROUP OF 20 WORKER OR ABOVE. THE SAFETY INSPECTOR SHOULD HAVE AN EXPERIENCE OF 3 YEARS AND TO BE CERTIFIED BY SAFETY DEPARTMENT OF BQPS-1 AND MUST HAVE KNOWLEDGE OF:i. PERMIT TO WORK SYSTEMii. RISK ASSESSMENT

3. LDS ON VENDORS SHALL BE IMPLEMENTED DUE TO FOLLOWING SAFETY VIOLATIONSi. NONCONFORMANCE OF PPESii. NONCONFORMANCE OF HOUSE KEEPINGiii. WORKING WITHOUT WORK PERMITiv. UNSAFE ACTS4. FOR A GROUP OF 100 WORKERS OR MORE, VENDORS SHALL BE BOUND TO HAVE THEIR OWN ARRANGEMENT OF ;a. SITE FACILITY WITH REST ROOMSb. TOOL FACILITYc. LUNCH FACILITYd. WATER FACILITYe. TOILET FACILITY

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNITTESTING AND CERTIFICATION OF CRANES,

72005521.1 1

TESTING AND CERTIFICATION OF CRANES, HOIST & GONDOLA (LONG LEAD ITEM-LLI), BQPS-1PR# 1300041923, FG1268/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

1. VENDORS ARE TO SUBMIT FOLLOWING, AT LEAST 2 WEEKS BEFORE COMMENCEMENT OF OUTAGE;a. A LIST OF SKILLED MANPOWER FOR REVIEW OF USERb. A LIST OF TOOLS WITH CERTIFICATION PROOFc. MOBILIZATION PLANd. JOB EXECUTION PLAN INCLUDING MILE STONES

2. VENDORS ARE BOUND TO;

a. CONDUCT DAILY HOUSE KEEPING, FAILING WHICH THEY SHOULD BE PENALIZED IN MONITORING TERMS REFLECTING IN PO

b. TO APPOINT SAFETY INSPECTOR FOR A GROUP OF 20 WORKER OR ABOVE. THE SAFETY INSPECTOR SHOULD HAVE AN EXPERIENCE OF 3 YEARS AND TO BE CERTIFIED BY SAFETY DEPARTMENT OF BQPS-1 AND MUST HAVE

KNOWLEDGE OF:i. PERMIT TO WORK SYSTEMii. RISK ASSESSMENT3. LDS ON VENDORS SHALL BE IMPLEMENTED DUE TO FOLLOWING SAFETY VIOLATIONSi. NONCONFORMANCE OF PPESii. NONCONFORMANCE OF HOUSE KEEPINGiii. WORKING WITHOUT WORK PERMITiv. UNSAFE ACTS4. FOR A GROUP OF 100 WORKERS OR MORE, VENDORS SHALL BE BOUND TO HAVE THEIR OWN ARRANGEMENT OF ;a. SITE FACILITY WITH REST ROOMSb. TOOL FACILITYc. LUNCH FACILITYd. WATER FACILITYe. TOILET FACILITY

Certification of Hoist Crane SectionHOIST CRANE U#1 FDF # 1-2 7.5 TON

HOIST & GONDOLA

TESTING & CERTIFICATION OF CRANES HOIST & GONDOLA WAS PERFORMED BY M/S. URS INSPECTION PRIVATE LIMITED AGAINST PO # 7500038209, DATED 22/10/2018. THE VALIDITY OF CERTIFICATION IS VALID FOR ONE YEAR, NEW CONTRACT FOR TESTING & CERTIFICATION IS TO BE AWARDED TO THE INSPECTION COMPANY. LIST OF EQUIPMENT IS ATTACHED AS ANNEXURE-A.

Services1 1 AU

NOTE:1.DEAD TEST LOAD UP TO 50 TONS WILL BE ARRANGED BY CONTRACTOR; ALSO MOBILIZING/DEMOBILIZING & HANDLING OF LOADS WILL BE RESPONSIBILITY OF CONTRACTOR.

2.PRIOR EXECUTION OF JOB, A PRE-INSPECTION WILL BE CONDUCTED BY THE CONTRACTOR IN PRESENCE OF BQPS - REPRESENTATIVES (DGM / MANAGER MECHANICAL & ELECTRICAL)

3.TESTING WILL BE PERFORMED IN PRESENCE OF BQPS - REPRESENTATIVES (DGM / MANAGER MECHANICAL & ELECTRICAL) AND SAME TIME WITNESSED BY BOTH PARTIES.

4.BEFORE PERFORMING TESTING / CERTIFICATION, COMPLETE PROCEDURE /CERTIFICATION PROTOCOLS WILL BE SUBMITTED, AND IF AGREED WILL BE SIGNED BY BOTH THE PARTIES.

5.DEAD LOAD HANDLING/MOVEMENT WILL BE RESPONSIBILITY OF CONTRACTOR.

