TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ......

20
J&K MINERALS LIMITED (A J&K Government Undertaking) 5 th Floor, Jawaharlal Nehru Udhyog Bhawan Rail Head Complex, Jammu. TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE TO PARLANKA GYPSUM PROJECT DISTT. RAMBAN (J&K) NIT NO: Mgr(P&S)/J/16-780 DT: 30.12.2015 DUE ON: 25.1.2016

Transcript of TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ......

Page 1: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

J & K M I N E R A L S L I M I T E D (A J&K Government Undertaking)

5th Floor, Jawaharlal Nehru Udhyog Bhawan Rail Head Complex, Jammu.

TENDER DOCUMENT

FOR

SUPPLY OF WEIGH BRIDGE

TO

PARLANKA GYPSUM PROJECT

DISTT. RAMBAN (J&K)

NIT NO: Mgr(P&S)/J/16-780 DT: 30.12.2015 DUE ON: 25.1.2016

Page 2: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

CHAPTER I

SCOPE OF SUPPLY

FOR

WEIGH BRIDGE

Page 3: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

SCOPE OF SUPPLY IS AS UNDER:

Design engineering, manufacturing, testing, inspection, supply, erection, Commissioning and

stamping of 60 MT Pit-less Type Electronic Road weighbridge complete with kit, Indicator, load

cells, platform, LED display, P.C, Printer, UPS etc. with Manufacturers test certificates and Third

party Inspection as per the technical specification and technical data sheet. The entire job is to be

undertaken on Turnkey basis covering mechanical, civil & Electrical works including supply of all

required material for civil construction & electrical works.

Bidder shall possess the requisite manufacturing & testing facilities and experience & expertise to

manufacture and supply the weigh bridge.

Address of location where materials are to be supplied as under:

J&K Minerals Ltd.,

Gypsum Project,

Village: Sumerbhadog, Parlanka,

District: Ramban (Jammu Division)

State: J&K.

CONTACT: Manager (P&S). Mr. G.N.Chechi. + 919419122689. DELIVERY PERIOD:

Delivery period shall be as under:

01 (one) month and maximum 2 (two) months from the date of fax of LOI.

Page 4: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

CHAPTER II

TECHNICAL SPECIFICATIONS

FOR

WEIGH BRIDGE

Page 5: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

TECHNICAL SPECIFICATIONS FOR WEIGHBRIDGE

I. GENERAL

a) Vendor shall supply weigh bridge in accordance with the weigh bridge specification

sheets along with Auxiliaries, if any, wherever specified in the specification sheets,

subject notes and other enclosure to the requisition.

b) Vendor shall quote in strict accordance with the weigh bridge technical specification

and all other enclosures to the requisitions.

c) All codes and standards for manufacture, testing, inspection etc. shall be of latest

editions.

II. DOCUMENTATION

a) Vendor shall submit with the offer ( in 1st cover) the following:

b) Manufacturer‟s complete descriptive and illustrative catalogue/literature.

c) Detailed Dimensions, Cross Section drawing with parts/Material List, Weight etc. For the

weigh bridge to Manufacturer‟s standard.

d) Drawings for Weigh Bridge with Accessories Like Load cells, Platform giving Major

salient dimensions.

e) One copy of the entire specifications of this specifications for Weigh Bridge signed as

“Accepted “by the manufacturer. If the weigh bridge specification is regretted the

manufacturer shall write clearly on weigh bridge specification sheets as: “Regret”.

f) Upon failure to submit document as specified in above clauses, the offer is likely to be

rejected.

III. Upon placement of LOI/purchase order, whichever is earlier, vendor shall submit

drawings for approval mentioned above within 7 days from date of LOI, before start of

manufacture.

IV. Test reports shall be prepared and provided for all mandatory tests as per the applicable

code and QAPO/ITP duly approved by JKML.

V. Material Test Certificates (Physical properties, chemical composition & Heat Treatment

Report) parts shall be furnished in adherence to applicable codes/ standards and QAP/

ITP duly approved by JKML for the weigh bridge supplied. Material Test Certificates for

the other parts shall also be furnished for verification in accordance with JKML, approved

QAP/ITP during third party inspection.

