Purpose Reduce Congestion of the I15 / SR 79 (Temecula Parkway) Interchange Alleviate Exiting Traffic Backup on to the Freeway Increase Safety Accommodate Projected Future Regional Traffic Increases Features Realigned Southbound Ramps & Widening Northbound Ramps New Bridge Over Temecula Parkway With Loop Off-Ramp & Free Right Turn to Eastbound Temecula Parkway Widening of Temecula Parkway Three Through Lanes & Dual Left Turn Lanes - Both Directions Elimination of One Signalized Intersection at Southbound Ramps Additional Lanes at the intersections Triple Right Turn Lanes for Northbound Off-Ramp to Eastbound Temecula Parkway Updated ADA Curb Ramps and Refuge Islands Improved Pedestrian Access Removal of AM-PM / ARCO Gas Station Project Website 1579south.info Project Hotline (866 679-4900 Interstate 15/State Route 79 South Ultimate Interchange Temecula Parkway Interchange CONSTRUCTION FACT SHEET Location Interstate 15/State Route 79S Project Duration Begin - June 2017 Complete - Early 2019 Closures & Detours Advance Notice & Detours Info During Project Construction Contacts Avlin R. Odviar, Project Manager, City of Temecula [email protected]. | 951.693.3969 Juan Rojas, Resident Engineer, Falcon Engineering [email protected] | 951.264.6422 Dennis Green, Public Relations, Falcon Engineering 909-800-0451 | [email protected] Darcy McNaboe, Public Relations, Falcon Engineering [email protected] | phone 909-709-2612 Construction Cost $23.6 Million Awarded to Ortiz Ent. April 25, 2017 Project Partners Project Lead City of Temecula Dept. of Public Works

Transcript of Temecula Parkway Interchange CONSTRUCTION · PDF filePurpose Reduce Congestion of the I15 / SR...

Purpose Reduce Congestion of the I15 / SR 79 (Temecula Parkway) Interchange Alleviate Exiting Traffic Backup on to the Freeway Increase Safety Accommodate Projected Future Regional Traffic Increases

Features Realigned Southbound Ramps & Widening Northbound Ramps New Bridge Over Temecula Parkway With Loop Off-Ramp & Free Right Turn to Eastbound

Temecula Parkway Widening of Temecula Parkway

Three Through Lanes & Dual Left Turn Lanes - Both Directions Elimination of One Signalized Intersection at Southbound Ramps Additional Lanes at the intersections

Triple Right Turn Lanes for Northbound Off-Ramp to Eastbound Temecula Parkway Updated ADA Curb Ramps and Refuge Islands Improved Pedestrian Access Removal of AM-PM / ARCO Gas Station

Project Website 1579south.info

Project Hotline (866 679-4900

Interstate 15/State Route 79 South Ultimate Interchange

Temecula Parkway Interchange

CONSTRUCTION FACT SHEET

LocationInterstate 15/State Route 79S

Project Duration Begin - June 2017 Complete - Early 2019

Closures & DetoursAdvance Notice & Detours Info During Project

Construction Contacts Avlin R. Odviar, Project Manager, City of Temecula

[email protected]. | 951.693.3969 Juan Rojas, Resident Engineer, Falcon Engineering

[email protected] | 951.264.6422 Dennis Green, Public Relations, Falcon Engineering

909-800-0451 | [email protected] Darcy McNaboe, Public Relations, Falcon Engineering

[email protected] | phone 909-709-2612

Construction Cost$23.6 MillionAwarded to Ortiz Ent.April 25, 2017

Project Partners

Project LeadCity of TemeculaDept. of Public Works

Propósito Reducir la Congestión de la Conexion I15 / SR 79 (Temecula Parkway) Aliviar la Congestion en las Salidas de la Autopista I15 Incrementar la Seguridad Vehicular Acomodar las Vias a la Proyeccion del Trafico a Futuro

Características Realinear las Rampas en la Direccion sur y Ensanchar en la Direccion Norte Construir un nuevo Puente Sobre Temecula Parkway y Hacer un Giro a la Derecha con Acceso Libre

a la calle Temecula Parkway Direccion Norte Ampliación de la calle Temecula Parkway Tres Carriles Principales y dos Para Doblar a la Izquierda en Ambas Direcciones

Eliminación de una Intersección Señalizada en las Rampas Direccion Sur Carriles Adicionales en las Intersecciones En la Rampa de Salida Norte, Tres Carriles Para Doblar Hacia la Direccion Este de Temecula Pkwy

Mejoramiento de las Rampas Para Incapacitados y las Islas Intermedias Mejorar el Acceso Peatonal Demolicion de la Estacion AM-PM / ARCO

Sitio Web del Proyecto 1579south.info

Telefono del proyecto(866) 679-4900

Interstate 15/State Route 79 South Ultimate Interchange

Temecula Parkway Interchange

INFORMACION DEL PROYECTO

UbicaciónInterstate 15/State Route 79S

Duración del Proyecto Empieza - Junio de 2017 Termina - Principios de 2019

Cierres y DesvíosSe Notificara con Anticipacion Cierres de Vias y Rutas Alternas

Costo de Construcción$23.6 MillionAdjudicado a Ortiz Ent. el 25 de Abril de 2017

Socios del proyecto

Lider del ProyectoCuidad de TemeculaDepartamento de Obras Publicas

Contactos Durante la Construcción Avlin R. Odviar, Project Manager, City of Temecula

[email protected]. | 951.693.3969 Juan Rojas, Resident Engineer, Falcon Engineering

[email protected] | 951.264.6422 Dennis Green, Public Relations, Falcon Engineering

909-800-0451 | [email protected] Darcy McNaboe, Public Relations, Falcon Engineering

[email protected] | phone 909-709-2612