6.TESTING & CERTIFICATION WILL BE CARRIED OUT AS PER CODE BS EN 7121- 2-

7:2012KINDLY RAISE REQUISITION FOR TESTING & CERTIFICATION OF EQUIPMENT AS PER ATTACHED LIST (ANNEXURE-A)

ANNEXURE - A S.No Name Location CAPACITY Next dueDate1 HOIST CRANE U#1 FDF # 1-2 7.5 ton Dec 20192 HOIST CRANE U#1 GRF-1 10 ton Dec 20193 HOIST CRANE U#1 GRF-2 10 ton Dec 20194 HOIST CRANE U#1 22M 2 ton Dec 20195 HOIST CRANE U#1 43M 6 ton Dec 20196 OVERHEAD CRANE DEG BUILDING U#1-2 10 ton Dec 20197 HOIST CRANE WT 1-2 3 ton Dec 20198 HOIST CRANE WT 1-2 CHECMICAL TANK 5 ton Dec 20199 GANTRY CRANE CWP 1-2 30 ton Dec 201910 HOIST CRANE U#1 -5.5 CP Motor 5 ton Dec 201911 OVERHEAD CRANE CENTRAL W/SHOP 30 ton Dec 201912 OVERHEAD CRANE STORE 1 30 ton Dec 201913 OVERHEAD CRANE UNLODING AREA 5 ton Dec 201914 OVERHEAD CRANE TURBINE 1/2/3 AUX 25 ton Dec 201915 OVERHEAD CRANE TURBINE 1/2/3 125 ton Dec 201916 OVERHEAD CRANE RO PLANT 2 ton Dec 201917 OVERHEAD CRANE SF 6 BUILDING 10 ton Dec 201918 HOIST CRANE U#2 FDF # 1-2 7.5 ton Dec 2019

19 HOIST CRANE U#2 GRF 1 10 ton Dec 201920 HOIST CRANE U#2 GRF 2 10 ton Dec 201921 HOIST CRANE U#2 22 meter 2 ton Dec 201922 HOIST CRANE U#2 43 meter 6 ton Dec 201923 HOIST CRANE U#2 -5.5 CP Motor 5 ton Dec 201924 HOIST CRANE U#3 FDF 1 Motor 10 ton Dec 201925 HOIST CRANE U#3 FDF 1 Fan 11 ton Dec 201926 HOIST CRANE U#3 FDF 2 13 ton Dec 201927 HOIST CRANE U#3 GRF 1 Motor 13 ton Dec 201928 HOIST CRANE U#3 GRF 1 Fan 8 ton Dec 201929 HOIST CRANE U#3 GRF 2 10 ton Dec 201930 HOIST CRANE 22 meter U#3 2 ton Dec 201931 HOIST CRANE 43 meter U#3 6 ton Dec 201932 OVERHEAD CRANE DIESEL ENGINE BUILDING U#3/4 10 ton Dec 2019

72004101.1 1 EA

50 HOIST CRANE U#4 -5 meter vacuum pump 3 ton Dec 201951 HOIST CRANE U#4 O/S pump -5 meter 3 ton Dec 201952 HOIST CRANE U#4 C/S pump -5 meter 3 ton Dec 201960 OVERHEAD CRANE TURBINE HALL AUX 25 ton Dec 201953 OVERHEAD CRANE TURBINE HALL 125 ton Dec 201954 GANTRY CRANE CWP STATION 3 TO 6 30 ton Dec 201955 HOIST CRANE U#5 FDF 1/2 7.5 Dec 201956 HOIST CRANE U#5 GRF 1 10 ton Dec 201957 HOIST CRANE U#5 GRF 2 10 ton Dec 201958 HOIST CRANE U#5 22 meter 2 ton Dec 201959 HOIST CRANE U#5 43 meter 6 ton Dec 201961 OVERHEAD CRANE U#5 Compressor Room 5 ton Dec 201962 OVERHEAD CRANE STORE 2 10 ton Dec 201963 HOIST CRANE U#6 FDF 1 10 ton Dec 201964 HOIST CRANE U#6 FDF 2 10 ton Dec 201965 HOIST CRANE U#6 FDF Centre 7.5 ton Dec 201966 HOIST CRANE U#6 GRF 1 7.5 ton Dec 201967 HOIST CRANE U#6 GRF 2 7.5 ton Dec 2019

68 HOIST CRANE U#6 22 meter 2 ton Dec 201969 HOIST CRANE U#6 43 meter 6 ton Dec 201970 OVERHEAD CRANE DIESEL ENGINE BUILDING U#5/6 10 ton Dec 201971 OVERHEAD CRANE U#6 Compressor Room 5 ton Dec 201972 OVERHEAD CRANE Store-2 building 10 ton Dec 201973 HOIST CRANE U#6 Control Room back side 2 ton Dec 2019

74 HOIST CRANE U#6 O/S 1 pump -5 meter 3 ton Dec 201975 HOIST CRANE U#6 O/S 2 pump -5 meter 3 ton Dec 201976 HOIST CRANE U#6 C/S 1 pump -5 meter 3 ton Dec 201977 HOIST CRANE U#6 C/S 2 pump -5 meter 3 ton Dec 201978 HOIST CRANE Water treatment 5/6 6 ton Dec 201979 HOIST CRANE U#1 -5.5 CP Motor 5 ton Dec 201980 HOIST CRANE U#2 -5.5 CP Motor 5 ton Dec 201981 HOIST CRANE Chlorine plant 1.5 ton Dec 201982 Mobile Crane BQPS-I Workshop & Services 10 ton Dec 201983 Fork Lifter-1 BQPS-I Workshop & Services 2 ton Dec 201984 Fork Lifter-2 BQPS-I Workshop & Services 5 ton Dec 201985 Fork Lifter-3 BQPS-I Workshop & Services 6 ton Dec 201986 GONDOLA-1 U#1 to 6 BOILER 400 KG Dec 201987 GONDOLA-2 U#1 to 6 BOILER 400 KG Dec 201988 GONDOLA-3 U#1 to 6 BOILER 400 KG Dec 201989 GONDOLA-1 U#1 to 6 BOILER 200 KG Dec 2019