Page 6: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

VI. DESIGN AND CONSTUCTION

Weigh bridge shall be designed, manufactured, tested inspected and marked as per the

manufacturing standard, design code and standards (Latest edition) indicated in the weigh

bridge specification sheets. Any conflict between the requisition, enclosure, specification

sheets and referred standard code shall be brought to the notice of the purchaser for

clarification, but generally specification sheets and enclosures of the requisition including

subject notes shall govern. No deviation to specification / Standards shall be permitted

through vendor drawing approval. Approval of drawing shall be valid only for design

features.

VII. TECHNICAL SPECIFICATION OF ELECTRICALLY OPERATED WEIGH BRIDGE

(AUTOMATION TYPE)

TECHNICAL DATA SHEET PRECISION LOAD CELL

Capacity Minimum 30 Tons

Minimum No. of Load cell Minimum 6 (six) Nos.

Excitation Digital:10-12 AC/DC,Analog-5V Dc

Input Resistance 560-620 OHM

Output Resistance 480 OHM Nominal

Rated output 1.75 ,V/V to 2mV/V

Zero Balance 1% of Rated output

Combined Error 0.02% of Ratged output

Repeatability 0.010% of Rated output

Return to Zero after 30 minute creep period at

Rated output

0.015% of Rated output

Temprature effect on rated output

(-10 °C to +55 °C)

0.0010% /0C of Rated Output

Temprature effect on Zero balance (-10 °C to +55 °C)

0.0009% /0C of Rated output

Insulation Resistance (minimum) 5000 Mega OHMS

Overloading rating without affecting Performance

150% of rated Capacity

Overload Rating (Ultimate) >225% Rated Output

Resistance to Dirt & Moisture Hermetically sealed conforms to IP 68.69,welded,Filled with inert Gas

Material Stainless Steel

Non-Linearity <0.01

Page 7: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

Hysteresis <0.0165

TECHNICAL SPEFICIATIONS Of WEIGHBRIDGE INDICATOR

MICROPROCESSOR BASED SYSTEM

Display

Type

Blue backlit LED, graphics up to 64x240 pixels, display upto 8 digits, minimum character

size 17mm x 10mm

Annunciators

Balance (Gross Zero),Motion Preset Tare, semi-automatic Tare,Net,Kg.print,3 off Trip

indicators, Minus (below net zero), scale 1, Scale 2, Peak,Print,OPI,OP2, OP3 count.

Unit of Measure

Kg.T

Tare

>100% subtractive

>Semi-auto (push button)tare

>Pre-set (key board) tare

>Stored tare

Keypad

> 28 Keys addressing with tactile feedback

> Five soft function keys and dedicated function key and operational key (zero, Tare, Slect,

Print, Units, Totals, Scale, PLU, Stand by, Enter, Escape, Clear, Text)

Real time clock

Battery backup, real time clock

Connection

6 core technique

Serial interface

Two bi-directional asynchronous serial interface card (Rs 232 / 485/422 or Rs 232 / 20mA

current loop) for remote display. RTU modbus.

Parallel Port

Parallel data interface for printer connection.

Trips

Page 8: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

Upto 16 input & output trips rated at TLL level & 240 V and 2 A resply.

Digital input

Connects to load cells, require junction box and digital option card

IP Rating

IP 67 rated stainless steel housing

Housing

Panel type (front panel) or stainless steel housing

Mounting

Wall/desk

Electrical power input

110V AC-230V + 10%-15% @ 460mA.50Hz

Operating temperature

0°C to 50°C

Analog Input Range

0mV to 20mV

Analog to Digital converter

>Type – delta sigma

>Rate-120 per second

>Display update- 1,2,5,10 second

Filter

>Programmable FIR & Dynamic Filtering

>Harmonoizer digital filter

Balance/Zero

>Setting-keyboard push button

>Range- Normally 2% upto 100%

>Zero tracking-Configurable

>Motion Detection- Configurable

Calibration

> Full digital ten point calibration

Performance

> Internal Resolution: 16,777,216

>Repeatability

+/-0.01% of full scale

>Span drift

+/-50ppm /year max.

+/-4ppm/°Ctypical

>Warm up time: Immediate

Page 9: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

>Self diagnostics: Graphic display

Keys, PS/2Keyboard

A2D(x2)Serial test (3) Network Interface Ethernet port

BCD Out

Analogue out

Pulse in

Memory-Back up of 6 months

Tally Roll

Internal 1/0-fully configurable

External 1/0-fully configurable

Digital optional card to provide additional serial port

Modbus /profibus /device net/control net interface

Ethernet 10/100TCP/IP Interface for data transfer

Analogue option card to provide second analogue scale input & two analogue

output 4-20mA.

