PROJECT PROFILE Project Profile Teesside GasPort ® Teesside GasPort ® CLIENT Murphy Pipelines LOCATION Px TGPP, Teesside Gas Processing Plant VALUE £4.25m DURATION 16 months PROJECT Teesside GasPort - TGP Built to accommodate the proprietary technology of Excelerate Energy’s specialised Energy Bridge Regasification Vessel fleet, the GasPort project required less land-based infrastructure than conventional onshore terminals. As a result, the project took less than a year to design, permit and construct for £40 million; one- tenth the cost of a traditional onshore terminal. The project allows the regasification vessel to revaporise gas onboard the ships and offload high pressure gas through a specially designed off-loading arm, across a jetty and into a pipeline. This delivers the gas into the National Transmission System at the Teesside Gas Processing Plant operated by PX (TGPP) Limited. The GasPort facility was commissioned in 2007 and immediately put into service to allow Excelerate Energy to deliver at peak rates of up to 600 million cubic feet of natural gas per day. It is capable of initially importing up to 4 LNG cargoes per month, each containing the equivalent of approximately three billion cubic feet of natural gas. Technica were engaged by Murphy Pipelines Ltd to design, manage and install the entire Electrical, C&I, Fire & Gas, Security and Control System scope of works. > Specification & Procurement of Electrical, C&I equipment and Material > Complete Communication System Detailed Design > Electrical Detailed Design > C&I Detailed Design > Project Management of Site Installation > Project Management of Specialist Sub-Contractors (including ESD Systems, DCS, Offloading Arm and Marine Berthing Systems) > Factory Acceptance Tests > Site Acceptance Tests > Electrical, C&I and Communications Installation (including 6.5km Dual Redundant Fibre Optic Backbone) > Site Test and Commissioning > Ongoing Support for Site Optimisation

Transcript of Teesside GasPort

PROJECT PROFILE

Proj

ect P

rofil

eTe

essi

de

Gas

Port

®

Teesside GasPort®

CLIENT Murphy Pipelines

LOCATION Px TGPP, Teesside Gas Processing Plant

VALUE £4.25m

DURATION 16 months

PROJECT Teesside GasPort - TGP

Built to accommodate the proprietary technology of Excelerate Energy’s specialised Energy Bridge Regasification Vessel fleet, the GasPort project required less land-based infrastructure than conventional onshore terminals. As a result, the project took less than a year to design, permit and construct for £40 million; one-tenth the cost of a traditional onshore terminal.

The project allows the regasification vessel to revaporise gas onboard the ships and offload high pressure gas through a specially designed off-loading arm, across a jetty and into a pipeline. This delivers the gas into the National Transmission System at the Teesside Gas Processing Plant operated by PX (TGPP) Limited.

The GasPort facility was commissioned in 2007 and immediately put into service to allow Excelerate Energy to deliver at peak rates of up to 600 million cubic feet of natural gas per day. It is capable of initially importing up to 4 LNG cargoes per month, each containing the equivalent of approximately three billion cubic feet of natural gas.

Technica were engaged by Murphy Pipelines Ltd to design, manage and install the entire Electrical, C&I,Fire&Gas,SecurityandControlSystemscope of works.

> Specification&ProcurementofElectrical,C&IequipmentandMaterial

> Complete Communication System Detailed Design

> Electrical Detailed Design

> C&IDetailedDesign

> Project Management of Site Installation

> Project Management of Specialist Sub-Contractors (including ESD Systems, DCS, Offloading Arm and Marine Berthing Systems)

> Factory Acceptance Tests

> Site Acceptance Tests

> Electrical,C&IandCommunicationsInstallation (including 6.5km Dual Redundant Fibre Optic Backbone)

> Site Test and Commissioning

> Ongoing Support for Site Optimisation

To underwrite our customer promise, the Company has introduced Technica Spectrum as its badge of total commitment to project delivery and success. Each element of our delivery - Design, Construct, Manage and Support - is geared to ensure that we partner you throughout, from the initial discussions and feasibilities, to completion and final hand-over of the project.

You also have the added comfort of knowing that our quality assured systems and customer focused approach to business relationships builds on our considerable expertise gained over many years in the industry.

To ensure success, our large in-house support team, breadth of skills and the vast experience of directors and engineers are harnessed to your benefit throughout.

TECHNICA LIMITED TOTAL ENGINEERING SOLUTIONS

TRUST THE EXPERTSTechnica provide a range of turnkey design and construction services to some of the world’s foremost energy companies. A range of services can be provided from front-end engineering design, to round-the-clock support following construction completion. Technica will work with you every step of the way to ensure all your project requirements are met.

Since 2003, we have specialised in single-source solutions managed by a core of professional engineers. Our knowledge and experience in the design, construction, commissioning and maintenance of industrial systems enables us to successfully complete multi-million pound projects throughout the world.

Our specialist team includes chartered engineers, design engineers, project managers, software engineers and consultants who ensure that all Technica-designed and produced systems are technically and physically robust, highly efficient, innovative and problem free.

> Safety, health and environmental accreditations

> Privately owned, independent company

> Established in 2003

> Bespoke engineering solutions for the global energy supply industry

> International customer base includes the world’s largest energy companies

Technica Limited

Cherry Tree Business Park, Estate Road No.5, Grimsby DN31 2TX. UK

t: +44 (0)1472 268 007 e: [email protected] w: www.technicaltd.com