1.2 7200410Certification of Hoist Crane SectionHOIST CRANE U#1 GRF-1 10 TON

1 EA

1.3 7200410Certification of Hoist Crane SectionHOIST CRANE U#1 GRF-2 10 TON

1 EA

1.4 7200410 Certification of Hoist Crane Section HOIST CRANE U#1 22M 2 TON 1 EA1.5 7200410 Certification of Hoist Crane Section HOIST CRANE U#1 43M 6 TON 1 EA

1.6 7200410Certification of Hoist Crane Section OVERHEAD CRANE DEG BUILDING U#1-2 10 TON

1 EA

1.7 7200410Certification of Hoist Crane SectionHOIST CRANE WT 1-2 3 TON

1 EA

1.8 7200410Certification of Hoist Crane SectionHOIST CRANE WT 1-2 CHECMICAL TANK 5 TON

1 EA

1.9 7200410Certification of Hoist Crane SectionGANTRY CRANE CWP 1-2 30 TON

1 EA

1.1 7200410Certification of Hoist Crane SectionHOIST CRANE U#1 -5.5 CP MOTOR 5 TON

1 EA

1.11 7200410Certification of Hoist Crane SectionOVERHEAD CRANE CENTRAL W/SHOP 30 TON

1

1.12 7200410Certification of Hoist Crane SectionOVERHEAD CRANE STORE 1 30 TON

1

1.13 7200410Certification of Hoist Crane SectionOVERHEAD CRANE UNLODING AREA 5 TON

1

1.14 7200410Certification of Hoist Crane SectionOVERHEAD CRANE TURBINE 1/2/3 AUX 25 TON

1

1.15 7200410Certification of Hoist Crane SectionOVERHEAD CRANE TURBINE 1/2/3 125 TON

1

1.16 7200410Certification of Hoist Crane SectionOVERHEAD CRANE RO PLANT 2 TON

1

1.17 7200410Certification of Hoist Crane SectionOVERHEAD CRANE SF 6 BUILDING 10 TON

1

1.18 7200410Certification of Hoist Crane SectionHOIST CRANE U#2 FDF # 1-2 7.5 TON

1

1.19 7200410Certification of Hoist Crane SectionHOIST CRANE U#2 GRF 1 10 TON

1

1.2 7200410Certification of Hoist Crane SectionHOIST CRANE U#2 GRF 2 10 TON

1

1.21 7200410Certification of Hoist Crane SectionHOIST CRANE U#2 22 METER 2 TON

1

1.22 7200410Certification of Hoist Crane SectionHOIST CRANE U#2 43 METER 6 TON

1

1.23 7200410Certification of Hoist Crane SectionHOIST CRANE U#2 -5.5 CP MOTOR 5 TON

1

1.24 7200410Certification of Hoist Crane SectionHOIST CRANE U#3 FDF 1 MOTOR 10 TON

1

1.25 7200410Certification of Hoist Crane SectionHOIST CRANE U#3 FDF 1 FAN 11 TON

1

1.26 7200410Certification of Hoist Crane SectionHOIST CRANE U#3 FDF 2 13 TON

1

1.27 7200410Certification of Hoist Crane SectionHOIST CRANE U#3 GRF 1 MOTOR 13 TON

1

1.28 7200410Certification of Hoist Crane SectionHOIST CRANE U#3 GRF 1 FAN 8 TON

1

1.29 7200410Certification of Hoist Crane SectionHOIST CRANE U#3 GRF 2 10 TON

1

1.3 7200410Certification of Hoist Crane SectionHOIST CRANE 22 METER U#3 2 TON

1

1.31 7200410Certification of Hoist Crane SectionHOIST CRANE 43 METER U#3 6 TON

1

1.32 7200410Certification of Hoist Crane SectionOVERHEAD CRANE DIESEL ENGINE BUILDING U#3/4 10 TON

1

1.33 7200410Certification of Hoist Crane SectionOVERHEAD CRANE COMPRESSOR ROOM U # 3 10 TON

1

1.34 7200410Certification of Hoist Crane SectionHOIST CRANE C/P MOTOR U#3 6.3 TON

1

1.35 7200410Certification of Hoist Crane SectionHOIST CRANE CONTROL ROOM BACK SIDE HOIST U#3 2 TON

1

1.36 7200410Certification of Hoist Crane SectionHOIST CRANE U#3 -5 M VACUUM PUMP 3 TON

1

1.37 7200410Certification of Hoist Crane SectionHOIST CRANE U#3 O/S AND C/S HOIST -5 METER 3 TON

1

1.38 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 FDF 1 MOTOR 10 TON

1

1.39 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 FDF 1 FAN 11 TON

1

1.4 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 FDF 2 10 TON

1

1.41 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 GRF 1 MOTOR 13 TON

1 EA

1.42 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 GRF 1 FAN 8 TON

1 EA

1.43 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 GRF 2 10

1 EA

1.44 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 22 METER 2 TON

1 EA

1.45 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 43 METER 6 TON

1 EA

1.46 7200410Certification of Hoist Crane SectionOVERHEAD CRANE U#4 COMPRESSOR ROOM 2 TON

1 EA

1.47 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 C/P MOTOR 5 TON

1 EA

1.48 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 CONTROL ROOM BACK SIDE 2 TON

1 EA

1.49 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 -5 METER VACUUM PUMP 3 TON

1 EA

1.5 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 O/S PUMP -5 METER 3 TON

1 EA

1.51 7200410Certification of Hoist Crane SectionHOIST CRANE U#4 C/S PUMP -5 METER 3 TON

1 EA

1.52 7200410Certification of Hoist Crane SectionOVERHEAD CRANE TURBINE HALL AUX 25 TON

1 EA

1.53 7200410Certification of Hoist Crane SectionOVERHEAD CRANE TURBINE HALL 125 TON