VIII. TECHNICAL SPECIFICATION WEIGH BRIDGE:

a) WEIGHBRIDGE TYPE: Pit- less, fully Electronic Road Weigh Bridge

b. CAPACITY : 60 MT

c. LEAST COUNT: 10 Kg.

d. PLATFORM SIZE: 16m x4m

e. PLATFORM CONSTRUCTION: Fully welded module type M.s Structure to meet Indian

standard IS: 800,2062 comprising of RS Joists, transoms and plates for example main

beam IS MB 500 -2 Nos., Cross beam ISMB-250 Across wheel path – 4 Nos., ISMB-200

Nos joint to be used in the beams to avoid sagging of the structure 12mm thick antiskid to

be provided. M.S checkered plate on top.

f. PAINTING OF STRUCTURE: EPOXY to meet IS: 2074.

g. LOAD CELL: upto 10 Nos.(Min.6) as per attached data sheet. Hermetically Sealed Unit,

capacity - 30Tons. Each, Ambient temp.-55°C max Safe load-125% of capacity. Ultimate

Load-300% of capacity. Destructive Load-500% of capacity.

h. INDICATOR: as per attached data sheet for same.

I. JUNCTION BOX & CABLE: Stainless steel with IP65 protected and required length of steel

breaded, 6 core, Load cell cable from power panel and load cells to junction Box & junction

Box to Indicator.

Page 10: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

j. COMPUTER: 1 No. PC, P-V,5 GB RAM, 500 GB HDD,DVD COMBO/WRITER, 22” Colour

LCD Monitor with latest window & antivirus loaded , Key Board (Recent edition) & cordless

Mouse.

MAKE: HP.

k. PRINTER: 2 Nos. Model LX 300 + Type Dot Matrix with 80 columns, one for Indicator &

other for P.C.Make – HP.

l. UPS: 1 No. 1000VA, with 2.00 Hr. battery backup, Make- Exide.

VOLTAGE STABILIZER/TRANSFORMER: 2KVA servo transformer with input voltage 140v

to280 volts and output 220+ 5% of reputed make to protect the equipment from voltage

variation.

m. SOFTWARE FOR WEIGHBRIDGE MANAGEMENT: Complete for weighbridge management

user friendly software for processing data date wise, truck -wise, challan wise, shift wise,

customer wise etc. for generation of daily/ weekly & monthly report. Preparing transport permit,

Invoice etc. as per our requirement. All the required information for developing the Soft ware

shall be provided by us.The software should be compatible for integrating with Terminal

Automation system software and migration of data.

n. CIVIL JOB: Civil job shall include total civil foundation with M-25 RCC as per the drawing for

the platform, approach ramps and other equipments. Construction of weigh House is excluded

from the scope of work.

o. ELECTRICAL JOB: All electrical job connection from Weigh Bridge to our automation control

room or as advised by EIC HPCL and laying of the cables for complete integration of the

weighbridge. Providing all required socket, switch, cable, junction box, of good quality to be

used for Weigh Bridge.

p. EARTHING: Providing earthing as per IS-3043.

q. SUPERVISION OF ERECTION, STAMPING & COMMISSIONING OF THE WEIGH BRIDGE:

Supervision & execution of civil work, erection and commissioning, liaisoning with the inspector

of Legal metrology department (weight and Measure Deptt.) Govt. of J&K for verification and

stamping of weigh bridge and also paying the required fee to legal Metrology of WM

Department.

r. DRAWINGS AND MANUAL: The supplier must provide three sets each of the following

manuals and drawings along with soft copies in pen drives and CDs.

i. OPERATION MANUAL: Three sets of operation manual must be provided by the supplier

which must cover , interalia, the principal features of the machine, the control philosophy

used, prestarting checks, starting procedures, operation procedure, Dos and DONTs, trouble

shooting, emergency procedures, safety trips etc.

Page 11: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

ii. MAINTENANCE MANUAL: Three sets of maintenance Manual must be provided by the

supplier which include maintenance procedure, preventive maintenance schedule and tolerance

limit etc. The maintenance manual should contain dismantling and assembling procedure.

iii. SPARE PARTS MANUALS:

The manual must contain, interalia, spare part details such as drawing no. part no. and

technical specification of all the mechanical and electronic equipments.

