Temporary ShoringSpecifications, Applications, & Best Practices
Stephen M. (Matt) Revell, P.E.Assistant Geotechnical Engineer ALDOT Bureau of
![Page 2: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/2.jpg)
Temporary ShoringSpecifications, Applications, & Best Practices
![Page 3: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/3.jpg)
Temporary ShoringSpecifications, Applications, & Best Practices
![Page 4: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/4.jpg)
Temporary ShoringSpecifications, Applications, & Best Practices
![Page 5: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/5.jpg)
Presentation Objectives
• Objectives of Temporary Shoring
• ALDOT’s approach
• Our arsenal
![Page 6: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/6.jpg)
Objectives of Temporary Shoring
26’
0.7 x 26’ = 18’
![Page 7: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/7.jpg)
Objectives of Temporary Shoring
![Page 8: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/8.jpg)
Objectives of Temporary Shoring
![Page 9: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/9.jpg)
Objectives of Temporary Shoring
What does temporary shoring have to accomplish?
1. Provide adequate space to perform the required work
2. Safely resist all live and dead loads while the work is
being performed
3. Maintain pre-construction conditions above/behind the
shoring system
Only distinction between “permanent” and “temporary” is
longevity
![Page 10: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/10.jpg)
ALDOT’s Approach to Temporary Shoring
206.06 – Removal of Existing Drainage and Other Facilities
• Incidental
214.05 – Structure Excavation for Minor Structures
• Incidental
215.03 – Excavation for Bridges
• 215-B: Cofferdams or Sheeting and Shoring, LS
503.03 – Structure Foundations
• 503-B: Cofferdam and Pumping, LS• Must be steel sheet piles
505.03 – Piling
• 505-I: Temporary Steel Sheet Piling, SF
529.02 – Retaining Walls
• Incidental
![Page 11: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/11.jpg)
ALDOT’s Approach to Temporary Shoring
570 – Soil Nail Retaining Wall
• 570-C: Temporary Soil Nail Wall, SY
572 – Soldier Beam and Lagging
• Has the ability to be quantified and paid for as temporary
![Page 12: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/12.jpg)
What’s in our toolbox?
2 basic types of temporary earth retention systems:
Top-down construction• Soil Nail Wall
• Soldier Pile and Lagging
• Sheet piles
Bottom-up construction• MSE
![Page 13: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/13.jpg)
Soil Nail Walls
![Page 14: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/14.jpg)
Soil Nail Walls
![Page 15: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/15.jpg)
Soil Nail Walls
![Page 16: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/16.jpg)
Soil Nail Walls
Design Considerations:
Soils must be able to stand vertical for short periods of time
Generally not recommended for use in existing fill sections
• Testing frequency
Good Assumption: Length of nails = Height of wall
• Need for temporary or permanent construction easements
Internal design by contractor
Can be installed in low-head room environments
Multiple facing options for temporary applications
Versatility: Medium
Construction Difficulty: Medium
![Page 17: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/17.jpg)
Soil Nail Walls
![Page 18: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/18.jpg)
Soil Nail Walls
![Page 19: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/19.jpg)
Soldier Pile and Lagging
![Page 20: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/20.jpg)
Soldier Pile and Lagging
![Page 21: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/21.jpg)
Soldier Pile and Lagging
![Page 22: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/22.jpg)
Soldier Pile and Lagging
![Page 23: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/23.jpg)
Soldier Pile and Lagging
Design Considerations:
Soils must be able to stand vertical for short periods of time
Recommended for cut or fill sections
Can be either cantilevered or tied back
• Need for temporary or permanent construction easements
Internal design by contractor
Versatility: High
• Soldier piles can be driven or drilled
• Cantilevered or tied-back
Construction Difficulty: Medium
![Page 24: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/24.jpg)
Sheet Piling
![Page 25: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/25.jpg)
Sheet Piling
![Page 26: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/26.jpg)
Sheet Piling
![Page 27: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/27.jpg)
Sheet Piling
![Page 28: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/28.jpg)
Sheet Piling
Design Considerations:
Can be either cantilevered or tied back
• Need for temporary or permanent construction easements
Design by Contractor
Can be driven or vibrated
Cheap
Versatility: Medium
• Requires penetration of 1-1.5 x wall height
• Relatively large deflections
Construction Difficulty: Low
![Page 29: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/29.jpg)
Temporary MSE Structures
![Page 30: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/30.jpg)
Temporary MSE Structures
![Page 31: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/31.jpg)
Temporary MSE Structures
![Page 32: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/32.jpg)
Temporary MSE Structures
![Page 33: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/33.jpg)
Temporary MSE Structures
![Page 34: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/34.jpg)
Temporary MSE Structures
![Page 35: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/35.jpg)
Temporary MSE Structures
![Page 36: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/36.jpg)
Temporary MSE Structures
Design Considerations:
Ideal for phase construction
Rapid installation
• Minimal construction equipment
Design by Contractor
Cheap
Versatility: High
Construction Difficulty: Low
Currently no Special Provision for Temporary Structures
• In progress…
![Page 37: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/37.jpg)
Final Thoughts
We have more than just sheet piles at our disposal now
Need to provide contractors adequate information to design
these systems
Every situation is unique
• There is no one-size-fits-all solution to temporary shoring
If we can identify where temporary shoring will be required,
we can provide the appropriate recommendations and
information to keep risk and bid prices down
![Page 38: Temporary Shoring - conferences.dot.state.al.us · ALDOT’s Approach to Temporary Shoring 206.06 –Removal of Existing Drainage and Other Facilities • Incidental 214.05 –Structure](https://reader030.fdocuments.net/reader030/viewer/2022040207/5e0d4f026e22203d674c4a5f/html5/thumbnails/38.jpg)
Thank You
Stephen M. (Matt) Revell, P.E.Assistant Geotechnical Engineer ALDOT Bureau of Materials & Tests