1 EA

1.54 7200410Certification of Hoist Crane SectionGANTRY CRANE CWP STATION 3 TO 6 30 TON

1 EA

1.55 7200410

Certification of Hoist Crane SectionHOIST CRANE U#5 FDF 1/2 7.5 Dec 2019

1 EA

1.56 7200410Certification of Hoist Crane SectionHOIST CRANE U#5 GRF 1 10 TON

1 EA

1.57 7200410Certification of Hoist Crane SectionHOIST CRANE U#5 GRF 2 10 TON

1 EA

1.58 7200410Certification of Hoist Crane SectionHOIST CRANE U#5 22 METER 2 TON

1 EA

1.59 7200410Certification of Hoist Crane SectionHOIST CRANE U#5 43 METER 6 TON

1 EA

1.6 7200410Certification of Hoist Crane SectionOVERHEAD CRANE U#5 COMPRESSOR ROOM 5 TON

1 EA

1.61 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 FDF 1 10 TON

1 EA

1.62 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 FDF 2 10 TON

1 EA

1.63 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 FDF CENTRE 7.5 TON

1 EA

1.64 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 GRF 1 7.5 TON

1 EA

1.65 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 GRF 2 7.5 TON

1 EA

1.66 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 22 METER 2 TON

1 EA

1.67 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 43 METER 6 TON Dec 2019

1 EA

1.68 7200410Certification of Hoist Crane SectionOVERHEAD CRANE DIESEL ENGINE BUILDING U#5/6 10 TON

1 EA

1.69 7200410Certification of Hoist Crane SectionOVERHEAD CRANE U#6 COMPRESSOR ROOM 5 TON

1 EA

1.7 7200410Certification of Hoist Crane SectionOVERHEAD CRANE STORE-2 BUILDING 10 TON

1 EA

1.71 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 CONTROL ROOM BACK SIDE 2 TON

1 EA

1.72 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 O/S 1 PUMP -5 METER 3 TON

1 EA

1.73 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 O/S 2 PUMP -5 METER 3 TON

1 EA

1.74 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 C/S 1 PUMP -5 METER 3 TON

1 EA

1.75 7200410Certification of Hoist Crane SectionHOIST CRANE U#6 C/S 2 PUMP -5 METER 3 TON

1 EA

1.76 7200410Certification of Hoist Crane SectionHOIST CRANE WATER TREATMENT 5/6 6 TON

1 EA

1.77 7200410Certification of Hoist Crane SectionHOIST CRANE U#1 -5.5 CP MOTOR 5 TON

1 EA

1.78 7200410Certification of Hoist Crane SectionHOIST CRANE U#2 -5.5 CP MOTOR 5 TON

1 EA

1.79 7200410Certification of Hoist Crane SectionHOIST CRANE CHLORINE PLANT 1.5 TON

1 EA

1.8 7200410Certification of Hoist Crane SectionMOBILE CRANE BQPS-I WORKSHOP & SERVICES 10 TON

1 EA

1.81 7200410Certification of Hoist Crane SectionFORK LIFTER-1 BQPS-I WORKSHOP & SERVICES 2 TON

1 EA

1.82 7200410Certification of Hoist Crane SectionFORK LIFTER-2 BQPS-I WORKSHOP & SERVICES 5 TON Dec 2019

1 EA

1.83 7200410Certification of Hoist Crane SectionFORK LIFTER-3 BQPS-I WORKSHOP & SERVICES 6 TON

1 EA

1.84 7200410Certification of Hoist Crane SectionGONDOLA-1 U#1 TO 6 BOILER 400 KG

1 EA

1.85 7200410Certification of Hoist Crane SectionGONDOLA-2 U#1 TO 6 BOILER 400 KG

1 EA

1.86 7200410Certification of Hoist Crane SectionGONDOLA-3 U#1 TO 6 BOILER 400 KG

1 EA

1.87 7200410Certification of Hoist Crane SectionGONDOLA-1 U#1 TO 6 BOILER 200 KG

1 EA

1.88 7200410Certification of Hoist Crane SectionDEAD WEIGHT RENT CHARGES INCLUDING

1 EA

1.89 7200410Certification of Hoist Crane SectionTRAVELING CHARGES(40 VISIT)

40 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10114676

SPRING; AUX HEADER SAFETY VALVE U#1/2Spring for U#1/2 Aux header safety valveType: NS 255F Y-SSize: 200 x 300Throat dia: 152 mmSeat Dia: 178 mmSet pressure: 20.6 bargBlow down: 2 barCapacity: 162700 kg/hLift: 38.0 mmValve No.: LBG10AA72Serial No.: 82F1351F2Date: 3-82Make: NAKAKITASEISAKUSHO CO. LTD, JAPAN

2 EA

PROCUREMENT OF SPRINGS FOR SAFETY VALVES OF UNIT 1-2, BQPS-1 (LLI)PR# 1400024391, FG1269/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

2 10114677

SPRING; RH SAFETY VALVE U#1/2 Spring for Reheat safety valve, U#1/2Type: PAT. 747F-SHSize: 155mmBlow pressure: 43.0 barCapacity: 166500 kg/hrThroat dia:116mmSeat Dia: 136mmBlow down P: 1.7 bargLift: 27mmJob No.: 60128-1-1Date: 1982Make: SUPERO, OKANO Valve MFG. Co., Japan