The Scope of third Party Inspection shall include the following as minimum requirements. All the

below tests shall be witnessed by TPI-100%:

The List of such Tests shall include the following as a Minimum:

1. Physical & Visual Inspection of all components & parts of Weigh Bridge – 100%.

2. Dimensional Inspection of Weigh Bridge -100%.

3. All weigh bridge shall be tested as per technical specification.

4. Physical checking of operation of the weigh bridge.

5. Operation time.

6. Verifying the test certificates.

7. Readings of load in display unit & Memory back up in PC.

8. Measurement of platform length.

9. Operation of load cells.

10. Operations of the weigh bridge.

11. Thickness of sheet used for control panel.

12. Control Panel wiring with standard wiring

13. Review of routine test report of supplier.

14. Review of manufacturer‟s test certificates for the load cells.

15. After assembly, the weigh bridge shall be subject to the following tests:

a) PERFORMANCE/ FUNCTIONAL TEST:

On application of load on the platform &Transmission to load cells in the following

sequence:

100% of capacity

125% of capacity

300% of capacity Quantum of checks 100%.

b) Manufacturer Test certificate of the weigh bridge & its various components, Indicating

details of materials for individual items & scope of inspection indicted above shall be

Page 12: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

provided along with supplies. Also verification of material of construction (through Mill test

report).

Quantum of check: 100%

c) Cyclic load test on load cells and stress/fatigue analysis of each type shall be done which

will be witnessed by TPIA & the certificates shall be offered for verification during

inspection.

Quantum of check 100%

d) Bending moment test for platform shall be done and witnessed by TPIA. The certificates

shall be offered for verification during inspection

Quantum of check: 100%

e) Certificate for chemical analysis of load cells & Platform Materials

Quantum of check: 100%

f) Any other Mandatory or supplementary tests.

Page 13: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

CHAPTER III

TERMS AND CONDITIONS OF NIT

FOR

WEIGH BRIDGE

Page 14: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

TERMS & CONDITIONS:

1. SUBMISSION OF TENDERS.

i. The tender(s) should be addressed to the Managing Director, J&K Minerals Limited,

Jawaharlal Nehru Udhyog Bhawan, Rail Head Complex, Jammu and should reach his office

on or before 25.1.2016 by 4.00 p.m Tender(s) received late by hand or by post shall not be

entertained.

ii. The tenders shall be submitted under two cover system as cover 1st and cover 2nd as

under:-

Cover 1st Shall contain Earnest Money Deposit in the shape of CDR/FDR or Bank

Guarantee and technical specifications and shall be opened first.

Cover 2nd Shall contain price bid. The sealed envelope containing both the two covers

should be super–subscribed as “TENDER FOR ELECTRONIC WEIGHBRIDGE “

iii) Conditional tenders such as “Subject to market fluctuations” etc shall be rejected. 2. OPENING OF TENDERS:

1st cover of the offers received shall be opened by the Tender opening committee TOC) on

28.1.2016 at 4.00 p.m or any other subsequent date convenient to the TOC in presence of

tenderer(s) who may wish to remain present at the time of opening of tenders. After scrutiny of

1st cover, price bids (i.e. 2nd cover) of qualified/eligible tenderers shall be opened.

3. TENDER ACCEPTANCE:

The acceptance/approval of the tender will rest with the Managing Director, J&K Minerals

Limited, Udhyog Bhawan, Jammu who does not bind himself to accept the lowest tender and

reserves to himself the authority to reject any or all of the tenders received without assigning

any reason(s). Conditional tenders shall be out rightly rejected.

The Managing Director, J&K Minerals Limited, Udhyog Bhawan, Jammu also reserves the right

of accepting the whole or any part of the tenders received and the tenderers shall be bound to

perform the same at the quoted rates.

4. COMPLETION TIME:

The complete job on turnkey basis shall be completed within 30 days maximum 60days from the

date of issue of letter of intent/work order.

Page 15: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

5. RATES:

The rates quoted shall be FOR site, which will include the cost of transportation of materials to

the site, storage and security at site, all handling at site and incidental expenses and all taxes

i.e. entry tax, VAT, service tax, Income tax etc.

6. PRICE ESCALATION:

No cost escalation on any account shall be entertained in the quoted rates and the rates

quoted shall be firm and final and shall remain valid till the completion of the contract.

7. INCOME TAX AND SERVICE TAX:

Service Tax and Income Tax as applicable under law shall be deducted from total value of

the contract.

8. PRE DESPATCH TESTING / INSPECTION (THIRD PARTY INSPECTION).

The pre-dispatch testing / inspection of the equipment shall be got done by the third party i.e.

by M/S RITES or Bureau of India Standard (Govt. of India). The charges for the same shall

be borne by the firm in the first instance which shall subsequently reimbursed by the

Corporation.

9. TERMS OF PAYMENT: The payment of the contractor shall be released as under:

i) 90% payment shall be made after successfully testing and commissioning of the

complete job.

ii) Balance 10% payment shall be kept as deposit and shall be released after successful

completion of the warranty period of 18 months.

10. EARNEST MONEY:

i). The earnest money amount to Rs.50000 (Rupees fifty thousand only) shall be in the

form of CDR/FDR of a nationalized /scheduled Bank having branch in Jammu issued in

favour of Financial Advisor & Chief Accounts Officer, J&K Minerals Limited, Udhyog

Bhawan, Jammu. The CDR /FDR shall be valid for 12 months or more after the last

date of receipt of bids or after the submission of performance security whichever is

later.

ii) The Bid not accompanied by an Earnest Money shall be out rightly rejected.

iii) If in case contractor failed to start/complete the work, within the stipulated time period, his

CDR/Earnest Money shall be forfeited after termination of the contract. Besides

defaulting contractor shall be debarred from taking works in the Department at least for

one year.

Page 16: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

iv) Earnest money deposit shall be released after successful completion of the contract and

verification by the competent authority. However, the earnest money of unsuccessful

tenderers shall be released after finalization of the tender.

11. PENALTY:

In the event of contractors failure, neglecting declining or delaying the supplies/installation or

in the event of any damage occurring or being caused or in the event of any default or failure

in complying with any of the terms and conditions of the contract, the corporation shall with or

without prejudice any other remedy available to it under any law for the time being in force in the

State:

a) Terminate the contract after 10 days notice.

b) Recover the amount of loss caused by damage failure or default including the

consequential damage as may be determined by the department and /or

c) Recover the extra cost, if any, involved in allotting the contract to other party and /or

d) Impose a penalty in form of liquidated damage on accounts of delay beyond the scheduled

delivery period subject to 0.25% value of the contract per fortnight and not exceeding 5%

value of the contract and/or

e) Forfeiture of earnest money/security deposit.

12. WARRANTY PERIOD:

18 months after successful installation, Testing and commissioning of the complete job.

13. INDEMNITY:

The contractor shall make the corporation harmless and shall settle all compensation claims

arising as a result of accidents/ natural clamity etc. aforesaid during the execution of the

works at his own cost.

14. DAMAGE TO WORKS DURING OR AFTER EXECUTION:

If the contractor or his workers break, deface, injure or destroy any part of the structure or

other property in the vicinity of the works belonging to any person in or on which they may be

working, such structure, road kerbs, embankments, fence enclosure, water pipes, cables,

drains, electrical or telephone posts, or wares, trees, grass or grassland or cultivated ground

contiguous to the premises on which the work or any part of it is being executed shall make

the same good at his own cost and in default, the Engineer-in-charge shall cause the same

to be made good and deduct the cost thereof from any sums that may due to the contractor

under this contract or from his security deposit for other works under the Department.

15. MATERIALS, PLANTS & APPLIANCES:

The contractor shall arrange at his cost all materials, plants, tools, appliances and temporary

works required for the execution of the works.

Page 17: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

16. FORCE MAJEURE:

Any failure or omission to carry out the provisions of the contract shall not give rise to any

claim by the department or the approved supplier/ contractor one against the other if such

failure or omission arises form an “Act of God” which shall include all natural calamities such

as fires, earthquakes, floods, hurricanes, strikes, riots, embargoes or from any political or

other reasons beyond the control of parties including war, whether declared or not, civil war

or a state of insurrection.

17. SUBLETTING:

The contractor shall not assign or sublet the works in whole or part and incase the contractor

assigns or sublets the contract or attempt to do so. The contract will be terminated and

actions as deemed fit shall be taken by the department.

18. WATCH & WARD OF EQUIPMENT/MATERIAL:

The contractor shall be responsible for the watch and ward of his equipment/materials

aforesaid. In case of any loss or damage to the said equipment/material etc. on any account,

the contractor shall make good the loss or replace the deteriorated material at his cost and

expenses and the department shall in no case be liable to pay any compensation.

Currency of bid and payment: The rates and prices shall be quoted by the bidders entirely in

Indian Rupees. Accordingly, all payments shall be made in Indian Rupees.