2 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10114673

VALVE; HFO 28 BAR PCV U#1/228 bar PCV for U#1/2 without actuatorType: DY-CBBE0Nominal Bore: 80ABody Rating: 40Body/Trim Material: SCPH2 / S.STLConnection: 30KRated CV: 36Serial#: 82k183kCharacteristics: M.PARATravel: 35mmAir less: OPENSupply pressure: 2.5 barSpring range: 04.-2.0 barDate: 2-82Make: NAKAKITASEISAKUSHO CO. LTD, JAPAN

1 EA

2 10114674

STEM; HFO 28 BAR PCV U#1/2Stem with plug for 28 bar PCV for U#1/2Type: DY-CBBE0Nominal Bore: 80ABody Rating: 40Body/Trim Material: SCPH2 / S.STLConnection: 30KRated CV: 36Serial#: 82k183kCharacteristics: M.PARATravel: 35mmAir less: OPENSupply pressure: 2.5 barSpring range: 04.-2.0 barDate: 2-82Make: NAKAKITASEISAKUSHO CO. LTD, JAPAN

2 EA

PROCUREMENT OF 28 BAR PCV WITH SPARES FOR UNIT 1-2, BQPS-1 (LLI)PR# 1400024393, FG1270/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

3 10114675

CAGE; HFO 28 BAR PCV U#1/2Cage/ seat for 28 bar PCV for U#1/2Type: DY-CBBE0Nominal Bore: 80ABody Rating: 40Body/Trim Material: SCPH2 / S.STLConnection: 30KRated CV: 36Serial#: 82k183kCharacteristics: M.PARATravel: 35mmAir less: OPENSupply pressure: 2.5 barSpring range: 04.-2.0 barDate: 2-82Make: NAKAKITASEISAKUSHO CO. LTD, JAPAN

2 EA

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

INSTALLATION AND COMMISSIONING OFON-LINE HYDROGEN PURITY ANALYZER AND HYDROGEN PRESSURE TRANSMITTER FOR HYDROGEN COOLED GENERATOR, UNIT-5, BQPS-1

SCOPE:

1. PRIOR TO STARTING THE INSTALLATION THE SUPPLIER SHOULD SUBMIT COMPLETE PLAN FOR APPROVAL TO GM(MAINTENANCE) OR HIS AUTHORIZED DGM/MANAGER.2. INSTALLATION, COMISSIOING AND PROPER OPERATION OF TWO SETS OF H2 ANALYSER SHOULD BE COMPLETED UP TO THE ENTIRE SATISFICATION OF USER DEPARTMENT , AS PER STANDARD.ALL SERVICES/WORKMANSHIPS AS WELL WAS SUPERVISORY SERVICE WILL BE INCLUDED IN THE BIDDER'S SCOPE.3. ALL THE INSTALLATION SHOULD BE CARRIED OUT IN A SAFE AND PROTECTIVE MANNER.4. ALL WELDING AND FABRICATION WORK SHOP INCLUDING IN VENDOR'S SCOPE.

NOTE;

1. IT SHOULD BE CLEARLY STATED THAT 80 % PAYMENT WILL BE MADE AFTER THE SATISFACTORY.COMPLETION OF INSTALLATION AND COMMISSIONING AND NO PAYMENT WILL BE ALLOWEDFOR MATERIAL DELIVERY UNTILL THE COMPLETION OF COMMISSIONING.20% BALANCE PAYMENT WILL BE MADE AT THE EXPIRY OF ONE - YEAR GURRNATEE PERIOD.

2. COMLETE SPECIFICATION AND FOR SAMPLE OF ANY MOUNTING MATERIAL FOR THE OFFERED SYSTEM SHOULD HAVE TO BE SUBMITTED FOR APPROVAL.

3. GURRANTEE PERIOD WILL COMMENCE AFTER COMPLETE AND SATISFACTORY COMMISSIONING OF THE SYSTEM.

4. ALL THE EQUIPMENT / COMPONENTS SHOULD BE SUITABLE FOR ROUNG THE CLOCK OPERATION.

INSTALLATION AND COMMISSIONING OF ON-LINE HYDROGEN PURITY ANALYSER AND HYDROGEN PRESSURE TRANSMITTER FOR HYDROGEN COOLED GENERATOR UNIT-5, BQPS-1 (LLI)

PR# 1300042112, FG1271/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

Services1 1 AU

5. THE BIDDER SHOULD ALSO QUOTE SEPARATELY FOR THE REGULAR SYSTEM MAINTENANCE ALONG WITH CONSUMABLES AS WELL REQUIRED SPARES FOR FIVE YEARS.

6. THE BIDDER SHOULD SUBMITA LIST OF CONSUMABLE AND SPARES (RECOMMENDED BY THE MANUFATURER)REQUIRED IN FIVE YEARS FOR COMPLETE SYSTEM(FOR SAFE AND RELIABLE OPERATION).

7. THE BIDDER SHOULD SUBMIT 02 SETS OF COMPLETE DRAWING OF THE OFFERED SYSTEM WITH THE QUOTATION.

8. THE SUPPLIER SHOULD SUBMIT 02 SETS OF OPERATION AND SERVICE MANUALS INCLUDING TROUBLE SHOOTING CHARTS AT THE TIME OF DELIVERY.

9. THE CONTRACT SHOULD BE CONSIDERED AS TRUNKEY BASIS, HENCE ANY ADDITIONAL MATERIAL REQUIRED FOR THE INSTALLATION/COMMISSIONING AS WELL AS CONSUMABLES WILL BE THE RESPONSIBILITY OF THE SUPPLIER UP TO COMPLETE SATISFACTORY OPERATION.