19. JURISDICTION OF COURT:

For any dispute arising out of this contract the Hon‟ble High court of Jammu & Kashmir at

Jammu only shall have jurisdiction.

20. ARBITRATION:

If at any time any doubt, question, dispute or difference whatsoever shall arise between the

contractor and the corporation upon or in relation to or in connection with the contract, either

of the parties may give the other notice in writing of the existence of such doubt, question,

dispute or difference and the same shall be referred to the Managing Director, JKML for

arbitration under the Jammu and Kashmir arbitration Act and all rules framed there under.

The decision of the arbitration thereon shall be final, conclusive and binding upon the parties.

The contractor shall not delay the carrying out of the works or any part thereof by reason of

any reference to arbitration and shall proceed with the works with due diligence and shall

until decision of the arbitrator abide by the decision of the Managing Director or his

representative duly conveyed by him.

21. INSURANCE:

The contractor shall at the time of execution of the agreement insure at his cost the works

and keep them insure until the virtual completion and taking over of the works by the

Department against accident, loss or damage by fire, flood, earthquake etc in any office to be

Page 18: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

approved by the department in the joint name of the former being placed first in the policy for

the amount of works.

22. DEFECT LIABILITY PERIOD:

Any defects developed within defect liability period of 18 months from the date of completion

will have to be rectified by the contractor. In case of failure to do so, management of JKML

shall get the rectification work done by some other agency at the risk and cost of the

contractor. The rectification of such defects shall be taken immediately on receipt of written

notice of Corporation and such defects may extend “Liability Period” if these are not taken up

immediately.

23. TESTING:

All types of routine and other tests shall be carried out at the works by the contractor or the

manufacturers of the components. The corporation shall be free to witness any or all tests if

they so desire. On the completion of the installation the contractor shall arrange to carry out

various tests in the presence of and to the complete satisfaction of Engineer-in-charge. Any

defect or shortcomings found during the tests shall be speedily rectified or made good by the

contractor at his own expenses.

24. MAINTENANCE OF THE PLANT AND TRAINING OF PERSONNEL:

The contractor shall arrange to provide at no extra cost necessary personnel and material to

carry out all routine and special maintenance of the plant as required regularly for a period of

(18) eighteen months Warranty Period starting from the date of virtual completion of project

including weekly inspection by contractor or his technical representative during warranty

period.

The contractor shall also train the Department „s personnel to operate the plant and carry out

routines checks for a period to Two months from the date of successful commissioning of the

machinery. During the period of installation and testing, if found necessary, the contractor

shall train such personnel at his works at no extra cost to the Department.

25. AFTER SALE SPARE AND SERVICE BACKUP.

Preference shall be given to the firm who has:-

I) After sale spare and service backup in the state of J&K and are holder of valid license from Weights & Measures Deptt. J&K

II) Successfully supplied and commissioned the good number of weighbridge in other Govt. Deptt. / Institution in the State of J&K.

Page 19: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

26. PERFORMANCE GUARANTEE:

The contractor shall guarantee that the weigh bridge 60MT as installed shall perform

successfully with specified accuracy as per the specified technical specifications. The

contractor shall also guarantee that the performance of various equipments individually shall

be as per its designed capacity. Also actual power consumption shall not exceed the quoted

rating.

27. AGREEMENT:

The contractor shall have to draw an agreement with the Department within seven (07)

days from the date of issue of work order. The agreement should be accompanied with a

copy of the work order, each page of which shall be duly stamped and signed by the

contractor to form part of the agreement.

Page 20: TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE … · TENDER DOCUMENT FOR SUPPLY OF WEIGH BRIDGE ... shall be provided by us.The software should be compatible for ... All weigh bridge

SCHEDULE OF QUANTITIES

Item No.

Description Qty. Unit

1. SUPPLY OF 16M X 4M OF 60 MT PITLESS TYPE ELECTRONIC ROAD WEIGHBRIDGE COMPLETE WITH REQUIRED COMPONENTS NAMELY, KIT, INDICATOR, LOAD CELLS, PLATFORM, LED DISPLAY, P.C. PRINTER, UPS ETC. AS PER ATTACHED TECHNICAL SPECIFICATIONS & SCOPE OF SUPPLY.

1 Each

2. SUPERVISION, CONSTRUCTION OF FOUNDATION, INSTALLATION, CALIBRATION, STAMPING & COMMISSIONING OF WEIGH BRIDGE

1 Each