10. THE COMPLETEION OF WORKS SHOULD BE WITH IN THREE MONTHS AFTER DELIVERY OF MATERIAL.

11. DELIVERY OF MATERIAL TIME.

12. PRIOR THE SUBMISSION OF QUOTATION THE BIDDER SHOULD VISIT OUR SITE.

14. PROPER LOCAL TRANING SHOULD BE ARRANGED FOR MAINTENANCE AND OPERATION PERSONNEL AT LOCAL SIDE AFTER COMPLETION OF INSTALLATION AND COMMISSIONING.

15. DURING WARRANTEE THE SUPPLIER TECHNICAL MANPOWER WILL VISIT THE INSTALLATION AND WILL PERFORM PM, MINIMUM TWO VISTS PER YEAR.

Installation and Commissioning Of OF ON-LINE HYDROGEN PURITY ANALYZER AND HYDROGEN PRESSURE TRANSMITTER FOR HYDROGEN COOLED GENERATOR, UNIT-5, BQPS-1

SCOPE:

1. PRIOR TO STARTING THE INSTALLATION THE SUPPLIER SHOULD SUBMIT COMPLETE PLAN FOR APPROVAL TO GM(MAINTENANCE) OR HIS AUTHORIZED DGM/ MANAGER.2. INSTALLATION, COMMISSIONING AND PROPER OPERATION OF TWO SETS OF H2 ANALYSER SHOULD BE COMPLETED UP TO THE ENTIRE SATISFACTION OF USER DEPARTMENT, AS PER STANDARD. ALL SERVICES/ WORKMANSHIPS AS WELL WAS SUPERVISORY SERVICE WILL BE INCLUDED IN THE BIDDER'S SCOPE.3. ALL THE INSTALLATION SHOULD BE CARRIED OUT IN A SAFE AND PROTECTIVE MANNER.4. ALL WELDING AND FABRICATION WORK INCLUDING IN VENDOR'S SCOPE.

Services1 1 AU

NOTE:

1.IT SHOULD BE CLEARLY STATED THAT 80% PAYMENT WILL BE MADE AFTER THE SATISFACTORY. COMPLETION OF INSTALLATION AND COMMISSIONING AND NO PAYMENT WILL BE ALLOWED FOR MATERIAL DELIVERY UNTIL THE COMPLETION OF COMMISSIONING. 20% BALANCE PAYMENT WILL BE MADE AT THE EXPIRY OF ONE-YEAR GUARANTEE PERIOD.2.COMPLETE SPECIFICATIONS AND FOR SAMPLE OF ANY MOUNTING MATERIAL FOR THE OFFERED SYSTEM SHOULD HAVE TO BE SUBMITTED FOR APPROVAL.3.GUARANTEE PERIOD WILL COMMENCE AFTER COMPLETE AND SATISFACTORY COMMISSIONING OF THE SYSTEM.4. ALL THE EQUIPMENT/ COMPONENTS SHOULD BE SUITABLE FOR ROUND THE CLOCK OPERATION.

5.THE BIDDER SHOULD ALSO QUOTE SEPARATELY FOR THE REGULAR SYSTEM MAINTENANCE ALONG WITH CONSUMABLES AS WELL AS REQUIRED SPARES FOR FIVE YEARS.6.THE BIDDER SHOULD SUBMIT A LIST OF CONSUMABLE AND SPARES (RECOMMENDED BY THE MANUFACTURER) REQUIRED IN FIVE YEARS FOR COMPLETE SYSTEM (FOR SAFE AND RELIABLE OPERATION).7.THE BIDDER SHOULD SUBMIT 02 SETS OF COMPLETE DRAWING OF THE OFFERED SYSTEM WITH THE QUOTATION.8.THE SUPPLIER SHOULD SUBMIT 02 SETS OF OPERATION AND SERVICE MANUALS INCLUDING TROUBLE SHOOTING CHARTS AT THE TIME OF DELIVERY.9.THE CONTRACT SHOULD BE CONSIDERED AS TURNKEY BASIS, HENCE ANY ADDITIONAL MATERIAL REQUIRED FOR THE INSTALLATION/ COMMISSIONING AS WELL AS CONSUMABLES WILL BE THE RESPONSIBILITY OF THE SUPPLIER UP TO COMPLETE SATISFACTORY OPERATION.

10.THE COMPLETION OF WORKS SHOULD BE WITHIN THREE MONTHS AFTER DELIVERY OF MATERIAL.

11.DELIVERY OF MATERIAL TIME

12.PRIOR THE SUBMISSION OF QUOTATION, THE BIDDER SHOULD VISIT OUR SITE.

13.BEFORE SHIPPING THE CONTRACTOR SHALL ARRANGE FACTORY ACCEPTANCE TEST (FAT) BY TWO (01) K.E. ENGINEERS FOR A MINIMUM PERIOD OF 3-MAN DAYS FOR WHICH ALL THE EXPENSES SHALL BE CONSIDERED AS INCLUDE IN CONTRACT PRICE INCLUDING AIR PASSAGE, BOARDING AND TRAVELLING ETC, DAILY ALLOWANCE AS PER RULE.

14.PROPER LOCAL TRAINING SHOULD BE ARRANGED FOR MAINTENANCE AND OPERATION PERSONNEL AT LOCAL SIDE AFTER COMPLETION OF INSTALLATION AND COMMISSIONING.

15.DURING WARRANTEE THE SUPPLIER TECHNICAL MANPOWER WILL VISIT THE INSTALLATION AND WILL PERFORM PM, MINIMUM TWO VISITS PER YEAR.

1.1 7200551 1

IMPORTANT NOTES:

1.THIS OFFER SHOULD BE ACCOMPANIED WITH COMPLETE SPECIFICATIONS AND LITERATURE OF OFFERED ITEMS, ITS MAKE AND COUNTRY OF ORIGIN.

2.THE SUPPLIED MATERIAL MUST BE NEW AND BRANDED.

3.THE DELIVERY PERIOD SHOULD NOT BE MORE THAN TWO MONTHS AFTER ISSUANCE OF P.O

4.THE GUARANTEE PERIOD WILL COMMENCE AFTER APPROVAL OF THE DELIVERED ITEMS.

5.DURING ONE YEAR OF GUARANTEE PERIOD THE SUPPLIER SHALL REPLACE THE UNIT WITH THE NEW ONE.

6.THE WARRANTEE PERIOD SHOULD BE OF TWO YEARS.

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT1 Services SERVICES, ENGINEERING & IMPLEMENTATION 1 AU

Engineering & implementation softwareSOFTWARE FOR REPLACEMENT OF 1200 POINTS BASED ONLINE SOE/ DLS AT UNIT-02, BQPS-I

1 JOB

SCOPE OF WORK

a.ENGINEERING, IMPLEMENTATION & REPLACEMENT OF EXISTING PLC BASED HARDWARE/ SOFTWARE BY DCS BASED SYSTEMb.AT LEAST 2 YEARS ARCHIVING/ LOGGING OF ON-LINE DATA OF SOE INTO PC WITH AUTO SAVE IN EXCEL FORMAT FOR RETRIEVAL UPON REQUIREMENT

SCOPE OF ENGINEERING & SERVICES :1.ENGINEERING, SERVICES & REPLACEMENT OF EXISTING PLC BASED HARDWARE/ SOFTWARE OF DLS (SOE) BY DCS BASED SYSTEM. EXISTING SYSTEM DETAILS ARE AS FOLLOWS:GE FANUCPACSYSTEMS RX7IDI CARDS: IC697 VDD100

2.LOGGING OF ON-LINE DATA OF DLS INTO PC WITH AUTO SAVE IN XL FORMAT FOR RETRIEVAL UPON REQUIREMENT.

3.ONLINE PC DISPLAY & STORAGE DLS DATA (PLANT PROCESS) IN READABLE FORMAT SHOULD HAVE FOLLOWING FEATURES:

a.SERVER-CLIENT BASED ARCHITECTURE SHOULD HAVE REDUNDANT CONTROLLERS, REDUNDANT OPERATION SERVERS AND ARCHIVE HISTORIAN ALONG WITH REDUNDANT COMMUNICATION LINKS.

SERVICES, ENGINEERING & IMPLEMENTATION SOFTWARE FOR REPLACEMENT OF1200 POINTS BASED ONLINE SOE/ DLS AT UNIT-02, BQPS-I

PR# 1300040694, FG1272/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

b.ENGINEERING SERVER SHOULD ALSO BE IN SAME DOMAIN & PART OF ARCHITECTURE.c.CORRECT TIME STAMPING SYNCHRONIZATION VIA GPS CLOCK.d.AT LEAST 02 YEARS ARCHIVE/ LOG AVAILABILITY WITH TIME/ DATE, EVENT DESCRIPTION AND D-CODE (DLS POINT NO.) IN EXCEL WITH DAY-WISE FILLING IN HARD-DRIVE OF PC (PRE-DEFINED PATH)e.SYSTEM CAN SUPPORT UP TO 5,000 I/OS WITH 1 MS SAMPLING RATE, SO THAT USER CAN ADD MORE I/OS IN FUTURE AS & WHEN REQUIRED BASIS.f.CABINET POWER SUPPLY & TEMPERATURE MONITORING SHOULD BE INCLUDED.g.ANALYSIS & TREND TOOLS SHOULD BE STRONG FOR DETAILED ANALYSIS.h.COMPATIBILITY OF NEW HARDWARE/ SOFTWARE WITH ABB SYMPHONY PLUS DCS

i.LEVEL OF AUTHORITY MUST BE ASSIGNED FOR SECURING HARD DRIVE DATA WITH FOLLOWING LOGINS:4.OPERATOR LOGIN WILL ONLY PROVIDE ACCESS OF FRONT VIEW SCREEN WITH SOFT KEYBOARD AND OPERATOR CAN ALSO ACCESS TO VIEW LOG/ DATA WITH TIME/ DATE AND D-CODE FILTRATION OR VIA SCROLLING ON FRONT VIEW OPERATOR SCREEN.

5.ADMINISTRATOR LOGIN (I&C) - BEING SYSTEM ADMIN SHOULD HAVE FULL ACCESS OF THE ENTIRE SYSTEM.

TERMS AND CONDITIONS FOR SUBJECT SCOPE:

6.BIDDER SHOULD GET APPROVAL FROM END-USERS IN CASE OF LOCAL COMPONENTS.

7.BIDDER SHOULD VISIT SITE PRIOR TENDERING TO UNDERSTAND THE SCOPE OF THE PROJECT.

8.BIDDER WILL PROVIDE AT LEAST THREE (03) SETS OF DOCUMENTATION IN SOFT (DVDS) & HARD COPY FORM. DOCUMENTATION INCLUDES SOPS, OPERATION/MAINTENANCE MANUALS, LOGICS, MIMICS, WIRING DIAGRAMS, ARCHITECTURE DIAGRAM, BILL OF MATERIAL (BOM) WITH COMPLETE SPECIFICATIONS/ DATA SHEET OF EACH COMPONENT, TRAINING/ PRESENTATION DOCUMENTS FOR OPERATION AND I&C ENGINEERS ETC.

9.SUPPLY OF INDUSTRIAL GRADE PCS, HARDWARE, SOFTWARE (INCLUDING LIFE-TIME LICENSE IN KE NAME), BACKUP DVDS, COMMUNICATION CABLES ETC. WILL BE UNDER SCOPE OF BIDDER.

10. SUPPLY OF MATERIAL, DESIGN, ENGINEERING, INSTALLATION, COMMISSIONING & TESTING OF SUBJECT PROJECT WILL BE UNDER SCOPE OF BIDDER.

11.ANY FIXTURE OR FURNITURE FOR PC/ PRINTER WILL BE UNDER BIDDER SCOPE.

72001111.1

WARRANTY:

12.BIDDER WILL PROVIDE WARRANTY AND FREE SERVICE FOR TWO (02) YEARS FOR TROUBLE FREE RUN OF THE SOE/ DLS.

13. DURING WARRANTY PERIOD, SUPPLY OF HARDWARE & SOFTWARE SHALL ALSO BE UNDER SCOPE OF BIDDER.

FAT SCOPE:

14.BIDDER WILL ARRANGE FAT AT FACTORY FOR COMPLETE SYSTEM & WILL PROVE 1 MS SCAN TIME OF SOE BASED SYSTEM.

15. BIDDER WILL PROVIDE ALL FAT DOCUMENTS PRIOR COMMENCEMENT AT FACTORY.

TRAINING SCOPE:16. AT LEAST TWO (02) DAYS PROFESSIONAL & PRACTICAL TRAINING FOR FOUR (04) I&C AND FOUR (04) OPERATION ENGINEERS AT SITE FOR THIS SYSTEM SHALL BE UNDER SCOPE OF BIDDER.17. TRAINING KITS FOR I&C AND OPS TO PROVIDE BY THE BIDDER AT THE TIME OF TRAINING AT SITE - ONE SET FOR I&C AND ONE SET FOR OPERATION.

PAYMENT TERMS:10% - ADVANCE PAYMENT30% - DELIVERY OF MATERIAL AT SITE40% - AFTER SUCCESSFUL COMMISSIONING OF COMPLETE SYSTEM & HANDING OVER TO END USER20% - AFTER COMPLETION OF WARRANTY PERIOD

2 Services REPLACEMENT OF SOE2.1 REPLACEMENT OF SOE 1 AU

SR. # KE MATERIAL CODE ITEM DESCRIPTION QTY UNIT

1 10034237

GAUGE; PR. 0~10BAR DIAL: 160MMNAME: PRESSURE GAUGERANGE: 0 ~ 10 BARDIAL SIZE: 160 MMCASE FILLING FLUID: GLYCERINEALL STAINLESS STEELSUITABLE FOR CORROSIVE MEDIA AND ENVIRONMENTPROTECTION CLASS: IP65DIAL: WHITE ALUMINIUM WITH BLACK LETTERINGPOINTER: ADJUSTABLE BLACK ALUMINIUM POINTERWINDOW: INSTRUMENT GLASSMAKE: WIKA, GERMANY

10 EA

PROCUREMENT OF PRESSURE GUAGES FOR DEMIN PLANTS AND BOILER DOSING PUMPS, BQPS-1PR# 1400024397, FG1272/BQ1, Tender Cost Rs. 2000/- To Be Opened on 29.07.2019

2 10028696

GAUGE; PR. 0~25BAR TYPE: 232-30-160NAME: PRESSURE GAUGEALL STAINLESS STEEL SUITABLE FOR CORROSIVE MEDIA AND ENVIRONMENTRANGE: 0 ~ 25 BARTYPE: 232-30-160DIAL SIZE: 160MMPROTECTION CLASS: IP 65CONNECTION: THREADED 1/2"" BOTTOMPOINTER: ADJUSTABLE BLACK ALUMINIUMWINDOW: INSTRUMENT GLASSMAKE: WIKA GERMANY

12 EA

3 10009975

GAUGE; PR. 0~40BAR, 100MM, LIQUID FILLEDNAME: PRESSURE GAUGERANGE: 0 ~ 40 BARDIAL SIZE: 100 MMCASE FILLING FLUID: GLYCERINEALL STAINLESS STEEL SUITABLE CORROSIVE MDEDIA AND ENVIRONMENTPROTECTION CLASS: IP 65POINTER: ADJUSTABLE BLACK ALUMINUIMWINDOW: INSTRUMENT GLASSCONNECTION: 1/2" BOTTOM THREADEDMAKE: WIKA, GERMANY OR EQUIVALENT

16 EA

www.ke.com.pk

Tender document containing detailed scope of work, terms and conditions may be obtained on payment of tender fee (non-refundable) from theundersigned.KE reserves the right to reject any or all the bids and to annul the bidding process at any time without thereby incurring anyliability to the affected bidder(s) or any obligation to inform the affected bidder(s).

Note:− Quote with the reference of the RFQ serial number and men on specs accordingly− Detailed relevant Technical literature (English) must be submi ed with bid.− Quote original make & origin of all above items.− Incomplete quota ons shall not be considered for technical evalua on.− Vendors interested to par cipate in the aforesaid tender may obtain RFQ by purchasing the tender document from 1st Floor, Procurement Division (Support Building), Block-J, Elander Road (Power House) Complex, Karachi, Pakistan

General Manager (Procurement Supply Chain)[email protected]

1st Floor, Procurement Division (Support Building), Block-J,

Incoterm: Ex-works/ FOB / CFR Karachi / FOR Plant SiteQUOTATION WILL NOT BE ACCEPTED AFTER THE GIVEN DEADLINE DATE

Payment Term: Delivery Period:Validation: 120 Days